Tender For Routine Maintenance Of Residential & Non-Residential Buildings Of Alhw At Mus, Car Nicobar For A Period Of One Year.
Tender Overview
Project Description
Tender for Routine Maintenance Of Residential & Non-Residential Buildings Of Alhw At Mus, Car Nicobar For A Period Of One Year.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Oct-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 26-Oct-2026 |
| 2 | 26-Oct-2026 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 28-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Providing and laying of GI Pipes of various sizes with ISI mark, including cost of pipe, cost of all labour charges, hire charges of truck including POL and operator, minor tools, including cost of charges, minor tools, transportation materials. GST, LWC etc. complete anticipated Qty. |
| 2 | GI Pipes 15mm dia |
| 3 | GI Pipes 25mm dia |
| 4 | GI Pipes 50mm dia |
| 5 | Providing and fixing of following GI fittings of various size of ISI mark including cost of all materials, cost of all labour charges, transportation charges of all materials to work site and minor tools, GST, LWC etc., complete.GI fittings 50mm dia |
| 6 | Elbow |
| 7 | Union Socket |
| 8 | Socket |
| 9 | Two coats on old work painting with synthetic enamel colour paint 1st quality of approved brand EIC (Ultima / All guard /Asian/Nerolack/Berger) or equivalent over steel surfaces, preparation of surface including cleaning scrapping of the existing painted surface, cost of paint brush, scaffolding arrangements, transportation charges of all materials to worksite, all labour charges, minor tools including GST, LWC etc. complete anticipated Qty. |
| 10 | Plastering with cement mortar 1:4 with 12mm thick over exposed surface of concrete, hollow block walling, including cost of transportation charges, all labour charges and minor tools GST etc., complete. |
| 11 | Providing and laying of PCC 1:2:4 (one cement, two mainland river sand, four stone chips 20mm (Port Blair quarry product) including cost of cement, mainland river sand, 20mm size stone chips, cost of all labour charges for mixing of concrete, placing, consolidation curing and transportation charges for all materials to worksite hire charges of mixer machine & vibrator, minor tools GST etc., complete. |
| 12 | Cleaning the inspection chamber of septic tank/ WC Pan wherever and whenever required including removing the blockage and cleaning the chamber etc. inlcuding cost of all labour charges and minor tools GST etc complete anticipated qty. |
| 13 | Cleaning jungle including uprooting of rank vegetation grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of IM above ground level and removal of rubbish upto a distance of 50 mtrs outside the periphery of the area cleared, including cost of all labour charges and minor tools GST etc. complete anticipated Qty. |
| 14 | Supply of SM, SSM and USM for attending the departmental works like dismantling door & windows cleaning of toilet on sub division office and other miscellaneous works wherever required and planting new plants including watering, day to day water supply to the colony area and also for attending the works which are non susceptible to measurement etc. including cost of all labour charges and minor tools, GST etc. complete anticipated qty. |
| 15 | Skilled Mazdoor |
| 16 | Un-Skilled Mazdoor |
| 17 | Distempering with 1st quality oil bound washable distemper of approved manufacturer and of required shade and colour to give an even shade over the new work ( two or more coat) over a priming coat of cement primer at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface including cost of primer, oil bound washable distemper, brushes, putty, sand paper, scaffolding and other materials required for this work, transportation charges of all materials to work site, labour charges, minor tools, GST etc. complete. |
| 18 | Finishing with all anfigual paint of approved brand at all location prepares and applied as per manufacturer specification including appropriate priming coat, preparation surface etc., complete. (Complete works) including cost of primer, epoxy paint, all labour charges minor tools GST LWC etc., complete, (Exterior wall surface). Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 1 dayBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender