Housing Urban and Rular Development Government Departments Closing in 12 days TDR #57981789

Tender For Upgradation/Renovation Of Internal Electrical Installations In Residential Flats Of Annapurna And Dhawalgiri (Type V-E) Buildings, Anushaktinagar, Mumbai - 400094

Issued by Government Departments · Mumbai Suburban, Maharashtra
Tender Value
1.87 Crore
Estimated cost
Bid Submission
30 Oct 2026
12 days left
EMD
3.74 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai Suburban → Maharashtra
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Upgradation/Renovation Of Internal Electrical Installations In Residential Flats Of Annapurna And Dhawalgiri (Type V-E) Buildings, Anushaktinagar, Mumbai - 400094

BOQ

Name of Work:- Upgradation/Renovation of internal electrical installations in residential flats of Annapurna and Dhawalgiri (Type V-E) buildings, Anushaktinagar, Mumbai – 400094
Sl. No. Item Description
1Name of Work : Upgradation/Renovation of internal electrical installations in residential flats of Annapurna and Dhawalgiri (Type V-E) buildings, Anushaktinagar, Mumbai – 400094 NIT No.: DCSEM/CQD/QSC/UPGRD-ELECT/ANNAP-DHAWA/26-27/NIT-02, Dtd.12.10.2026 IMPORTANT GENERAL NOTES Sr. No. Details / Description of Notes
2The site is situated at Annapurna and Dhawalgiri (Type V-E) buildings, Anushaktinagar, Mumbai - 400094, comprising 120 residential flats.
3The tenderers are advised to visit the site of work & its surroundings, with prior permission of Engineer-in-charge/authorised representative, to acquaint themselves about the location of work, accessibility to the site, level of sub-soil water, drainage facility for dewatering and any other matter relating to availability and carriage of construction materials, nature of work etc., and satisfy themself and then quote the rates accordingly. A Tenderer shall be deemed to have full knowledge of the site whether he inspects it or not and NO extra charges consequent on any misunderstanding or otherwise shall be allowed.
4Tenderers shall visit the site of work, at their own cost. The request email for site visit shall be sent well in advance (preferably three working days before) for preparation of visitor pass, fixing suitable & mutually agreed date & time for site visit. The email ID for site visit is mentioned in tender documents.
5Contractor is fully responsible for making payment of Minimum wages & Bonus to labourers, EPF & ESI to statutory Authorities timely and submission of challans and documentary proof to EIC for release of payment of Running Account / Final Bill. Otherwise, bill will not be forwarded by EIC to Accounts for payment. EIC should ensure that all necessary documents are submitted by Agency for release of payment. No Running Account / Final Bill shall be paid for the work till the applicable labour license, registration and challans with EPFO, ESIC and BOCW (Building and Other Construction Workers) Welfare Board, whatever applicable, are submitted by the Contractor to the Engineer-in-Charge.)
6Contractor shall take a Contractor’s All Risk (CAR) Insurance Policy in respect of entire scope of work and a Janata insurance policy to cover the compensation claims arising out of Workmen's Compensation Act-1923. The Insurance policy shall be taken for entire period of contract and copy of the same shall be submitted to the Engineer-in-Charge before commencement of the work. The insurance policy shall be taken before commencement of the work and shall be renewed during the construction period till actual completion of work. The charges for issue & renewal of insurance policy shall be borne by Contractor. In event of failure of the Contractor to obtain Insurance Policy, Running Account Payments of the Contractor shall not be released till such time the same is obtained by the Contractor & submitted to the Engineer-in-Charge. In case, Insurance Policy has validity period not matching with contract period (either due to policy start date later than actual date of start of work or policy end date earlier than actual date of completion), then penalty for gap in period shall be levied at one and half times the rate of Insurance Policy premium including GST, to be computed on per day basis. All the workers engaged on the work shall required to be insured as per Government norms at the cost of contractor.
7The Contractor shall submit with every Running Account / Final Bill, a certificate of employment/deployment of the Technical representative(s) as per Clause 36 (i) in Schedule 'F' of \\" Salient Governing Features of the Tender\\", after certifying by Engineer-in-Charge. In the event of not fulfilling the above provisions of Clause 36(i), recovery shall be made from the contractor as per Schedule 'F'.
8Arrangement of Electricity : as per Schedule -BElectricity for construction/execution of work will be supplied by department @ free of cost.
9Arrangement of Water :Water for work will be supplied by department @ free of cost.
10Obtaining permission as per Ground Water Regulation for dewatering, from Central Ground Water Authority (CGWA) / respective statutory authority: The Contractor shall obtain necessary permission from relevant statutory authority related to Ground Water Regulation for dewatering, maintaining & submitting respective data. The applicable necessary statutory charges, penalties (due to environmental compensation arising from unauthorized pumping, non-compliance etc.) shall be borne by Contractor, without any extra cost to department.
11The drawings issued for Tender purpose are preliminary and indicative only. The Working drawings as applicable shall be issued in phased manner at the time of execution. Nothing extra shall be entertained towards revision in drawings. Drawing shall not be taken outside campus/site/premises without Gate Pass issued by EIC.
12All the items of sub-structure include the cost of dewatering and shoring, wherever necessary, during the progress of work, till its completion without any extra cost to the Department.
13Regarding Classification of Earthwork, Rock with average Uniaxial Compressive Strength (UCS) > 10 N/mm2 Or Rock Quality Designation (RQD) > 25% Or Core Recovery Ratio (CRR) > 0.5, shall be considered as Hard Rock. Minimum One sample for every 50 cum or part thereof for hard rock quantity shall be tested (One sample consist of minimum 3 specimens). Further, the contractor shall carry out above test at his own cost and as directed by Engineer-in-Charge.
14The Schedule of Quantities include contingent works for other services (PHE, Electrical, Mechanical etc.) which shall be paid under relevant Civil items. Accordingly, the Contractor shall carry out all related works such as making cut outs, nitches, pipe sleeves, foundation pockets for embedded plate, bolts, parts etc. in concrete/ brick works as and when required by Engineer-in-charge without any extra cost to the Department.
15PPC/ Blended cement of recommended brand shall only be used for all masonry and finishing works unless noted otherwise. Only Fully treated dry, well graded sand conforming to IS 383 shall be used.
16Only Ready Mix Mortar of approved make shall be used. The ready mix mortar shall be manufactured by preferred manufacturers, using cement-sand in required proportion.
17The size and thickness of natural stones/ tiles mentioned for flooring dado, skirting etc. are approximate and subject to the availability in market during execution. If the required size and thickness is not available, the next higher size and thickness of tiles/ stones shall be used without any extra cost to the Department. The contractor may quote the rates accordingly.
18Quoted rate shall hold good for plain/ curved/ any other geometric shapes & sizes of all structural/ RCC members including formworks, masonry, flooring, doors & windows, plastering, painting etc. at all leads, levels, lifts and floors including scaffolding, bracing, multilevel staging etc., unless noted otherwise. Nothing extra shall be entertained towards wastages of materials, additional labours/ tools & plants etc. to achieve the required shapes & sizes etc.
19The Contractor shall follow the DAE safety rules strictly. All safety & security regulations shall be followed strictly as per specifications & conditions of contract.
20The following Security regulations shall be followed strictly while movement of labourers/ workers/ contractor's personnel including transportation of the materials etc. i) The Workers, Engineers and Supervisors will be provided vigil passes (for entry into Premises) on submission of application forms in prescribed formats supported by documentary proof like Aadhar card, Voter ID card and Ration Card / Driving Licence / PAN card etc. Police Verification Certificate (PVC) is mandatory for Engineers and Supervisors (wherever desired by department). You are requested to obtain immediately Police Verification Certificate (PVC) of your regular staff deployed at site(s) in respect of works and submit the same along with necessary application to allow them to enter in premises to carry out the assigned work. ii) The Contractor shall obtain special permission for working on extended hours of working days including Saturday, Sunday and holidays etc. iii) Workers shall be escorted from the main gate of campus/premises upto the site by designated supervisors of the contractor and they are not allowed to roam around inside the premises. iv) Transport vehicles of the contractor are allowed to enter the premises for transportation of construction materials. Drivers must have valid driving license of Heavy Vehicle. v) The following Security regulations shall also be followed strictly while movement of labourers/ workers/ contractor's personnel etc. (a) The Contractor shall issue I-Cards to his workers deployed on regular basis. (b) The Supervisor of the contractor having photo pass can bring daily wage workers/ casual workers inside campus for work. He should prepare list of such workers in duplicate. The original copy shall be handed over to the representative of the Engineer-In-Charge at the gate and endorsement obtained on duplicate copy on daily basis. (c) The Contractor's personnel including daily wage workers shall be in uniform with proper identification for ease in identification of such persons at unauthorised places. (d) The daily wage workers/ casual workers employed by the contractor must wear florescence vis-a-vis wear without fail during their presence inside Campus/premises. The contractor shall provide a sleeveless Jacket to the workers in pattern, colour showing name of contractor with address and telephone number as approved by the Engineer-in-charge. All the workers must wear the same while on duty. (e) The Contractor's personnel shall follow all safety rules & security procedure that are in vogue and applicable during execution of work. Contractor shall verify the character and antecedents of the labourers employed, through local address proof issued by competent authorities such as Aadhar card, Voter ID card and ration card / driving license /electricity bills /telephone bill /gas connection document etc. The nationality of contract labourers also needs due verification.
21Vehicular movement shall abide by the regulations imposed by the concerned authorities. The contractor shall abide by the security rules & regulations of the Department. The approach roads should be kept clean & free from obstruction for smooth functioning of existing traffic and damages caused, if any, to be made good without any extra cost to the department. Contractor may make provision for entry of vehicles by providing alternate road/ route for entry & exit during the construction work, if required, at his own cost without extra cost to the department.
22While transporting materials from site and disposal of surplus materials, the spilled over materials/ earth/ debris etc. on the road should be got cleaned by the contractor after the day's work is over.
23Royalty for excavation, transportation, filling of earthwork etc. including obtaining permission from Statutory authority, if any, shall be borne by the contractor.
24Regarding disposal of Construction waste from site of work, the agency has to abide by the guidelines of Construction and Demolition (C&D) waste management plan as approved by BMC/Local Municipal Authority and any other regulations issued by Statutory authorities in the matter from time to time and Department is not responsible in any way in this regard. i) Contractor shall strictly follow the Statutory rules and regulations of the Construction and Demolition Debris Management Plan for project site. ii) Surplus Excavated materials and construction debris shall be disposed from construction site at approved disposal ground of BMC/Local Municipal Authority including cost of necessary Statutory charges, as applicable. iii) Contractor shall submit acknowledgement of challan for each trip for unloading of Construction and Demolition waste material as per the standard format. iv) Contractor shall be responsible and liable for penalty, if any, as prescribed by the Local Authority in case of non-fulfilment of the procedure laid down in the Construction and Demolition Debris Management Plan. v) Contractor shall submit irrevocable Bank Guarantee for the amount as insisted by BMC/Local Municipal Authority for the purpose of ensuing compliance of the Waste Management Plan/Debris Management Plan approved by the Local Municipal Corporation from time to time, till the grant /issuance of the Occupation Certificate and charges for same will be borne by Contractor. NOC from C&D Waste Management Department of BMC/Local Municipal Authority shall be submitted by the agency.
25Agency should pay necessary charges to BMC/Local Municipal Authority to get done periodical pest control / anti-larva treatment / Insecticide treatment at Construction site. After the completion of work, necessary NOC shall be obtained from BMC /Local Municipal Authority and shall be submitted to Department. The charges for same will be borne by Contractor.
26The Agency shall take care of existing services and other department properties while carrying out job. All dismantling, demolishing and excavation work shall be done with most careful manner and with prior written approval of the Engineer-in-charge, without damaging the existing structures, services, finishes, etc. Agency shall take all precautions to cover all furniture, fixtures, glass and window panes to prevent damage. Damage, if any shall be repaired/replaced by agency at his own cost.
27Protection of work: The Contractor shall be responsible for the protection of the work during progress. He shall also provide and maintain any other temporary substitute and material for this purpose. He shall take all the necessary precautions to prevent damage to all the works till its handing over.
28Wherever old material/works are replaced with new one, quoted rate includes removing/dismantling the existing one and depositing the serviceable material at departmental store and disposing off debris outside the campus/ premises/ colony.
29Since the work has to be carried out inside/ near occupied residential/office building, the work shall be executed with least disturbance to occupants of buildings.
30Approved Samples of Materials: The Contractor shall submit samples of all materials to be incorporated in the work, without any extra cost to Department, at least 30 days before he places bulk order for the materials and shall obtain approval of samples in writing from the Engineer-In-charge.
31Shop drawings for Aluminium work, Structural steel, Stainless steel, Structural glazing, ACP cladding, etc. shall be submitted by Contractor for the approval of Engineer-in-Charge, at least 30 days in advance prior to taking of work.
32No labour shall be permitted to stay inside campus/premises/site.OrLabour may be permitted to stay inside campus / at site on written request by the contractor. The labour camp inside the campus is permitted subject to the following conditions:i) The contractor shall submit detailed layout plan of labour camp showing number of hutments including provision of water, electricity and drainage details etc. for prior approval of the Engineer-in-Charge.ii) The contractor shall follow relevant labour welfare measures and other labour laws in force from time to time.iii) The labour staying inside shall be issued Identity cards by the contractor.iv) All cost shall be borne by the contractor.
33Suitable area near site of work shall be allocated to the contractor for storing construction materials, for site office etc. Optimum care shall be taken by the contractor to avoid disturbing the traffic and road around the building etc. The contractor shall have to maintain proper co-ordination with the fellow agencies working simultaneously in the vicinity of subject work in order to avoid delays in any of the works going on in and around the premises.
34RMC plant at site within campus:On request of agency, the installation of Batching Plant at site may be permitted subject to the following terms and conditions:-i) The contractor shall submit the details of batching plant indicating its capacity, installation details including site layout for approval of the Engineer-In-charge.ii) The contractor shall manufacture the concrete in lines with latest BIS provision and duly approved by Engineer-In-charge.iii) Extra for RMC over conventional concrete (RCC & PCC) wherever mentioned in BOQ shall not be operated in case the contractor uses concrete from the batching plant installed inside the campus. However, extra over conventional concrete (RCC & PCC) shall be considered for measurement under relevant items in case RMC brought from approved list of manufacturer from outside the campus.iv) Concrete from the batching plant shall not be allowed for use of works outside the campus taken up by the contractor, if any.v) The contractor shall clean the batching plant site, remove the plant and its accessories including the debris etc. and bring to its original condition after completion of the work.
35Piling Work Agency: The financial and technical suitability of the proposed piling work agency will be assessed / verified by the department through inspection of the similar works carried out by proposed agency and verification of their credentials by technical evaluation committee of experts to be constituted by the department for this purpose. If the proposed agency is found suitable, necessary approval from the department shall be communicated for execution of piling work. No other agency shall be accepted after Pre Bid clarification.
36Guidelines for Air Pollution mitigation(i) The charges for the Air Pollution mitigation measures shall be borne by the contractor without any extra cost to the department.(ii) Contractor shall follow the directions for Dust and Pollution Control measures in construction as notified by MoEF&CC / MoHUA / CPWD / BMC or any other statutory authority.(iii) All precautionary measures for control of Air Pollution due to Building Construction Activity shall be taken as per Local Statutory/ Municipal Authority Air Pollution Mitigation Plan. (iv) Mandatory Form for Building Construction activity to control Air Pollution along with supporting documents and site photographs shall be submitted to concerened authority or uploaded on online portal.(v) Projects attracting Environmental Clearance shall carry out Third Party Ambient Air Monitoring every fortnightly from NABL / MoEF&CC laboratory. (vi) Construction projects shall mandatorily install sensor-based air quality monitor for measuring PM concentration (PM2.5 and PM10), relative humidity, temperature and display real time AQI data through LED display board (width 1220mm x height 915mm, screen resolution 320 x 192 pixel) at the construction site. Further, installation must be completed within 15 days of issue of Work order or commencement of work. The Contractor shall submit a certificate for completion of installation of air quality monitor and LED display board, after certifying by Engineer-In-charge, along with 1st RA bill for releasing the payment.(vii) The air quality data must be accessible at the site and made available for inspection by Local Municipal Authority/ Competent Authority.(viii) Construction layouts having area more than 01 (one) acre or Height more than 70m, shall have continuous dust or wind breaking tin / metal sheet erected of minimum height 35 feet around periphery of the construction project site and for construction site, less than 01 (one) acre, the tin / metal sheet height shall be 25 feet minimum.(ix) Tarpaulin / Green cloth / Jute sheet to be mandatorily used to cover the floor where any construction activity is in progress and two floors below it and also on scaffolding covering an entire area under demolition structure. Further, regular cleaning of Tarpaulin / Jute sheet to be undertaken. (x) Water sprinkling shall be continuously carried out so that the debris shall remain in wet condition.(xi) Contractor shall install CCTV cameras along the periphery of their construction work site to ensure that vehicles are plying after cleaning tyres and are not overloaded. Vehicle tyre washing facility shall be provided at all exit points of construction sites.(xii) All vehicles carrying construction materials/waste/debris shall have valid PUC certificates and the same shall be produced as when asked for by competent authorities.(xiii) Construction workers should mandatorily use PPE (Personal Protective Equipment) i.e. Mask, Goggles etc.
37The quoted rate shall be inclusive of providing and erecting temporary barricading of height as per above 'Guidelines for Air Pollution mitigation' (but minimum 10 feet height) using structural steel (MS Pipes or angle iron frame work etc.), covered with tin / GI sheets of approved colour & shade, Struts, MS Clamps, Bracing etc. and shall have wicket gate & material gate and including writing and painting of direction & instructions, providing glow lamps, reflective signs, marking, flags, caution tape etc. Prior written approval of Engineer-in-Charge of the sketch/ drawing showing details of barricading shall be obtained by the contractor. The barricading shall be provided and retained in position at site continuously during the execution of the entire work till its completion. Rate include its maintenance for damages, painting, all incidentals, labour, materials, equipments and works required to execute the job such as earth work, concrete, welding etc. After completion of work, Contractor shall remove and take away the barricading at his own cost with the prior approval of Engineer-In-Charge. The entire work shall be executed as per direction of Engineer-In-Charge. No work shall be allowed unless the barricading is completed to the satisfaction of the Engineer-in-Charge. The Contractor shall submit a certificate for completion of barricading along with 1st RA bill after certifying by Engineer-in-Charge for releasing the payment.
38The contractor shall display proper information/cautionary signage boards at site for the safety of the workers and public in general in the surrounding areas.
39Contractor has to provide sign board at site with detailed name of project, name of client, name with contact number of contractor and minimum wages category wise at entrance of project/site without any extra cost to the department.
40Guidelines for Scaffolding works - Quoted rates shall include all scaffolding works without any extra cost to the department.(i) Design of scaffolding for carrying out work shall be as per relevant IS Codes & specification. The contractor has to observe all safety procedure while working on heights as per IS: 3696 (Part-I) (Safety Code for Scaffolds). (ii) All working platform must be of minimum 600 mm wide, made of M.S pipe and must have guard rails as per specification. Further, Overhead protection should be provided on the scaffolds to protect workers on lower platform against falling objects from higher level.(iii) Necessary ladder shall be provided at required locations to enable Departmental Staff for supervision of works.(iv) Labours working on the scaffolding should be with safety belts, helmets, goggles and other safety gears.(v) Horizontal Safety Net : Nylon net with a mesh size of 25mm shall be provided at 4.0 meter height from the ground level around the buildings upto a distance of minimum 3.0 meter from the edge of the building on all sides to catch any falling objects.(vi) Vertical Safety Net: Green cloth net shall be provided to the full height of scaffolding / building and securely tied to protect falling material coming out during the progress of work.
41Maintaining L1 position During execution of the contract, if tender structure changes due to variation in quantities (i.e Work order quantities, Substituted items quantities including quantities within deviation limit specified in Clause 12 of Schedule ‘F’ in “Salient Governing Features of the Tender”), Contractor has to give suitable discount to remain in L1 position.
42The quoted rates shall be inclusive of wastage of labour & material, installation, testing, commissioning, transportation, loading, unloading, lifting etc. and also includes provision of all necessary manpower, tools, machinery, equipment, hoists etc. for carrying out the work in effective manner as per specifications and as directed by Engineer-In-Charge.
43The quoted rates shall be inclusive of all Taxes, GST, Cess, Levy, duty etc.
44Refer Prebid clarifications, minutes of meeting & corrigendum for revisions, if any, for updates.
45Replacement of existing switches, sockets, and fan regulators with supply, installation, testing, and commissioning of modular switches, sockets, plates, boxes, and accessories complete as required, including ABS/Polycarbonate surface boxes, metal powder coated cover plates with cover frames, fire- retardant ABS/Polycarbonate switches and sockets of white color, no exposed metal ring on switch/socket surfaces, and proper locking arrangements to ensure that switches/modules do not loosen or come out after installation when pulled manually or during operation; the work shall include all connections, accessories, fixing hardware, etc., complete in all respects and also including the supply and installation of 1.5 sq.mm, 2.5 sq.mm, and 4 sq.mm, 1100 V grade, flexible, PVC insulated, FRLS wires in the switchboard as required and as instructed by the Engineer-in-Charge (E.I.C).Note:i)All switchboards to be manufactured by OEM and samples approved by the department.iii)The socket outlet shall be positioned so that the insertion of accessories does not hinder the operation of the associated controlling switch.iii) Switchboard numbering and installation locations shall strictly comply with the approved reference drawing.iv) The switches and sockets shall be with a 10 years availability guarantee/continuity of supply by the OEM.v) All switches and sockets shall be readymade and readily available. vi)Complete all wiring, terminations, dressing, testing, and commissioning to ensure safe and proper operation.
46SB-2 (Hall)/SB-8 (Master Bedroom)/SB-12 (Bedroom No.-1)/SB-14 (Bedroom No.-2) Switchboards (Surface) witha)White modular plate with frame- 1no.b)Plastic Surface Box - 1no.c)6A,SP, 240V controlling point switch- 1no.d)6A, 240V 3-pin socket outlet with shutter-1 no.e)16A,SP, 240V controlling point switch- 1no.f)16A, 240V Socket with shutter-1no.g) Blank Plate- 1 no.Note: - Points P1, P8, P10, and P12 (6A) shall be tapped from the nearest 16A power points, namely PP1, PP3, PP4, and PP5 respectively, as per the attached reference drawing.
47SB-4 (Hall) Switchboards (4×2) (Surface) witha)White modular plate with frame-1no.b)Plastic Surface Box - 1no.c)6A, SP, 240V controlling point switches-5nos.d)6A, 240V 3-pin socket outlet with shutter-01no. e) Blank plate-01 no.
48SB-7 (Master Bedroom)/SB-11 (Bedroom No.-1)/ SB-13 (Bedroom No.-02)/SB-20 (Kitchen) Switchboards (Surface) with:a)White modular plate with frame- 1no.b)Plastic surface box-1 no.c)6A,SP, 240V controlling point switch- 4no.d)6A, 240V 3-pin socket outlet with shutter-1 no.
49SB-18 (Utility Area) Switchboards (Surface) witha)White modular plate with frame- 1no.b)Plastic surface box-1 no.c)16A,SP, 240V controlling point switch- 1no.d)16A, 240V Socket with shutter-1noe) 6A, SP, 240V controlling point switch-2 no.
50SB-5 (Hall) Switchboard (Surface) witha)White modular plate with frame- 1no.b)Plastic surface box-1 no.c)16A,SP, 240V controlling point switch- 1no.d)16A, 240V Socket with shutter-1noe)6A,SP, 240V controlling point switch- 2nof)6A, 240V 3-pin socket outlet with shutter-1no.Note:-P20 (6A) shall be tapped from the nearest power point (PP-2).
51SB-3 (Hall) Switchboard (Surface) witha)White modular plate with frame- 1no.b)Plastic surface box- 1 no.c)6A,SP, 240V controlling point switch- 1no.d)6A, 240V 3-pin socket outlet with shutter-1no.
52SB-17 (Utility Area) Switchboard (Surface) witha)White modular plate with frame-1no. B)Plastic surface box-1 noc)6A, SP, 240V controlling point switches-02 nos.
53SB-1 (Hall)/ SB-10 (Master Bedroom) Switchboard (Surface) witha)1 module white modular plate with frame- 1no.b) 1 module Plastic Surface box-1 no.c)6A, SP, 240V controlling point switch-1no.
54Bell Switchboard - Near the main doora) White modular plate with frame- 1 no.b) Plastic surface box-1 noc) 6A-Bell push - 1 way
55SB-24 (Kitchen) Switchboard (Surface) witha)White modular plate with frame- 1no.b)Plastic surface box- 1 noc)6A,SP, 240V controlling point switch- 2no.d)6A, 240V 3-pin socket outlet with shutter-1no.
56AC-03 (Master Bedroom) : 20A, metal clad plug & socket ,20A SP MCB( C-curve, 10KA), with neutral link inclduing all accessories:Scope of work also includes shifting of existing AC point wiring to the new location in existing casing capping including dressing with PVC bunching tages at an intervales of 600mm.
57Point wiring: Providing point wiring for Light Point / 6A socket outlet point/ 16A socket outlet point /A.C. Point etc. with 1.1 KV grade, FRLS PVC insulated multi stranded flexible copper conductor wires with ferrule numbers on both the side, labeling, in 25mm x 16mm size white/ivory PVC casing capping on surface( will be separately measured under item no.8), modular type controlling switches/ socket outlets with readymade ABS/Polycarbonate surface boxes(OEM factory made),polycarbonate cover plate with metal powder coated/ cromium plated supporting frames, fire-retardant Polycarbonate switches and sockets of complete white color, 3-plate ceiling roses or Angle/batten holder, PVC junction boxes , PVC round plates, terminal looping connector blocks, ferrule numbers on both sides of wires, labelling etc. all as per site conditions, specifications and as instructed by Engineer-in-charge.Scope shall also include providing the bunching tags for wires inside casing capping to avoid hanging of wires at the intervals of 600mm.Note:1. Wiring layout arrangement is to be got approved prior to procurement.2. The points are to be tapped from the flat DB (AC point & 16A socket outlet points). Lighting point and 6 A socket outlet points shall be looped to existing lighting circuit in the rooms as required.3. Modular switches,sockets, switchboards, AC boxes are also in the scope of this item.4. Switchboard and point abbreviations shall be interpreted in accordance with the attached reference drawing5.Complete all wiring, terminations, dressing, testing, and commissioning to ensure safe and proper operation. All metal boxes shall be properly earthed by connecting them to the nearest available earth point, ensuring continuity and completeness of the earthing system.6.The work shall be executed strictly as per the attached reference drawing.
5816A socket oulet point with 2.5 sq mm wires,6/16A socket outlet , 16A,SP,240V controlling switch,6A switch & 6A 3-pin socketNote:i) 6A socket shall be looped to the 16A point with suitable copper wire and lugsii)Locations: Kitchen area(PP8,PP9,PP10) and passgage area between Kitchen & hall (PP7)
59Plug Point : 6A socket outlet point with 1.5 sq.mm wires complete with 6A , 3-pin socket outlet & 6A, SP, 240V controlling switch etc.Note:-i) P4, P5, P13 & P14 points shall be a separate new lighting circuit from DB
606A socket outlet point with switch 1.5 sq mm wires (for phase, neutral & earth) Master Bedroom:- SB:-09Note:- The point shall be tapped from lighting circuit in MBR
61AC point with 4 sq mm copper wires with 20A, metal clad plug & socket,20A SP MCB( C-curve, 10KA), with neutral linkNote:- Locations:Hall: AC1 and AC2,Bedroom-1: AC4,Bedroom-2:AC5
62Providing wiring for light point with 1.5 sq.mm wires with angle/batten holder, square box, etc.Note: i. Controlling switches for L11, 19 points are cosidered in respective swicth boards SB-13,SB-24 respectively in item no.1
63Light Point (L12) Providing wiring for light point with 1.5 sq.mm wires complete with 6A, SP, 240V controlling switch, angle/batten holder, square box, etc. shall be loopd to new lighitng circuit mentioned in item no.2.2
64Repalcement of existing 20A DP Isolator in bathroom (Master bedroom & common ) with ready made DP metal enclosure with 32A, DP Isolator(MCB type) including all accessories and as instructed by EIC.Note: Complete all wiring, terminations, dressing, testing, and commissioning to ensure safe and proper operation. All metal boxes shall be properly earthed by connecting them to the nearest available earth point, ensuring continuity and completeness of the earthing system.
65Supply, installation, testing & commissioning of readymade 8 way ETPN MCB DB type similar to model no.5076 72 of M/s. Legrand make, dust protected, duly powder painted, inclusive of copper bus bar, common neutral link, earth bar, din bar of mounting MCBs consisting of following all as required & instructed by the Engineer-in-charge.i) 40A RCBO, 4P, 6kA, 30mA sensitivity - 1 no.ii) 10A, 10kA breaking capacity, SP MCB- 05 nosiii) 16A, 10kA breaking capacity, SP MCB-12 nosiv) 20A, 10kA breaking capacity, SP MCB-7 nos.v)Wire way box of same make. Din channel, tinned copper bus bar, earthing and neutral links etc.---1 setScope of work include :Providing Danger board, MCB blanks, Schematic Diagram, Ferule numbers, etc.
66Brush Less Direct Current (BLDC) fan with remote Supply, Installation, Testing and Commissioning of 1200mm ceiling fan with linear speed regulation along with remote, all as per tender specifications as mentioned in the technical bid. The fan should be confirming to IS374/1979. The BLDC fans with 16SWG safety chains should be interconnected to ceiling rose with 3C×1.0 sq.mm flexible copper cable as instructed by the Engineer-In-Charge.Note:1.(Including ceiling rose: ceiling rose shall be 3 plate ceiing rose on pvc square box, shall be made of polycarbonate body and have brass terminals mounted on PVC Square box with and ISI marked) and earthing etc. as required and as instructed by the Engineer-in-Charge.2. A minimum three (3) years comprehensive onsite warranty shall be provided by the OEM, covering peeling or fading of paint on blades and body, any manufacturing defects, and all electrical and mechanical faults including motor, driver, and controller; all defective components shall be replaced free of cost during the warranty period. Additionally, the contractor shall provide a minimum of 10% extra remote controls along with batteries, over and above the installed quantity, which shall be handed over to the department for maintenance purposes.
67Water Heater :- Supply, installation, testing & commissioning of 1 ltr. Mini instantaneous pressure type water heater complying to IS 8978, vertical round type operating on 240V AC ,50Hz supply with 3kW heating element complete with all accessories. ISI marked, stainless steel inner container including SS base and SS pipes on which heating element & accessories are connected and ABS plastic outer body, glass wool insulation between inner & outer container, pressure release valve, thermostat, thermal cutout, fusible plug, reset button for thermal cutout (shall be accesible from outside the container), connecting to water heater point with 3C X 2.5 sq.mm flexible copper conductor chord, all as per requirement & as instructed by Engineer-In-Charge.Note: -i)DP MCB controlling a geyser should not be located within 1 m from the location of a showerii) Interconnection of water heater with existing water heater pipe line is in the scope of work.iii) Fixing of water heater with coach screws as instructed by Engineer-in charge.iv) 3-core × 2.5 sq. mm TRS cable from geyser to DP MCB controlling switch. The cable shall be laid in a single continuous length without any intermediate joints or connectors
68Replacement including supply,installation,testing and commissioning of batten/angle/pendent holders with PVC square box and taking away old holders & PVC square box as per instructions of EIC.Note: The holder in the common bathroom shall be shifted to the wall on which the door opens.
69PVC (Fire Resistant) casing caping:- Supply & installtion of 25mm X16mm PVC casing & capping (double locking) similar M/s Precision make of apporved colour inlcuding careful removal of existing casing capping without damaging the existing wires, temporary supporting and bunching of wires and re-laying the existing wires inside the new casing capping complete with necessary accessories as per instructions of EICNote:-1.The casing shall be fixed using GI screws on wall fixed at an interval of 300mm along horizontal run and along vertical run.2. Providing and fixing nylon cable ties (or tie wraps) to secure wires inside casing/capping at intervals not exceeding 600 mm to prevent sagging or hanging of wires.
70Fabrication, Supply and instllation of Ceiling fan hook fabricated out of 100mm x 100mm x 8mm (Approx.) MS sheet with 12mm MS rod hook welded on MS sheet, holes on corners & painting with two coat of enamel paint over one coat of red oxide and with four nos. of anchor fasteners 10mm dia ( Approx.), all as required & instruction of Engineer-in-charge (Sample to be got approved)
71Dismantling, Taking Away, and Making Good the Wall with mortar, brickwork and plaster:Scope of Work:1. Dismantling of exisitng Semi-concealed boxes, Switches and sockets, Casing caping, Old concealed Flat DB and other existing electrical materials in the flat without casue damage to surrounding walls.2. Taking Away /Credit: All dismantled materials (except fans, geysers) shall be taken away from the site by the contractor.3. Making Good Wall Openings: All openings caused by the removal of semi-concealed boxes shall be made good with:3.1) Brick work in cement mortar (1:4) to match wall thickness.3.2)Cement plaster finish to match the adjoining wall surface in line, level, and finish.4.During dismantling, due care shall be taken to avoid any damage to the existing wires. The wires shall be properly bunched and secured at suitable intervals to prevent sagging or hanging5. Dismantling work pertaining to Item Nos. 1, 2, 3, 4, 7, 8, and 9 shall be deemed to be included in the scope of this item6. Removal and shifting of materials pertaining to Item Nos. 5, 6 and RCBO to the DCSEM store or TVS store without any damage shall be included in the scope of this item
72Wall Surface Preparation and Finishing with Wall Care Putty, Primer, and OBD Paint:Scope of Work:1. Providing and applying one coat of white cement based wall care putty of approved make over entire surface including preparing old painted surfaces by thoroughly scrapping oil bound distemper /acrylic emulsion / white wash etc, filling up the cracks, crevices, depression, holes, including sand papering and making surfaces even and smooth dusting /cleaning, applying one coat of approved cement primer complete as per specifications and as directed by the Engineer-in-Charge.2.Repainting of old painted surfaces with two coats of synthetic oil bound distemper (on already prepared surface/ old similar painted surface) of Tractor brand of M/s. Asian/ Bison Acrylic Distemper of M/s. Berger/ Beauty O B D of M/s. Nerolac/ Maxilite Acrylic Distemper of M/s. ICI or other approved quivalent make of approved shade/ colour, including filling minor cracks, depression & minor touch up etc with approved putty and applying one coat of approved cement primer over rectified area only and as directed by the Engineer-in-Charge. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57981789
AUTHORITY Government Departments
TENDER VALUE 1.87 Crore
LAST DATE 30-10-2026
Authority
Authority Name Directorate Of Construction, Services And Estate Management
Work Description Tender for Upgradation/Renovation Of Internal Electrical Installations In Residential Flats Of Annapurna And Dhawalgiri (Type V-E) Buildings, Anushaktinagar, Mumbai - 400094
Basic Detail
Tender No DCSEM / CQD / QSC / UPGRD-ELECT / ANNAP-DHAWA/26-27/NIT-02, Dtd.12.10.2026
Bidding Type Tender
Location
City Mumbai Suburban
State Maharashtra
Key Dates
Publish Date 12 Oct 2026
Submission Date 30 Oct 2026
Open Date 03 Nov 2026
Finance
Tender Value 1.87 Crore
Tender Fee Ref. Documents
EMD 3.74 Lakhs
Exemption Available
Document List
854c4059-3cdc-452a-a30b-13e6c19be0c3.html
BOQ_977016.xls
TechnicalBid.pdf
Technicaldatasheet.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 30, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Nov 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
html

854c4059-3cdc-452a-a30b-13e6c19be0c3.html

xls

BOQ_977016.xls

pdf

TechnicalBid.pdf

xls

Technicaldatasheet.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender