Supply Of Supply, installation and commissioning of fully automatic transformer oil di-electric Breakdown voltage (BDV) test kit
Tender Overview
Project Description
Supply Of supply, installation and commissioning of fully automatic transformer oil di-electric breakdown voltage (bdv) test kit , supply, installation and commissioning of fully automatic transformer oil di-electric breakdow n voltage (bdv) test kit of 0-100kv capacity as per rs/ls/ed specification no. sa/rs/ls/ed/spec/bdv/rev/ 001 dt02.03.2024 is enclosed. acceptable make & model no : baur- dta 100c or megger-ots 100af or flu ke only [ warranty period: 30 months after the date of delivery ] ] , post warranty comprehensive annual maintenance charges (after 2 years free warranty period) firm to quote separately i.e.year 1 tab (for 3 rd year), year 2 tab ( for 4th year), year 3 tab (for 5th year), year 4 tab (for 6 th year), year 5 tab (for 7th year). firm shou ld quote the actual rate of the camc in the bid. discounted rate as per npv will be generated by th e ireps system for ranking purpose. amc period: 5 years, rate of discounting: 10%, start after year: 2 (w arranty period). [ warranty period: 2 years, amc period: 5 years, rate of discounting: 10 % ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply, installation and commissioning of fully automatic transformer oil di-electric Breakdow n voltage (BDV) test kit of 0-100kV capacity as per RS/LS/ED specification No. SA/RS/LS/ED/SPEC/BDV/REV/ 001 Dt02.03.2024 is enclosed. Acceptable Make & Model No : BAUR- DTA 100C or Megger-OTS 100AF or Flu ke only [ Warranty Period: 30 Months after the date of delivery ] ] |
| 2 | POST WARRANTY COMPREHENSIVE ANNUAL MAINTENANCE CHARGES (AFTER 2 YEARS FREE WARRANTY PERIOD) FIRM TO QUOTE SEPARATELY i.e.YEAR 1 TAB (FOR 3 RD YEAR), YEAR 2 TAB ( FOR 4TH YEAR), YEAR 3 TAB (FOR 5TH YEAR), YEAR 4 TAB (FOR 6 TH YEAR), YEAR 5 TAB (FOR 7TH YEAR). FIRM SHOU LD QUOTE THE ACTUAL RATE OF THE CAMC IN THE BID. Discounted rate as per NPV will be generated by th e IREPS System for Ranking purpose. AMC Period: 5 years, Rate of Discounting: 10%, Start After Year: 2 (W arranty Period). [ Warranty Period: 2 years, AMC Period: 5 years, Rate of Discounting: 10 % ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 24 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender