Tender For Part -I Tender For providing New 11/.4Kv 100Kva S/Stn In Village Chattar Samkaria To Solve Low Voltage Problem In Village Chattar Samkaria In Section Chattar Uesd Rehan.Ts No. Fed-29/2026-27Part-Iitender For providing New 11Kv Ht Line To N
Tender Overview
Project Description
Tender for Part -I Tender For providing New 11/.4Kv 100Kva S/Stn In Village Chattar Samkaria To Solve Low Voltage Problem In Village Chattar Samkaria In Section Chattar Uesd Rehan.Ts No. Fed-29/2026-27Part-Iitender For providing New 11Kv Ht Line To Newly Proposed 11/0.4Kv 100 Kva Dtr In Village Chattar Samkaria In Section Chattar Uesd Rehan..Ts No. Fed-30/2026-27Part-Iiitender For Re-Organization Of Ld System From 11/0.4 Kv 250 Kva Chattar Khas By Augmentation Of Single Phase Lt Line To 3 Phase Lt Line And Proposal Of New Three Phase Lt Line For Newly Proposed 11/0.4 Kv 100 Kva Dtr In Village Chattar Samkaria In Section Chattar Esd Rehan.Ts No. Fed-31/2026-27
BOQ
| Sl. No. | Item Description |
| 1 | Part-I |
| 2 | Distribution Transformer(Outdoor Type), 11/0.4KV,100KVA Provided By HPSEBL |
| 3 | Steel Tubular Poles 12mtr Long along with base Plate Provided By HPSEBL |
| 4 | Muffs with concerete fillings |
| 5 | X-Arm:[Channel Iron(100X50X5mm,Length:2800mmX2Nos. |
| 6 | MS Angle Iron (50X50X5mm),Length:2800mm |
| 7 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 8 | Transformer Belting & Knee Bracing X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed |
| 9 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
| 10 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 11 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
| 12 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
| 13 | Transformer LT Distribution Box and GO Switch fixing assembly :- MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 14 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 15 | GO Switch Handle Supporting: [Channel Iron (75x40x6 mm), Length : 460 mm |
| 16 | GO AB switch unit (11kV , 400A,25kA) Triplle Pole O/D type |
| 17 | DO Fuse Unit |
| 18 | Surge Arrester, 9KV Station Class(Porcelain Type) |
| 19 | Discs Insulator Sets 11KV |
| 20 | Stay Set HT 11KV Complete |
| 21 | Stay Wire (7/3.15mm)(6.0Kg per stay set) |
| 22 | HT Pipe Earthing Set(MS Plate earthing) |
| 23 | LT Distribution Pannel Box with MCCB(100A,35KA,3P,1No)& SFU(32A,4No. Rewirable) |
| 24 | Half Clamp |
| 25 | Full Clamp |
| 26 | Nuts& Bolts of Various Sizes G.I. Coated |
| 27 | Aluminium Thimbles |
| 28 | Copper Thimbles |
| 29 | Danger Plate |
| 30 | Barbed Wire |
| 31 | LT Cable(3.5 Core 95mm2) |
| 32 | Energy Meter(3-Phase,4 Wire) DLMS Compliant 100/5 A CT Type for 63KVA Transformer |
| 33 | Aluminium Paint |
| 34 | 11kV Pin insulator (Porcelain,12kV,10kN) 03 No. per double pole Structure |
| 35 | Erections Charges |
| 36 | Part-IIProv.ACSR 6/1/3.35mm Conductor Provided By HPSEBL |
| 37 | Prov.Steel Tubular 9MTR Pole along with base plate Provided By HPSEBL |
| 38 | Prov.Muff with Concerete Filling |
| 39 | Run Thro Structure:-Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) |
| 40 | MS Angle Iron Length 750mm X 2 |
| 41 | Pole Top Bracket |
| 42 | 11kV Pin insulator (Porcelain,12kV,10kN) 03 No. per double pole Structure |
| 43 | Discs Insulator Sets 11KV |
| 44 | HT Stay / Guy Arrangement:-Stay Set Complete |
| 45 | Stay Wire (7/3.15mm)(6.0Kg per stay set) |
| 46 | Earth Wire [GI 8 SWG] |
| 47 | Eye Hook for Earth Wire |
| 48 | Earth Hook |
| 49 | Half Clamp |
| 50 | Full Clamp |
| 51 | Danger Plate |
| 52 | Nuts& Bolts of Various Sizes G.I. Coated |
| 53 | Barbed Wire |
| 54 | Red oxide |
| 55 | Aluminium Paint |
| 56 | Erection Charges of Conductor 50mm2 |
| 57 | Erection Charges of GI Wire |
| 58 | Erection Charges of Single Pole 09mtrs |
| 59 | Erction charges of HT Stay |
| 60 | Part-IIIProv.AAAC Conductor 7/3.15mm2 Provided By HPSEBL |
| 61 | Steel Tubular Poles 8mtr Long along with base Plate Provided By HPSEBL |
| 62 | Muffs with concerete fillings |
| 63 | Angle Iron [75*40*6MM] Length 600MM |
| 64 | Prov.Shackle Insulators |
| 65 | Prov.D-Iron |
| 66 | Prov.LT Stay Set |
| 67 | Prov.LT Stay Wire |
| 68 | Full Clamp |
| 69 | Earth Wire [GI 8 SWG] |
| 70 | LT Earthing Set |
| 71 | Nuts& Bolts of Various Sizes G.I. Coated |
| 72 | Aluminuim Paint |
| 73 | Red oxide |
| 74 | LT AB Cable 4*70+1*70+16mm2 |
| 75 | Erection Charges of Conductor 50mm2 |
| 76 | Erection Charges of GI Wire |
| 77 | Erection Charges of ST Poles |
| 78 | Erction Charges of LT Stay |
| 79 | Erection Charges of LT Earthing Set |
| 80 | Erection Charges LT AB Cable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender