Defence Statutory Bodies & Commissions/Committees Closing in 20 days TDR #57986485

Tender For Comprehensive Consultancy Services For Preparation Of Arch & Structural Drgs, Mechanical Electrical Plumbing Services, Estimate And Rate Analysis, Topographic Survey Etc Including Obtaining Approval Of Drawings From Griha Agency And Regist

Issued by Statutory Bodies & Commissions/Committees · Srinagar, Jammu and Kashmir
Tender Value
31.33 Lakhs
Estimated cost
Bid Submission
02 Nov 2026
20 days left
EMD
62660
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Comprehensive Consultancy Services For Preparation Of Arch & Structural Drgs, Mechanical Electrical Plumbing Services, Estimate And Rate Analysis, Topographic Survey Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering Project With Griha Agency 3 Star Rating Green Bldg Norms For Defi Md Accn At Bb Cantt Under Ge 864 Ews (Tender Id: 2026_Mes_ 793454 _1)

BOQ

Name of Work:- COMPREHENSIVE CONSULTANCY SERVICES FOR PREPARATION OF ARCH & STRUCTURAL DRGS, MECHANICAL ELECTRICAL PLUMBING SERVICES, ESTIMATE AND RATE ANALYSIS, TOPOGRAPHIC SURVEY ETC INCLUDING OBTAINING APPROVAL OF DRAWINGS FROM GRIHA AGENCY AND REGISTERING PROJECT WITH GRIHA AGENCY 3 STAR RATING GREEN BLDG NORMS FOR DEFI MD ACCN AT BB CANTT UNDER GE 864 EWS (TENDER ID: 2026_MES_ 793454 _1)
Sl. No. Item Description
1Provision of complete consultancy services ( as listed below in Item No 1.00 to 1.50) as per relevent IS code practice and standard Engineering Norms and practices complete all as specified and as directed. (a) Preparation, submission and finalization of Complete conceptual plans, Architectural Drawings (Site plans, Plans of all Buildings, all side elevations, Cut Sections, Various sections through Stairs, Critical sections, detailings showing internal fixtures, cupboards, kitchen details, toilet details, elevation feature details, Schedule of Finishes, Arch TD Drawings (in appropriate scales) in REVIT/AutoCad for Following Buildings, While preparing drawings the consultant shall adhere to scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws, BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. The above mentioned drawing shall be prepared in consultation/supervision of Architects of HQ CE 31 Zone (E-6 Section ) ,(E-2(Plg Sec), user unit & GE and will have to be approved by Accepting officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:- (i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating. Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted. (iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer & as per CEFEES recommendation before finalization of the drawings . (iv) Pre vetting by CEFEES will be carried out by the consultant before finalization of drawings.
2(b) Preparation, submission and finalization of Complete structural design and drawings for following buildings based on the architectural drawings prepared and approved vide Item No 1 above, While preparing drawings the consultant shall adhere to design parameters given in Tender documents, scales of Accomodation , Scales of Furniture for built in furniture, Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , Local Bye laws and BPs and AE-II of the subject work. All these documents can be obtained from the office of HQ CE 31 Zone on any working Day. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings., All these documents can be obtained from the office of HQ CE 31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of Design section officers of HQ CE 31 Zone (E-2 Design Section ) and will have to approved by Accepting Officer before Finalization.SBC report shall be provided by E-2(Des) Sec to consultant for preparation of Str drgs.Note:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings.
3(c) Prepration, submission and finalization of, Complete Mechanical, Electrical and B/R sevices drawings ( based on the architectural drawings prepared and approved vide Item No 1 above) (Site plan, Plans of all the buildings, multiple floor plans with details showing internal electric supply, external electric supply, external water supply , lighting plan and fixing site for panels and Hot Water supply, Area drainage plan, Road, Path/Culvert, Sewage Disposal Plan Sewage pipe line is to be connected with Septic Tanks/Soakage pits , (in appropriate scales) in REVIT/AutoCad for Following Buildings. While preparing drawings the consultant ahall adhere to scales of Accomodation , Scales of Furniture for built in furniture , Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , ECBC norms, Local Bye laws and BPs and AE-II of the subject work. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 Section ) and will have to approved by Accepting Officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. Please Enable Macros to View BoQ information
4(c) Prepration, submission and finalization of, Complete Mechanical, Electrical and B/R sevices drawings ( based on the architectural drawings prepared and approved vide Item No 1 above) (Site plan, Plans of all the buildings, multiple floor plans with details showing internal electric supply, external electric supply, external water supply , lighting plan and fixing site for panels and Hot Water supply, Area drainage plan, Road, Path/Culvert, Sewage Disposal Plan Sewage pipe line is to be connected with Septic Tanks/Soakage pits , (in appropriate scales) in REVIT/AutoCad for Following Buildings. While preparing drawings the consultant ahall adhere to scales of Accomodation , Scales of Furniture for built in furniture , Zonal specifications, IS Codes, NBC Codes, GRIHA rating system (for 3 Star rating) , ECBC norms, Local Bye laws and BPs and AE-II of the subject work. In case of any discrepancy beteween these documents the decision of accepting officer will be obtained before finalizing the drawings. All these documents can be obtained from the office of HQ CE31 Zone on any working Day.The above mentioned drawing shall be prepared in consultation/supervision of E/M officers of HQ CE 31 Zone (E-4 Section ) and will have to approved by Accepting Officer before Finalization.(i) Deficient Md Accn for Officers including stair case area, servant Qtrs and Garages (G+3) Total pinth Area-3038.37 of 02 Blocks i.e 1519.185 Sqm Per Block(ii) Deficient Md Accn for JCO's including stair case area and Car/Scooter shed Total plinth Area-3152.50 Sqm (S+6)-01 x block(iii) Deficient Md Accn for OR's including stair case area and Car/Scooter shed Total plinth Area-5095.40 Sqm (S+6) of 02 Blocks i.e 2547.70 Sqm Per Block(iv) Pump House and shed for DG Set and CCS Total plinth Area-31.25+ 64.00+64.00=159.25.5qm(v) UG Sump 45000 Gallon 07 m x07 m of 4.5 m (depth) =Area 49 SqmNote:-(i) Out of above buildings ,the building for Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt shall be completely GRIHA COMPLIANT and shall include all the components, fittings and finishes to make the same completely compliant for GRIHA-3 Star Rating.Rest of the buildings are not to be Griha Compliant provided the overall Griha compliance of the Deficient Md Accn of Offrs, JCOs and ORs at BB Cantt building is not effected by the same.(ii) The Consultant before starting prepration of drawings shall submit detailed report in PPT form ,explaining methodology to be used to achieve GRIHA 3 star rating , based on all the documents mentioned in Para (a) above and considering the availaibility of local construction material and techniques used in zone including design and construction methodology to be adopted.(iii) The consultant Shall be liable to carry out any amendments/modification/revision/additions/alterations in drawings as propposed by Accepting officer before finalization of the drawings. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57986485
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 31.33 Lakhs
LAST DATE 02-11-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Comprehensive Consultancy Services For Preparation Of Arch & Structural Drgs, Mechanical Electrical Plumbing Services, Estimate And Rate Analysis, Topographic Survey Etc Including Obtaining Approval Of Drawings From Griha Agency And Registering Project With Griha Agency 3 Star Rating Green Bldg Norms For Defi Md Accn At Bb Cantt Under Ge 864 Ews (Tender Id: 2026_Mes_ 793454 _1)
Basic Detail
Tender No 800226
Bidding Type Tender
Location
City Srinagar
State Jammu and Kashmir
Key Dates
Publish Date 12 Oct 2026
Submission Date 02 Nov 2026
Open Date 04 Nov 2026
Finance
Tender Value 31.33 Lakhs
Tender Fee 500
EMD 62660
Exemption Available
Document List
60310bce-6e96-42cf-948f-b5a00859f056.html
BOQ_889830.xls
TenderConsultancyBBCANTT2ndCall.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 20 days
Nov 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 22 days

Tender Documents

Download All (ZIP) ↓
html

60310bce-6e96-42cf-948f-b5a00859f056.html

xls

BOQ_889830.xls

pdf

TenderConsultancyBBCANTT2ndCall.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders