Tender For Replacement Of Fire Detection And Automation System Of Rim Seal Fire Protection System For Ss01 To Ss18 At Wrpl Vadinar
Tender Overview
Project Description
Tender for Replacement Of Fire Detection And Automation System Of Rim Seal Fire Protection System For Ss01 To Ss18 At Wrpl Vadinar
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 26-Oct-2026 | Date Corrigendum - I | Date | 02-Nov-2026 |
| 2 | 26-Oct-2026 | Technical Corrigendum - I | Technical Bid | 02-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply Part of Total Work |
| 2 | Thermocable ProReact Plus Digital Linear Heat Detection Cable (85 Deg C /110 Deg C ) or equivalent |
| 3 | LHS controller: PEPPERL+FUCHS KFD2-GUT-Ex1.D or equivalent |
| 4 | Allen-Bradley Micro 850 controller paired with the 2080-IF4 or equivalent (18 for each tank) |
| 5 | Allen Bradley CompactLogix or equivalent (Master PLC) |
| 6 | MOXA SWITCH EDS-405A (2 optical + 3 Ethernet) or equivalent |
| 7 | FLP Junction Box (Signal) - complete supply of all components - 15 Nos. 24V DC relays, MCBs, TBs from 50IOs |
| 8 | FLP Junction Box (Tank Roof) - complete supply with TBs to accommodate 50IOs |
| 9 | 12F Armoured OFC cable |
| 10 | LIU (12P) for OFC termination |
| 11 | Annunciator panel (6 windows for one tank) - total 24 tanks |
| 12 | Push buttons for Manual simulation and reset (Unit LS means total 36 Nos. of push buttons to be provided in this Amount) |
| 13 | Service Part of Total Work |
| 14 | Laying of LHS cable along the tank periphery (rim seal area) |
| 15 | Installation of Junction Box (Tank Roof) with complete glanding, termination of all cables from Signal JB and all foam modules |
| 16 | Installation of FLP Junction Box (Signal) - with Micro 850 PLC, MOXA Switch, LHS controllers, Timers, Relays and with all components including TBs |
| 17 | Laying of 12F Armoured OFC along cable tray |
| 18 | Splicing of OFC inside LIU (12P) (18 for each SJB and one each at MCC2 and MCC4) |
| 19 | Comissioning Part of Total Work |
| 20 | Programming of PLC (About 28DI, 20DO, 4AI in each PLC) |
| 21 | Programming of master PLC (Micro 850) and enabling modbus communication with existing F&G PLC (ABB) |
| 22 | Design of Graphics page for each tank in existing Factorytalk SCADA |
| 23 | Retrofitting of the existing Fire Alarm Panel with installation of Annunciator panel and push buttons |
| 24 | Modbus communication between Master PLC Micro 850 with annunciator panel |
| 25 | Configuring the push buttons with Master PLC using IO interface |
| 26 | Powering, Testing and Commissioning of entire system Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender