Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - 132 Kv Substation; Electrical System Or Installation; Service Provider - Erection, Commissioning And Testing Of Sps At 400Kv Substation Jaunpur .The Job Includes Laying Of Fiber Optic Cable And Its Termination With Proper Size Of Glands & Ferrulling ,Erection Of Rtu ,Transducer ,Ofc Patch Cord Etc Alongwith Other Related Material And Equipments For Sps And To Intregrate With Existing Ge Make Sps System To Complete The Job Satisfactory In All Respect. , Erection And Commissioning Material Are Attached , Fully Wired Standalone Panel With Required Accessories, Design & Engineering And 48 V Dc Power Supply With The Following Electronics: , 19 Rtu Rack , Rtu E70 16 I/O-Slot Backplane For 19 Subrack , Rtu E70 Rack Power Supply Unit , Rtu E70 Cpu, 2 Lan, 4 Serial Ports , Rtu E70 Digital Input Module, Pos Logic, 48Vdc , Rtu E70 Analog Input Module, 12 Ch, Voltage/Current Input , Rtu E70 Digital Output Module, 16 Ch(2 Groups Of 8), Relay Output , Heavy Duty Relay In Rtu Panel , Timer Relay For Watch Dog , Hooter For Watch Dog , Power Supply 220 Vdc Input To 48 Vdc Output , Transducer Internal Wiring And Communication Cables , 4-20 Ma Signat Cable For Transducer Output From C&R Panels Of Line Gt-1 & Bt-2 To Plc 3 Core Stranded Copper (0.5Mm2) Armoured (Shielded) , Digital Input Cable To Plc Fur Main The Breaker Status Of Gt-1, Gt 2, Obra-C To Obra-B Line 5 Core Standard Copper Cable 1.5 Mm2, Armoured , Digital Output Cable From Rtu Panel To Dcs 6 Core (2.5Mm2) Standard Copper Armoured Cable , 220 Vac/Voc Power Supply Cable From 220 Vdc Source To Rtu 3 Core (2.5Mm2) Standard Copper Armoured Cable , Transducer Ct Input (R,Y,B Phase) Cable In C&R Panels & Feeders Single Core Wire (2.5 Mm2) , Transducer Power Supply Single Core Wire (1.5Mm2) , Lan Cable Between Rtu And Computer (Cat6) , Ofc Patch Cords And Lius , Supply Of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode , Supply Of Hdpe Pipe, 40Mm Dia , Supply Of 6 Port Liu With Fully Populated , Supply Ofc Patch Cords (Each 5 Mtr) , Supply Of Fiber To Ethernet Media Converter , Plc Programming Software , Scada Software With License And Server Grade Computer Of Minimum Configuration As Intel Xeon Cpu 4Core, 2.80 Ghz, 16 Gb Main Memory, 1 Tb Sata Hdd, 19.5 Inch Colot Tft Monitor, Key Board, Mouse, 2 Nos. 10/100/1000 Mbps Ethernet Port, Usb Port, 600Va Ups, Ac Power Extension Board, Server 2022 (Furniture Supply Under The Scoper Of Contractor) , Current Transducer , 3 Phase Current Transducer 220Vdc, 4-20Ma Output, Class-0.2, Ctr- 5A, Auxillary Supply - 220 Vdc (Make: Ael/Pyrotech/Elster) , Design And Drawing , Shifting Of All Sps Material (Including Loading And Unloading ) From Robertsganj Store To 400 Kv Obra C Site (Around 40 Km) And Then Shifting All Material To Erection And Commisioning Place In 400 Kv Obra C Switchyard , Erection,Commissioning And Testing Of Sps At Obra C End .The Job Includes Laying Of Fiber Optic Cable And Its Termination With Proper Size Of Glands & Ferrulling ,Erection Of Rtu ,Transducer ,Ofc Patch Cord Etc Alongwith Other Related Material And Equipments For Sps And To Intregrate With Existing Ge Make Sps System To Complete The Job Satisfactory In All Respect . , Erection And Commissioning Material Are Attached , Fully Wired Standalone Panel With Required Accessories, Design & Engineering And 48 V Dc Power Supply With The Following Electronics: , 19 Rtu Rack , Rtu E70 16 I/O-Slot Backplane For 19 Subrack , Rtu E70 Rack Power Supply Unit , Rtu E70 Cpu, 2 Lan, 4 Serial Ports , Rtu E70 Digital Input Module, Pos Logic, 48Vdc , Rtu E70 Analog Input Module, 12 Ch, Voltage/Current Input , Rtu E70 Digital Output Module, 16 Ch(2 Groups Of 8), Relay Output , Heavy Duty Relay In Rtu Panel , Timer Relay For Watch Dog , Hooter For Watch Dog , Power Supply 220 Vdc Input To 48 Vdc Output , Transducer Internal Wiring And Communication Cables , 4-20 Ma Signat Cable For Transducer Output From C&R Panels Of Line Gt-1 & Bt-2 To Plc 3 Core Stranded Copper (0.5Mm2) Armoured (Shielded) , Digital Input Cable To Plc Fur Main The Breaker Status Of Gt-1, Gt 2, Obra-C To Obra-B Line 5 Core Standard Copper Cable 1.5 Mm2, Armoured , Digital Output Cable From Rtu Panel To Dcs 6 Core (2.5Mm2) Standard Copper Armoured Cable , 220 Vac/Voc Power Supply Cable From 220 Vdc Source To Rtu 3 Core (2.5Mm2) Standard Copper Armoured Cable , Transducer Ct Input (R,Y,B Phase) Cable In C&R Panels & Feeders Single Core Wire (2.5 Mm2) , Transducer Power Supply Single Core Wire (1.5Mm2) , Lan Cable Between Rtu And Computer (Cat6) , Ofc Patch Cords And Lius , Supply Of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode , Supply Of Hdpe Pipe, 40Mm Dia , Supply Of 6 Port Liu With Fully Populated , Supply Ofc Patch Cords (Each 5 Mtr) , Supply Of Fiber To Ethernet Media Converter , Plc Programming Software , Scada Software With License And Server Grade Computer Of Minimum Configuration As Intel Xeon Cpu 4Core, 2.80 Ghz, 16 Gb Main Memory, 1 Tb Sata Hdd, 19.5 Inch Colot Tft Monitor, Key Board, Mouse, 2 Nos. 10/100/1000 Mbps Ethernet Port, Usb Port, 600Va Ups, Ac Power Extension Board, Server 2022 (Furniture Supply Under The Scoper Of Contractor) , Current Transducer , 3 Phase Current Transducer 220Vdc, 4-20Ma Output, Class-0.2, Ctr- 5A, Auxillary Supply - 220 Vdc (Make: Ael/Pyrotech/Elster) , Design And Drawing , Shifting Of All Sps Material (Including Loading And Unloading ) From Robertsganj Store To 400 Kv Obra C Site (Around 40 Km) And Then Shifting All Material To Erection And Commisioning Place In 400 Kv Obra C Switchyard
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Erection, commissioning and testing of SPS at 400kV Substation Jaunpur .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect. | Erection, commissioning and testing of SPS at 400kV Substation Jaunpur .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect. |
| 2 | Erection and Commissioning material are attached | Erection and Commissioning material are attached |
| 3 | Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics: | Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics: |
| 4 | 19 RTU Rack | 19 RTU Rack |
| 5 | RTU E70 16 I/O-slot backplane for 19\\" subrack | RTU E70 16 I/O-slot backplane for 19\\" subrack |
| 6 | RTU E70 Rack Power Supply Unit | RTU E70 Rack Power Supply Unit |
| 7 | RTU E70 CPU, 2 LAN, 4 Serial ports | RTU E70 CPU, 2 LAN, 4 Serial ports |
| 8 | RTU E70 Digital Input Module, Pos Logic, 48VDC | RTU E70 Digital Input Module, Pos Logic, 48VDC |
| 9 | RTU E70 Analog Input Module, 12 ch, Voltage/Current input | RTU E70 Analog Input Module, 12 ch, Voltage/Current input |
| 10 | RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output | RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output |
| 11 | Heavy Duty Relay in RTU panel | Heavy Duty Relay in RTU panel |
| 12 | Timer relay for watch dog | Timer relay for watch dog |
| 13 | Hooter for Watch Dog | Hooter for Watch Dog |
| 14 | Power Supply 220 VDC input to 48 VDC output | Power Supply 220 VDC input to 48 VDC output |
| 15 | Transducer internal Wiring and Communication cables | Transducer internal Wiring and Communication cables |
| 16 | 4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded) | 4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded) |
| 17 | Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured | Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured |
| 18 | Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable | Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable |
| 19 | 220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable | 220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable |
| 20 | Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2) | Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2) |
| 21 | Transducer Power Supply Single core wire (1.5mm2) | Transducer Power Supply Single core wire (1.5mm2) |
| 22 | LAN Cable between RTU and Computer (CAT6) | LAN Cable between RTU and Computer (CAT6) |
| 23 | OFC Patch Cords and LIU's | OFC Patch Cords and LIU's |
| 24 | Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode | Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode |
| 25 | Supply of HDPE Pipe, 40mm Dia | Supply of HDPE Pipe, 40mm Dia |
| 26 | Supply of 6 Port LIU with fully populated | Supply of 6 Port LIU with fully populated |
| 27 | Supply OFC PATCH Cords (each 5 mtr) | Supply OFC PATCH Cords (each 5 mtr) |
| 28 | Supply of Fiber to Ethernet Media Converter | Supply of Fiber to Ethernet Media Converter |
| 29 | PLC Programming Software | PLC Programming Software |
| 30 | SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor) | SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor) |
| 31 | Current Transducer | Current Transducer |
| 32 | 3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster) | 3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster) |
| 33 | Design and Drawing | Design and Drawing |
| 34 | Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard | Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard |
| 35 | Erection,commissioning and testing of SPS at Obra 'C' end .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect . | Erection,commissioning and testing of SPS at Obra 'C' end .The job includes laying of Fiber optic cable and its termination with proper size of Glands & ferrulling ,erection of RTU ,Transducer ,OFC patch cord etc alongwith other related material and equipments for SPS and to intregrate with existing GE make SPS system to complete the job satisfactory in all respect . |
| 36 | Erection and Commissioning material are attached | Erection and Commissioning material are attached |
| 37 | Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics: | Fully wired standalone panel with required accessories, design & engineering and 48 V DC Power supply with the following electronics: |
| 38 | 19 RTU Rack | 19 RTU Rack |
| 39 | RTU E70 16 I/O-slot backplane for 19\\" subrack | RTU E70 16 I/O-slot backplane for 19\\" subrack |
| 40 | RTU E70 Rack Power Supply Unit | RTU E70 Rack Power Supply Unit |
| 41 | RTU E70 CPU, 2 LAN, 4 Serial ports | RTU E70 CPU, 2 LAN, 4 Serial ports |
| 42 | RTU E70 Digital Input Module, Pos Logic, 48VDC | RTU E70 Digital Input Module, Pos Logic, 48VDC |
| 43 | RTU E70 Analog Input Module, 12 ch, Voltage/Current input | RTU E70 Analog Input Module, 12 ch, Voltage/Current input |
| 44 | RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output | RTU E70 Digital Output Module, 16 ch(2 groups of 8), relay output |
| 45 | Heavy Duty Relay in RTU panel | Heavy Duty Relay in RTU panel |
| 46 | Timer relay for watch dog | Timer relay for watch dog |
| 47 | Hooter for Watch Dog | Hooter for Watch Dog |
| 48 | Power Supply 220 VDC input to 48 VDC output | Power Supply 220 VDC input to 48 VDC output |
| 49 | Transducer internal Wiring and Communication cables | Transducer internal Wiring and Communication cables |
| 50 | 4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded) | 4-20 mA signat cable for Transducer output from C&R Panels of Line GT-1 & BT-2 to PLC 3 core stranded copper (0.5mm2) Armoured (shielded) |
| 51 | Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured | Digital Input Cable to PLC fur Main The Breaker Status of GT-1, GT 2, Obra-c to Obra-b line 5 Core Standard Copper Cable 1.5 mm2, Armoured |
| 52 | Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable | Digital Output Cable from RTU Panel to DCS 6 core (2.5mm2) standard copper armoured cable |
| 53 | 220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable | 220 VAC/VOC Power Supply Cable from 220 VDC source to RTU 3 Core (2.5mm2) standard copper armoured cable |
| 54 | Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2) | Transducer CT Input (R,Y,B Phase) cable in C&R Panels & Feeders single core wire (2.5 mm2) |
| 55 | Transducer Power Supply Single core wire (1.5mm2) | Transducer Power Supply Single core wire (1.5mm2) |
| 56 | LAN Cable between RTU and Computer (CAT6) | LAN Cable between RTU and Computer (CAT6) |
| 57 | OFC Patch Cords and LIU's | OFC Patch Cords and LIU's |
| 58 | Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode | Supply of 6 Core Outdoor Armoured Fiber Optic Cable, Single Mode |
| 59 | Supply of HDPE Pipe, 40mm Dia | Supply of HDPE Pipe, 40mm Dia |
| 60 | Supply of 6 Port LIU with fully populated | Supply of 6 Port LIU with fully populated |
| 61 | Supply OFC PATCH Cords (each 5 mtr) | Supply OFC PATCH Cords (each 5 mtr) |
| 62 | Supply of Fiber to Ethernet Media Converter | Supply of Fiber to Ethernet Media Converter |
| 63 | PLC Programming Software | PLC Programming Software |
| 64 | SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor) | SCADA Software with license and Server grade computer of minimum configuration as Intel Xeon CPU 4core, 2.80 Ghz, 16 GB main memory, 1 TB SATA HDD, 19.5 inch colot TFT monitor, Key Board, Mouse, 2 Nos. 10/100/1000 mbps Ethernet port, USB Port, 600VA UPS, AC Power Extension Board, Server 2022 (Furniture supply under the scoper of contractor) |
| 65 | Current Transducer | Current Transducer |
| 66 | 3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster) | 3 Phase Current Transducer 220VDC, 4-20mA Output, Class-0.2, CTR- 5A, Auxillary Supply - 220 VDC (Make: AEL/Pyrotech/Elster) |
| 67 | Design and Drawing | Design and Drawing |
| 68 | Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard | Shifting of all SPS material (including loading and unloading ) from Robertsganj store to 400 KV Obra C site (around 40 km) and then shifting all material to erection and commisioning place in 400 KV OBRA C switchyard |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender