Tender For Widening And Strengthening Of Hardoi Pihani Chapartala Road (Mdr-43C) Km-16 To Hariyawan Block Head Quarter To Korigawan Shahpur Via Jalalpur Thamarava To Peng Road
Tender Overview
Project Description
Tender for Widening And Strengthening Of Hardoi Pihani Chapartala Road (Mdr-43C) Km-16 To Hariyawan Block Head Quarter To Korigawan Shahpur Via Jalalpur Thamarava To Peng Road
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Oct-2026 | EXTENSION OF DATE | Date | 28-Oct-2026 |
| 2 | 28-Oct-2026 | EXTENSION | Date | 13-Nov-2026 |
| 3 | 13-Nov-2026 | DATE EXTENSION | Date | 20-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections and transporting to the embankment location within all lifts and lead upto 1000 m. (including Labour Cess but excluding GST) |
| 2 | Construction of embankment with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Compaction only) (including Labour Cess but excluding GST) |
| 3 | Construction of embankment with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2 (including Labour Cess but excluding GST) |
| 4 | Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2. (including Labour Cess but excluding GST) |
| 5 | Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401. (including Labour Cess but excluding GST) |
| 6 | Providing, laying and spreading of graded stone aggregate (WMM) after mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer with paver as cemented base on sub base/subgrade (modified soil) and compacting with the road roller to achieve uniformed compressive strength as specified by Engineer-in-charge. (including Labour Cess but excluding GST) |
| 7 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (including Labour Cess but excluding GST) |
| 8 | Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical broom. (including Labour Cess but excluding GST) |
| 9 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (including Labour Cess but excluding GST) |
| 10 | Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with approve grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. (including Labour Cess but excluding GST) |
| 11 | Dismanteling brick work or stone work in lime or cement mortar and including stacking of Dismateled materials as directed by Engineer in charge within a distance of 60 mtr. As per SI no.- 692. (for 1x6 m Span Box Culvert,) (including Labour Cess but excluding GST) |
| 12 | Excavation for roadwork in soil with hydraulic excavator including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m (for 1x6 m Span Box Culvert, 1x3 m span slab culvert, 1000 mm dia HP culvert, U-Type Drain, KC Drain & Retaining Wall) (including Labour Cess but excluding GST) |
| 13 | Sand Filling in Foundation Trenches as per Drawing & Technical Specification Clause 305.3.9 (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 14 | Plain cement concrement 1:3:6 nominal mix in foundation with crushed aggregate 40 mm nominal size mechanically mixed,placed in foundation and compected by vibration including curing for 14 days. (for 1x6 m Span Box Culvert, 1x3 m span slab culvert, 1000 mm dia HP culvert, U-Type Drain, KC Drain & Retaining Wall) (including Labour Cess but excluding GST) |
| 15 | Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC M 30. Raft, Slab Wing wall etc (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 16 | Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification (RCC M-30). Approach Slab (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 17 | Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications (Wearing Coat) (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 18 | Supplying, fitting and placing un-coated mild steel reinforcement in foundation complete as per Drawing and Technical Specifications. (for 1x6 m Span Box Culvert, 1x3 m Span slab Culvert, U-Type Drain) (including Labour Cess but excluding GST) |
| 19 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications. (for 1x6 m Span Box Culvert, 1x3 m span slab culvert) (including Labour Cess but excluding GST) |
| 20 | Drainage Spouts complete as per drawing and Technical specification. (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 21 | Providing and laying filter material underneath pitching in slope complete as per drawing and Technical Specification. (for 1x6 m Span Box Culvert & 1x3 m span slab culvert) (including Labour Cess but excluding GST) |
| 22 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 23 | Construction of embankment shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300-2 (Diversion) (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 24 | Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in Single Row Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets Clause 1106. B 1000 mm dia (Diversion) (for 1x6 m Span Box Culvert, 1000 mm dia HP culvert) (including Labour Cess but excluding GST) |
| 25 | Providing & laying brick soling in prepared sub-grade with brick on end edging according to lines, graded and cross-section shown on the drawing filling jounts with sand ans earth, spreading 25 mm thick layer of earth over brick soling watering and rolling the same with three wheeled road roller 80 -100 km as per technical specification clause 412 (Diversion) (for 1x6 m Span Box Culvert) (including Labour Cess but excluding GST) |
| 26 | Brick masonry work in cement mortar 1:3 in foundation complete excluding pointing and plastering as per drawing and technical speficiations. (for 1x3 m span slab culvert, 1000 mm dia HP culvert, KC Drain & Retaining Wall) (including Labour Cess but excluding GST) |
| 27 | Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification using batching plant transit mixer and concrete pump. Grade M25. (for 1x3 m span slab culvert) (including Labour Cess but excluding GST) |
| 28 | Pointing with cement mortar (1:3) on brickwork in sub structure as per technical specification. (for 1x3 m span slab culvert, 1000 mm dia HP culvert & Retaining Wall) (including Labour Cess but excluding GST) |
| 29 | Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications. RCC Grade M20. (for U-Type Drain, KC Drain & Retaining Wall) (including Labour Cess but excluding GST) |
| 30 | Plastering with cement mortar (1:3) in substructure/superstracutre as per technical specification. (for KC Drain) (including Labour Cess but excluding GST) |
| 31 | Maintenance of constructed road for next five years after the actual date of completion of Construction of work. The contractor shall be paid maintenance cost for 1st year & 2nd year after the actual date of completion of Construction (Including labour cess but excluding GST) |
| 32 | Maintenance of constructed road for next five years after the actual date of of completion of Construction of work The contractor shall be paid maintenance cost for 3rd year after the actual date of Construction (Including labour cess but excluding GST) |
| 33 | Maintenance of constructed road for next five years after the actual date of of completion of Construction of work The contractor shall be paid maintenance cost for 4th year after the actual date of Construction (Including labour cess but excluding GST) |
| 34 | Maintenance of constructed road for next five years after the actual date of of completion of Construction of work The contractor shall be paid maintenance cost for 5th year after the actual date of Construction (Including labour cess but excluding GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender