Banking and Finance Government Departments Closing in 11 days TDR #57997688

Tender For Addition Alteration Works In Regional Director Chamber, Main Office Building, Rbi Lucknow

Issued by Government Departments · Lucknow, Uttar Pradesh
Tender Value
19.06 Lakhs
Estimated cost
Bid Submission
02 Nov 2026
11 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Lucknow → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Addition Alteration Works In Regional Director Chamber, Main Office Building, Rbi Lucknow

BOQ

Name of Work:- Addition Alteration works in Regional Director Chamber, Main Office Building, RBI Lucknow
Sl. No. Item Description
1Renovation of RD Cabin
2Carefully dismantling of false ceiling including disposal of unserviceable material and including stacking of serviceable material and disposal of unserviceable/debris material from the Bank's premises etc. all complete as directedby the Engineer-in-charge.
3Carefully dismantling of expanded metal of false celing support system or I.R.C. fabrics with necessary battens and beading of roofs and walls including including stacking of serviceable material and disposal of unserviceable/debris material from the Bank's premises etc. all complete as directedby the Engineer-in-charge.
4Carefully dismantling and removal of of carpet flooring including stacking of serviceable material and disposal of unserviceable/debris material from the Bank's premises etc. all complete as directedby the Engineer-in-charge.
5Carefully dismantling wooden panelling in lining of walls and partitions, excluding supporting members but including stacking of serviceable material etc. all complete as directedby the Engineer-in-charge.
6Carefully dismantling of concrete/ brickwork/ kota stone raised flooring upto floor finish level. The rate shall also include repairing and finish of floor levelled upto near by existing floor.The rate shall also include carefully removal and reinstallation of stainless steel railings and protecting nearby glass wall,floors, column and other structures etc. with suitable measures and protecting prop or temporary arrangements.The rates shall also include stacking of serviceable material and disposal of unserviceable/debris material from the Bank's premises etc. all complete as directedby the Engineer-in-charge.Approximate particulars of Offset structures- Height-0.18mtr, Length-7 mtr, Width-1.03 mtr
7Providing and fixing black powder coated Aluminium skeleton frame work, formed by using square/rectangular tabular sections of size 63.50X 38.10X 2.00 mm (unit weight = 1.054 kg/meter, Jindal make Section No. - 14013) mm of approved make, for verticals and horizontals spaced not more than 600 mm centre to centre i.e. making c/c grid of 600 mm X 600mm, fixed to RCC roof & floor with the heavy duty aluminium cleats of size 38.1x25.4x2.36 mm (Unit Weight= 0.39 Kg/mtr. Section no.16749 ) (alternate members shall be extended upto ceiling and fixed firmly with angle cleat arrangement). Extra horizontal member shall be provided at raceway/skirting level. All the vertical/ horizontal members shall be core cut properly of directed sizes and numbers at the junction of raceway or any other locations directed by Bank's engineers for crossing electrical/data cabling/conduits etc.}
8Gypsum Board False Ceiling on existing frame:Providing and fixing suspended type 12.5 mm thick tapered edge gypsum moisture resistant board false ceiling system, coving and for column capitals in different levels, firmly fixed on existing metal frame comprised of existing ceiling channels all complete as directed by Bank's Engineer. Rate shall be inclusive of removing, shifting, welding, repairing, re-fixing etc. work of the alignment of existing hangers, channels, bolts, fasteners, etc. required for the false ceiling. Rate shall also include providing and fixing new framing sections in 10-%15% of the ceiling area (Gypserra Metal Framing System of M/s Gyproc or approved equivalent) for replacing the damaged/disturbed framework and for making Coving (approx. 10-15% of the total frame may be considered/damaged during dismantling and making coving). The nails/screws of the existing frame which are attached to the gypsum board are to be removed by manual means without damaging the frame and keeping the alignment of the frame. Work includes jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per the specifications and direction of the Engineer in Charge but excluding the cost of painting.Joint of gypsum board to be taped 3 times and sealed with jointed compound. Cost includes providing and fixing of coves, patta, etc. Clear finished surface of the false ceiling and vertical boards will be measured for payment.
9Gypsum Board False Ceiling with new frame:Providing and fixing 12.5 mm thick tapered edge gypsum moisture resistant board false ceiling at all height including providing and fixing of frame work made of special sections, power pressed from M.S. sheets and galvanized with zinc coating of 120 gms/sqm (both side inclusive) as per IS : 277 and consisting of angle cleats of size 25 mm wide x 1.6 mm thick with flanges of 27 mm and 37mm, at 1200 mm centre to centre, one flange fixed to the ceiling with dash fastener 12.5 mm dia x 50mm long with 6mm dia bolts, other flange of cleat fixed to the angle hangers of 25x10x0.50 mm of required length with nuts & bolts of required size and other end of angle hanger fixed with intermediate G.I. channels 45x15x0.9 mm running at the spacing of 1200 mm centre to centre, to which the ceiling section 0.5 mm thick bottom wedge of 80 mm with tapered flanges of 26 mm each having lips of 10.5 mm, at 450 mm centre to centre, shall be fixed in a direction perpendicular to G.I. intermediate channel with connecting clips made out of 2.64 mm dia x 230 mm long G.I. wire at every junction, including fixing perimeter channels 0.5 mm thick 27 mm high having flanges of 20 mm and 30 mm long, the perimeter of ceiling fixed to wall/partition with the help of rawl plugs at 450 mm centre, with 25mm long dry wall screws @ 230 mm interval, including fixing of gypsum board to ceiling section and perimeter channel with the help of dry wall screws of size 3.5 x 25 mm at 230 mm c/c, including jointing and finishing to a flush finish of tapered and square edges of the board with recommended jointing compound, jointing tapes, finishing with jointing compound in 3 layers covering upto 150 mm on both sides of joint and two coats of primer suitable for board, all as per manufacturer's specification and also including the cost of making openings for light fittings, grills, diffusers, cutouts made with frame of perimeter channels suitably fixed, all complete as per the specifications and direction of the Engineer in Charge but excluding the cost of painting.
10Providing and fixing 12 mm thick plywood panelling with teak wood veneer on existing new or old partition, wall or ceiling with back framing as per the detail drawings. The back framing (framing and veneer item shall be paid separately) shall be covered with 8.0 mm thick commercial MR Grade plywood fixed with suitable size of nails/screws and finished with 4.0 mm thick teak veneer of the desired finish and design with panel size as required and with 3mm- 5mm width grooves as per the design as as directed by the Engineer-in-charge. The teak veneer shall be carefully pasted with white adhesive synthetic adhesive over plywood in desired design and drawing. Plywood shall conforming to IS 710: 2024
11Providing and fixing 4mm thick veneer of the desired finish and design over plywood on wall or ceiling as required and with 3mm- 5mm width grooves as per the design (Annex-I) (wherever required) including priming coat on unexposed surface. The teak veneer shall be carefully pasted with Synthetic Resin-based waterproof wood adhesive (Fevicol Marine or approvd equivalent), nails over 12 mm thick plywood ( which will be shall seperately) in desired design and drawing etc. all complete as directed by the Engineer-in-charge. Note: Basic rate of veneer is 1000/- per Sqm. Exclusive of taxes, cartage and CP
12Providing wood work in Second class teak wood in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia & length (hold fast lugs or dash fastener shall be paid for separately)
13Providing and fixing ISI marked flush door shutters conforming to IS : 2202 (Part I) non-decorative type, core of block board construction with frame of 1st class hard wood and well matched commercial 3 ply veneering with vertical grains or cross bands and face veneers on both faces of shutters. 35 mm thick including 4 nos Stainless Steel ball bearing hingesfor each shutter with necessary screws.
14Extra for providing lipping with 2nd class teak wood battens 12 mm minimum depth on all edges of flush door shutters (over all area of door shutter to be measured).
15Providing and fixing followings fittings to the door1). 2 Nos Brass Handles - Basic price for each piece is 3000/- per Sqm. Exclusive of taxes, cartage and CP2). 1 No Mortise lock with cover - Basic price for each piece is 2800/- per Sqm. Exclusive of taxes, cartage and CP3). 1 No Tower bolt of 450 mm long - Basic price for each piece is 500/- per Sqm. Exclusive of taxes, cartage and CP3). 1 No Tower bolt of 300 mm long - Basic price for each piece is 250/- per Sqm. Exclusive of taxes, cartage and CP5). Providing and fixing brass Door Closure -Basic price for each piece is 2500/- per Sqm. Exclusive of taxes, cartage and CP
16Providing, laying and installation of Banks' approved engineered wooden flooring of approved shade, design and finish.The flooring shall be laid over 40 micron thick polythene sheet (moisture barrier) and 2.00 mm thick foam underlay, over a properly prepared, clean, dry, level and even sub-floor, including and cutting, complete as per manufacturer's specifications and directions of the Engineer-in-ChargeNote: Basic rate of Engineered wooden flooring is Rs. 7302/- per Sqm. Exclusive of taxes, cartage and CP
17Providing, laying & Installation of readymade wooden profile beading along polished wall corner areas, skirting on non polished wall area and reducer/Tee floor profile under doors, end areas and other appropriate locations along with wooden flooring to be supplied in same colour as of flooring. Joints shall be properly metered and matched to form a seam less surface. The final finished product shall include all corner profiles, floor profiles and accessories for complete installation to the entire satisfaction of engineer incharge.
18Providing and Finishing walls, ceiling or any other other surface with two or more coats of premium acrylic emulsion paint of interior grade, having VOC (Volatile Organic Compound ) content less than 50 grams/ litre of approved brand and manufacture, including applying additional coats wherever required to achieve even shade and colour.
19Melamine Polish on New WorkProviding and Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. The surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos.2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs.4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.)
20Melamine Polish on Old workProviding and Polishing in high gloss/matt finish melamine clear polish on wood work in required color/wooden shade texture with following process in the sequence as detailed below:1. Remove the old existing polish and surface to be polished is rubbed with sand paper 80/120 no. and then with sand paper of 160/180 nos.2. Applying two coats of sealer with spray gun and allowing sufficient drying time for 1st coat and 2nd coat is allowed to dry for 8 to 12 hrs.3. On drying of sealer coat, wet rubbing with emery cloth of finer grading with ample water to remove excess sealer layer and make the surface further smooth after this wet rubbing, then surface is applied with special grade melamine fillers to fill all the small and big holes/grooves etc. Filler coat to be allowed to dry for 4 to 6 hrs on which again a light wet rubbing is done this surface is further allowed to dry for 12 hrs.4. On this, 1st coat of melamine polish is applied with spray gun using melamine clear polish and melamine thinner in required proportion. This 1st coat is allowed to dry for 24 hrs then this dry surface is again fine wet rubbed smooth, which is further allowed to dry for 12 hrs. The final melamine polish is applied with compressor pressure spray gun using melamine clear polish and melamine thinner mixed in required proportion complete as per direction of Engineer-in-Charge. (Final coat to be done in 1 or 2 layers without gap of time.)
21Carefully shifting of furnitures etc. from Regional Director existing Office to temporary office at Third Floor or at any other location with suitable packing etc. for its protection during the execution of work and shift back all the furniture back to the same office after completion of work.The number of furniture may decrease or increase as per the requirement of the office. Tentative list of furnitures to be shifted are as below:(i) Regional Director Table-1 no.(ii) Regional Director Chair- 1 no.(iii) Visitor Chair-5 no.(iv) Sofa -3 Seater- 3 no.(v) Wooden Center table (1.12 mx 1.12 m)-1 no.(vi) Small side table- 4 no.(vii) Glass wooden almirah-1 no.(viii) Book shelf- 1no.(ix) wooden side cabinet-2 no.(x) Glass Almirah (with trophies)- 1no.(xi) Wooden half almirah- 1no.(xii) Paintings-5 nos.
22Carefully shifting and protecting of furnitures from its existing locations during execution of work like wooden flooring work etc. and place the furnitures to their previous locations on the same floor within 10 metre distance.Tentative list of furnitures to be shifted are as below:(i) Fire resistant filing cabinet (FRFC) in RD office- 1no.(ii) All furnitures and accesories of RD personal secretary office, outer reception area, darban area and his office.
23Carefully carrying out removal and reinstallation of doors and necessary addition/alteration in wooden partition and doors for installation of wooden flooring underneath- Double leaf glass door
24Carefully carrying out removal and reinstallation of doors and necessary addition/alteration in wooden partition and doors for installation of wooden flooring underneath -Single leaf wooden door Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57997688
AUTHORITY Government Departments
TENDER VALUE 19.06 Lakhs
LAST DATE 02-11-2026
Authority
Authority Name reserve bank of india
Work Description Tender For Addition Alteration Works In Regional Director Chamber, Main Office Building, Rbi Lucknow
Basic Detail
Tender No RBI LKO Renovation of RD Cabin
Bidding Type Tender
Location
City Lucknow
State Uttar Pradesh
Key Dates
Publish Date 12 Oct 2026
Submission Date 02 Nov 2026
Open Date 03 Nov 2026
Finance
Tender Value 19.06 Lakhs
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
58601faa-90c1-43dc-9c32-3e92284c3523.html
BOQ_342967.xls
ETender-Addition_Alterati_1.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Nov 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 12 days

Tender Documents

Download All (ZIP) ↓
html

58601faa-90c1-43dc-9c32-3e92284c3523.html

xls

BOQ_342967.xls

pdf

ETender-Addition_Alterati_1.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender