Housing Urban and Rular Development Local Bodies Closing in 3 days TDR #57981478

Tender For Design, Construction, Supply, Installation, Testing And Commissioning Of 5.2 Mld Stp Based On Sbr With Tertiary Treatment And Providing Sewer Network In Belgaria Township Including 5 Years Operation And Maintenance (2 Years Dlp)

Issued by Local Bodies · Dhanbad, Jharkhand
Tender Value
62.37 Crore
Estimated cost
Bid Submission
31 Oct 2026
3 days left
EMD
62.37 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Dhanbad → Jharkhand
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Design, Construction, Supply, Installation, Testing And Commissioning Of 5.2 Mld Stp Based On Sbr With Tertiary Treatment And Providing Sewer Network In Belgaria Township Including 5 Years Operation And Maintenance (2 Years Dlp)

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 17-Oct-2026 Name of work and NIT reference in BOQ Financial Bid 31-Oct-2026

BOQ

Name of Work:-
Sl. No. Item Description
1Process Design and drawings as defined in Volume 2 and Volume 3 of the Bidding Document.
2Complete site survey works including survey layout showing complete details of the site with levels and report, complete site geotechnical investigation works with bore hole location plan and reports, electrical resistivity test report.
3Process Description, Process Flow Diagram, Process Design Calculations, 2D Plant Layout, 3D Plant Layout, Complete Plant Piping Layout, Hydraulic Design Calculations, Hydraulic Flow diagram, P&IDs, Mass Balance, Plant water, scum & drain Philosophy, potable water usage plan, tanker filling station and other design details as required and specified in tender document. Sewer Network design of project area complete in all respect. Hydraulic design to be conducted on Sewer GEM.
43D model walkthrough video showcasing the entire plant layout and its facilities.
5Single Line diagrams and Electrical drawings complete.
6Operation Philosophy, Control Philosophy, I/O List, Cause and Effect Matrix, Real time online water quality monitoring systems, Auto samplers system complete.
7Any other necessary document which Bidder feels necessary for project completion needs to be added including all essential Investigation, Model Study (if required) ,etc. required to complete the Works.
8Civil, Architectural & Structural Designs and Drawings as defined in Bid Documents , complete in all sense
9Sewer Network
10Pumping Mains
11SPS 1
12SPS 2
13Mechanical Design, Drawings, and Documentation as defined in Volume 2 of the BiddingDocument.
14Sewer Network
15Pumping Mains
16SPS 1
17SPS 2
18Any other necessary document which bidder's feels necessary for project completion needs to beadded including all calculations etc. required to complete the Works.
19Electrical Design, Drawings and Documents as defined in Volume 2 and Volume 3 of theBidding Document.
20HT Overhead Line Sysytem
21Single Line Diagram (HT & LT System).
22Electrical Load List, Sizing calculations for 11kV Switchgear Panel, Transformers, DG Set, LT
23Panels (PCC/MCC), HT/LT Cables, Earthing & Lightning Protection etc.,
24Electrical Equipment Layout and GA Drawing.
25Cabling Layout for the Plant (Indoor & Outdoor).
26Lighting, Earthing and Lightning layout (Indoor & Outdoor).
27Guaranteed Technical particulars (GTP), GA, Control Wiring Diagrams, BOM & QAP of all equipment.
28Any other necessary document which bidder's feels necessary for project completion needs to be added including all calculations etc. required to complete the Works.
29Instrumentation, Control, and Automation Design, Drawings and Documentation as defined in Part 7 and Part 13 in Volume 2 of Bidding Document
30Instrumentation, Control, Automation (ICA) inclusive of complete field instrumentation, PLC based SCADA system, Functional Design Specifications (FDS) for Instrumentation, FDS for Control & Automation systems, and all other equipment required as per specifications, System Architecture Design, Instrument Data Sheets, Hook-up Diagrams for complete ICA works, Loop Diagrams, Cable Layout Drawings, Internal Wiring Diagrams for PLC cum RIO panels, Layout Drawing for Control Room, Software Design Specification (SDS), Test Plans and Procedures including set point list (For FAT and SAT), Calibration Procedures, Interoperability test reports, and all allied works complete as required under the specifications.
31Plant Asset Management System (PAMS) Software and its interface with STP PLC based SCADA system and Mobile app to streamline and enhance the tracking, maintenance, and management of all assets within the STP as defined in Volume 2.
32Laboratory Information Management System (LIMS) software with Sample Management, Workflow Automation, and Data Management. Optional modules for Electronic Lab Notebook, Instrument Integration, and Inventory Management, with modular expansion based on laboratory needs with Interfacing with STP PLC based SCADA system and with various laboratory instruments of the plant as defined in Volume 2.
33Any other necessary document which bidder's feels necessary for project completion needs to be added including all calculations etc. required to complete the Works.
34Tests on Completion of Design-Build as defined in Volume 2 of Bidding Document
35For Effluent Quality.
36For Sludge Quality.
37For Grit Quality.
38For Odour Quality.
39For Noise Level.
40Tests prior to Contract Completion as defined in Volume 2 of Bidding Document
41For Effluent Quality.
42For Sludge Quality.
43For Grit Quality.
44For Odour Quality.
45As Built Drawings
46Main Process Documents.
47Civil, Structural & Building Works and piping.
48Mechanical systems.
49Electrical systems.
50Instrumentation systems.
51Control and Automation System.
52Scale model of the plant inside the Admin building as defined in the tender document.
53Mandatory Documents to be furnished at various stages of the design works to meet the requirements specified in Volume 2 and Volume 3 of the tender document
54Monthly Environmental Monitoring Reports.
55Monthly Project Progress Reports.
56Surge Analysis of Pumping Mains.
57Concept Design Report on STP,SPS1,SPS2,MPS Process
58Concept Design Report on STP,SPS1,SPS2,MPS Hydraulics.
59Concept Design Report on Civil Works of the Project
60Concept Design Report on Structural Design Works of the complete project
61Concept Design Report on Mechanical Works of the complete project.
62Concept Design Report on Electrical Works of the complete project
63Concept Design Report on Instrumentation Works of the complete project.
64Concept Design Report on Control and Automation Works of the complete project
65Report on Architectural Works of the Buildings of the complete project
66HAZOP Study Reports.
67Detailed Study Report on Odour.
68Fault Level Calculations, Load Flow and Harmonic Studies.
69Energy Optimization Plan.
70FAT Reports.
71SAT Reports.
72Report on Plant Laboratory Setup.
73Implementation Report on Cyber Security.
74Operation & Maintenance Manuals.
75Training Programme and Manuals.
76Any other necessary report which bidder's feels necessary for project completion needs to be added including all calculations etc. required to complete the Works.
77Bidder shall list here details of additional items required.
78Sewer Network
79Carriage of material by mechanical transport including loading, unloading and stacking as directed upto a lead of 5 km
80Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil. Note: Bidder to refer L-section attached in Volume 3 for varying depths. However the the actual depth shall depend on Approved Hydraulic Design of Sewer Network
81Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m.
82Providing and laying in position ready mixed or site batched design mix cement concrete for plain cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana/Ordinary Portland/Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting f concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing,carriage for all leads; but excluding the cost of centering, shutteringand finishing as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 110% of the minimum specified cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All works upto plinth leveL Concrete of M20 grade with minimum cement content of 270 kg /cum.
83Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
84Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.5.22.6 Thermo-Mechanically Treated bars of grade Fe-500D or more.
85Providing and laying in position ready mixed or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete. Note: Extra cement up to 10% of the minimum specified cement content in design mix shall be payable separately. In case the cement content in design mix is more than 1.10 times of the specified minimum cement content, the contractor shall have discretion to either re-design the mix or bear the cost of extra cement. All work upto Plinth Level:- Concrete of M25 grade with minimum cement content of 330 kg /cum
86U-PVC pipes (working pressure 4 kg / cm²) Single socketed pipe 110 mm dia
87Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand)including testing of joints etc. complete : 19.6.2 150 mm dia. R.C.C. pipe
88Providing and laying non-pressure NP2 class (light duty) R.C.C. pipes with collars jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand)including testing of joints etc. complete : 19.6.3 200 mm dia. R.C.C. pipe
89Providing orange colour safety foot rest of minimum 6 mm thick plastic encapsulated as per IS : 10910, on 12 mm dia steel bar conforming to IS: 1786, having minimum cross section as 23 mmx25 mm and over all minimum length 263 mm and width as 165 mm with minimum 112 mm space between protruded legs having 2 mm tread on top surface by ribbing or chequering besides necessary and adequate anchoring projections on tail length on 138 mm as per standard drawing and suitable to with stand the bend test and chemical resistance test as per specifications and having manufacture’s permanent identification mark to be visible even after fixing, including fixing in manholes with 30x20x15 cm cement concrete block 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) complete as per design.
90Supplying and fixing C.I. cover without frame for manholes : 19.18.2 500 mm diameter C.I. cover (medium duty) the weight of the cover to be not less than 58 kg
91Supplying stacking and laying of stone solling including packing with smaller stone and consolidating with steel rammer includng spreading and consolidating of blinding material moorum or earth etc. Compelete (payment to be made for quantatity of only stone solling used after deducting voids excluding blinding material.
92Providing and Laying Main Header Pipeline from SPS-1 to SPS 2 complete in all respect
93Providing and Laying Main Header Pipeline from SPS 2 to MPS at STP complete in all respect
94Providing and Laying Main Header Pipeline from MPS to STP Receiving Chamber complete in all respect
95HT Overhead Line System
96SPS-1 including process units, utility buildings, boundary wall,entry gate,roads,green belt, drainage,platforms, pavements etc as per bid document , complete in all respect
97SPS-2 including process units, utility buildings, boundary wall,entry gate,roads,green belt, drainage,platforms, pavements etc as per bid document , complete in all respect complete in all respect
98MPS including process units, utility buildings, boundary wall,entry gate,roads,green belt, drainage,platforms, pavements etc as per bid document , complete in all respect complete in all respect
99STP including process units, utility buildings, boundary wall,entry gate,green belt,roads drainage,platforms, pavements etc as per bid document , complete in all respect complete in all respect
100The bidder shall list here details of any additional items (all areas of the works) required fora complete installation.
101Process Plant and Equipments, Piping and Fittings as defined in the Bidding Document.
102S/F T.P. MCB DB - Supplying and fixing following way, three pole and netural, sheet MCB ditribution board, 415 volts, on surface/recess, complete with tinned copper busbar, netural busbar, earth bar, din bar, detachable gland plate, interconnections, phosphatized and powder painted including earthing etc. as required. (But without MCB/RCCB/Isolator)
1034 way (4 + 12), Double door, Horizontal type
1046 way (4 + 18), Double door, Horizontal type
105S/F 'C' series, MCB - Supplying and fixing following 240 volts, 'C' series, miniature circuit breaker suitable for inductive loads of following poles in the existing MCB DB complete with connection, testing and commossioning etc. as required.
1066/32 amps, Single Pole
107Supply of 11kV underground / overhead Cables, Termination Kits at following locations as per scope and specifications
10811kV Outdoor cable termination at Tariff Metering Unit.
10911kV Indoor cable terminations at incomer and outgoings of 11kV Metal Enclosed Switchboard /11kV ICOG Panel of Sewage Treatment Plant,SPS-1,SPS-2
11011kV Outdoor cable terminations at primary side of 11kV / 0.433 kV Transformers of Sewage Treatment Plant,SPS-1,SPS-2
11111kV XLPE Cable from Metering Unit to incomer of 11kV Metal Enclosed Switchboard of Sewage Treatment Plant,SPS-1,SPS-2
11211kV XLPE Cables from 11kV Metal Enclosed Switchboard to Primary cable end boxes of 11kV/0.433kV Transformers of Sewage Treatment Plant,SPS 1, SPS 2
11311kV Cable Straight through joints.
114Supply of Electrical equipments for SPS 1, SPS 2 , MPS, STP
11511kV Metal Enclosed Switchboard & 11kV ICOG Panel with VCBs for SPS 1, SPS 2 , STP
116Diesel Generator Set complete with AMF Control Panel for SPS 1, SPS 2 , STP
11711kV / 0.433kV Transformers. for SPS 1, SPS 2 , STP
118LT Non Segregated Aluminium Bus ducts with necessary supporting structure for SPS 1, SPS 2 , STP
119415V Switchgear PCC for SPS 1, SPS 2 , STP
120415V DG PCC for SPS 1, SPS 2 , STP
121415V Capacitor banks with Automatic Power Factor Correction Relay for SPS 1, SPS 2 , STP
122110V D.C Battery Bank, Battery Charger with D.C Distribution Board for SPS 1, SPS 2 , STP
123Supply of Motor Control Centers , Distribution boards etc of Motor Control Centres, Distribution boards etc at various locations in SPS 1, SPS 2 , STP with following major equipment, items as per scope, specification and drawings.
124SPS 1 MCC.
125SPS 2 MCC.
126STP Primary Unit MCC.
127STP Secondary Process Unit MCC.
128STP Tertiary Treatment Unit MCC.
129Main Lighting DB.
130Variable Frequency Drives MCC, Active Harmonic Filters (AHF)
131Local Push Button Stations.
132Miscellaneous works-Distribution Board (Valve DB, Fan DB, Power DB, Auxiliary DB etc.)
133Supply of Lighting System at SPS 1, SPS 2 , STP with following major equipment, items as per scope, specification and drawings.
134Lighting Fixtures.
135Lighting panels.
136Switchboards, Receptacles, Power Plug & Sockets, Switches, Ceiling fans with regulators etc.,
137Point wiring with conduits, wires, supports etc for Lighting fixtures, Receptacles, Ceiling fans etc
138Street Lighting and Area Lighting poles with Junction boxes and Over hang.
139Solar PV System for Street Lighting.
140Supply of L.T Cabling System, HT/LT Cable Carrier System of L.T Cabling System, HT/LT Cable Carrier System at SPS 1, SPS 2 , STP with following major components as per scope, specification and drawings.
141L.T cables.
142L.T Cable termination with glands and lugs.
143Cable trays on supports for both LT and HT Cables.
144Hume Pipe.
145Supply of Earthing & Lightning Protection System of Earthing & Lightning Protection System at components as per scope, specification and drawings. with following major components as per scope, specification and drawings.
146Earthing Conductor for outdoor main grid.
147Earthing Conductor for indoor main grid.
148Earthing Conductors for outdoor equipments and Junction Boxes.
149Lightning Protection system with Arrestors, Down Conductors, Test Links, and Counters.
150Earthing Conductor for indoor equipments.
151Treated Earth pits.
152Lightning System Earth pits.
153Complete Installation, testing and commissioning of safety procedures with Signage for Electrical Equipments at SPS 1, SPS 2 , STP as per scope, specification and drawings.
154The bidder shall list here details of any additional items required for a complete installation.
155Supply of the following Instrumentation Systems as per Technical Specifications.
156Supplying of Electromagnetic Flow meter's with Indicating Transmitter's with totalizer (full bore type) with flange Ends, rates shall be inclusive of mating flanges with necessary fasteners and gaskets, for the complete project. The flow meter shall be Interfaced with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
157Supplying of Radar type open channel flow measurement (Parshall Flume) with Transmitter's along with required accessories and fittings for open channel flow measurement for the complete STP. The flow meter shall be Interfaced with PLC based SCADA control system.
158Supplying of Air Flow Measuring System (Thermal mass flow meter) along with the required accessories & fittings for the complete STP. and Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
159Supplying of Radar Type Level Transmitter's with indicators & alarms as required including all required Mounting accessories for the complete STP. and Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2. Following are the minimum locations where Radar type Differential Level
160Supplying of Radar Type Differential Level Transmitter's with indicators & alarms as required including all required Mounting accessories for the complete STP. and Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
161Supplying of Sludge Blanket Level Transmitter's with indicators & alarms as required including all required Mounting accessories for the complete STP. and Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
162Supplying of Conductivity type Level Switches, High & High Level and Low & Low Level sensing with 4 point contact, including all necessary instrumentation cabling, glands with suitable stub and flange and bolting arrangement for hook-up, for the complete Project and also Interfacing with PLC based scada control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
163Supplying of Pressure Indicating Transmitter's with necessary instrumentation cabling, manifold, glands and conduit with suitable stub and flange and bolting arrangement for hook-up, for the complete project. Also Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
164Supplying of Temperature Indicating Transmitter's with necessary instrumentation cabling, manifold, glands and conduit with suitable stub and flange and bolting arrangement for hook-up, for the complete STP. Also Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume 2.
165Supplying of Pressure Switches on all the individual pumps and individual blowers (Refer Part 11 for list of pumps and blowers) with necessary instrumentation cabling, glands and conduit with suitable stub and flange and bolting arrangement for hook-up, Pressure switch and also Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control
166Supplying of Flow Switches on all the individual pumps (Refer Part 11 for list of pumps) with necessary instrumentation cabling, glands and conduit with suitable stub and flange and bolting arrangement for hook-up, Flow switch and also Interfacing with PLC based SCADA control system with minimum I/O Requirements for Auto mode Control operation of the Plant as defined in Volume
167Supplying of Float type Level Gauges on all types of chemical tanks (Refer Part 11 for list of chemical tanks) with necessary length of tubing suitable for mounting , including isolating valve for maintenance etc., complete with all lead and lifts etc, for the Plant as defined in Volume 2.
168Supplying of glycerine filled stainless steel pressure gauges of 150 mm Dia. Dial suitable on top of Air vessel with nipple, snubber for vibration resistance and necessary length of SS tubing suitable for mounting , including three isolating valve for maintenance etc., complete with all lead and lifts etc, for the mounting on individual discharge line and common discharge lines of all types of pumps and blowers as defined in Volume 2 (Refer Part 11 for list of pumps and blowers).
169Supplying of Field instruments IP-65 enclosures for complete field instrumentation.
170Supplying of Field Junction boxes.
171Supplying of Surge protection Devices for all the instruments.
172Supply of dedicated online UPS systems at (1) Control room of PLC SCADA system, (2) Admin Building, (3) individual RIO panels, (4) CCTV system including fire alarm control panel of the STP. Each UPS shall independently provide power backup for all the connected equipment, ensuring 120minutes of backup on full load at each location.
173Supplying of Air conditioning system for control room with all accessories complete as required under specifications.
174Instrumentation Earthing system for complete STP.
175Supplying of Weight Indicator cum Transmitter with required accessories & fittings.
176The bidder shall list here details of any additional items required for a complete installation.
177Supply of Online Analytical Instruments as per Technical Specifications defined in Volume
178Dissolved Oxygen Analyzer + Accessories + fittings.
179ORP Analyzer's+ Accessories + fittings.
180pH Analyzer+ Accessories + fittings.
181Temperature Analyzer-+ Accessories+ Fittings.
182MLSS Analyzer-+ Accessories+ Fittings.
183Turbidity Analyzer-+ Accessories+ Fittings.
184Conductivity Analzyer+ Accessories + fittings.
185Supply of Online Real Time Multi Parameters Continuous Monitoring System for Influent and Treated Sewage Parameters & Auto Samplers. and Treated Sewage Parameters & Auto Samplers.
186Dissolved Oxygen Analyzer + Accessories + fittings.
187ORP Analyzer's+ Accessories + fittings.
188pH Analyzer+ Accessories + fittings.
189Temperature Analyzer-+ Accessories+ Fittings.
190MLSS Analyzer-+ Accessories+ Fittings.
191Turbidity Analyzer-+ Accessories+ Fittings.
192Conductivity Analzyer+ Accessories + fittings.
193Supply of the Instrumentation Cables/cable trays as per Technical Specification.
194Supplying of Instrumentation & Control Cables and Power Cables, OFC, Glands & Lugs, cable conduits, etc., as required to complete the entire Instrumentation, control and automation system, required as per specifications.
195Supplying and installation of hot dip GI perforated cable tray's with cover along with required angle supports, with coupler plates, Anchor bolts and nuts etc complete and the tray should be fitted on the wall / ceiling etc. complete for all instrumentation cables.
196Supplying of redundant PLC (Hot standby PLC system), I/O Modules (critical inputs shall be on redundant I/O's), redundant managed ethernet switches, RIO 's with 16\\"color touch screen HMI, Redundant power supply, Spares as indicated in the specifications,etc..with all required accessories, required hardware & software complete with licensing, any other hardware & software to meet the requirements as per specifications.
197Supplying of PLC &16\\" HMI programming software for all PLC and HMI equipment.
198Supplying of redundant SCADA server software (SCADA is on dual redundant server) and historian software.
199Supplying of SCADA Server stations with 32\\" LED monitor system, loaded with latest authorised windows server operating system compatible with automation software, latest MS Office professional, licensed latest & proven PLC programming software, licensed SCADA software, centralized server monitored Anti virus software, required licensed network monitoring software, licensed firewall software, etc., with all accessories complete to meet the requirements as per specifications
200Supplying of SCADA operator stations, engineering stations, Historian Stations & CCTV stations with 32\\" LED monitor systems, loaded with latest authorised windows operating system compatible with automation software, latest MS Office professional, licensed SCADA software, licensed client Anti virus software, required licensed network monitoring software, etc., all accessories complete to meet the requirements as per specifications.
201Supplying of SCADA operator stations, engineering stations, Historian Stations & CCTV stations with 32\\" LED monitor systems, loaded with latest authorised windows operating system compatible with automation software, latest MS Office professional, licensed SCADA software, licensed client Anti virus software, required licensed network monitoring software, etc., all accessories complete to meet the requirements as per specifications.
202Supplying of 3 No's Industrial Laptop 16\\" screen loaded with authorised windows operating system, MS Office and PLC & HMI programming software, SCADA software with all accessories complete.
203Supplying of SCADA System industrial consoles for housing the complete SCADA system with all accessories complete as per specifications.
204Supplying of LED screens, 55\\" in array of 2x3 (total 6 monitors) networked with SCADA & CCTV servers to display the SCADA screens, CCTV feeds, with all accessories complete in real time.
205Supplying of Pole / Wall Mounted, outdoor LED display screen of size (55”each in a 2x3 display array) networked with SCADA servers to be placed near the main entrance gate to digitally display all the real-time parameters of the STP and any other information as appropriate and as directed by Engineer, with all accessories complete in real time.
206Supply of wall mounted digital display touch screen of size 15 inches to digitally display real time temperature and noise level of all the process and non process buildings with networked with SCADA for remote monitoring/display on real time with all required sensors, accessories and fittings complete.
207Interoperability test in co-ordination with existing CP-024 & MIS-2 SCADA system @ Shimsha Bhavan to achieve complete data integration between this contracts and centralized SCADA centers to meet the requirements as per specifications.
208Supplying of redundant GPRS Communication modules with redundant SIM cards, redundant power supply units with all required accessories to communicate & receive all data from TSPS & STP of this contract, to existing CP-024 & MIS-2 SCADA system @ Shimsha Bhavan for bulk data transfer for monitoring and control.
209Supplying of CCTV IR water proof cameras suitable for upto 100ft. with IR Dome camera, 360 degrees view, control key board, DVR, Hard Disk, cables, UPT transreceivers, complete with all required accessories, software and hardware required, CCTV server station loaded with CCTV software with latest windows OS with minimum 2 TB hard drive, licensed anti virus etc,.. with 32\\"LED monitors connected via LAN to SCADA servers, mounting poles, fixtures,etc.. (Close Circuit Television System to be installed to cover all areas of the facilities, inclusive of high speed internet bandwidth as required to monitor the CCTV feed remotely and via web based browsers. CCTV feeds shall be monitored from SCADA control room).
210Implementation of Plant Asset Management System (PAMS) Software, and its interface with STP PLC based SCADA system and Mobile app to streamline and enhance the tracking, maintenance, and management of all assets within the STP as defined in Volume 2.
211Laboratory Equipments under the contract shall include:Comparator test set for residual chlorine or chloroscope (1 No)Multi Parameter (pH and Conductivity Meter) (1 No)Mains operated pH meter completed with one calomel electrode and glass electrode (1 No)Turbidimeter - Bench Model (Nephelometric Type) (1 No)Turbidimeter - Hand held (Portable) (1 No)Spectrophotometer (1 No)Water bath with 6 to 8 concentric holes and discs, electrically heated (1 No)Soxhlet extraction unit (1 No)Kjeldahl digestion unit (1 No)Hot plates (10 No's)Distilled water plant (1 No)Demineraliser (1 No)Refrigerator (320 litres capacity) double door (1 No)B.O.D. incubator (1 No)BTNO (1 No)Electric oven (1 No)Magnetic stirrer (1 No)Monopan balance with digital display (1 No)Jar-Test apparatus with RPM controller and simultaneous addition of Chemicals in all jars (1 No)Centrifuge (1 No)Gas cylinder if gas supply is not available (1 No)Fume cupboard/hood (2 No's)Field Test kit for cations and anions (2 No's)Depth sampler (2 No's)Online Total organic carbon analytical analyser with online feedback to LIMS and SCADA system(1 No)Sieve shaker with standard sieves and Two pan balance, weighing up to 200gm samples (1 No)Weighing Balance (Max. 10 kg) (1 No)Durham tubes and Imhoff cones (1 lot)D.O meter (1 No)Specified Gravity meter (1 No)Consumables -disposable & Re usable type
212Equipment Needed For Bacteriological ExaminationHot Air Oven (1 No)Autoclave (1 No)Incubator 37°C or 44°C (Water/Air-Jacketed) (1 No)Binocular microscope (1 No)Digital pH Meter (1 No)Pipette Box (Stainless Steel - 10 No's)Wooden Racks/Aluminium Racks (5 No's)Wire Baskets (10 No's)Cotton/ Aluminium Foils (10 No's)Burners (Bunsen) With Pilot Lamp (3 No's)Suction Flask (1 Litre Cap - 2 No's)Suction Pump (2 No's)Sampling Bottles (10 No's)Measuring Cylinders (1000 Ml, 500 Ml, 200 Ml, 100 Ml, 50 Ml, 25 Ml) - Each 3 No'sVacume pump (2 No's)
213Bacteriological MediaM. Endo Broth (dehydrated) (1 No)Lactose or Lauryl Tryptose broth (1 No)Mac Conkey broth (1 No)Brilliant Green Bile Lactose Broth (1 No)Total Plate Count Agar (1 No)Peptone/Triyptone Water (1 No)Laminar Air Flow Chamber (1 No)
214Laboratory Information Management System (LIMS)Laboratory Information Management System (LIMS) software with Sample Management, Workflow Automation, and Data Management. Optional modules for Electronic Lab Notebook, Instrument Integration, and Inventory Management, with modular expansion based on laboratory needs with Interfacing with PLC based SCADA system and with various laboratory instruments of the plant as defined in Volume 2.
215The bidder shall list here any additional laboratory Equipment Required.
216Operation and Maintenance ( including mampower, chemicals, diesel, civil maintenance, troubleshooting and maintenance of all the Electrical, Mechanical, Instrumentation, Communication items/ all the supplied items, sewer network, laboratory consumables)
217O&M in 1 st year ( DLP Period)
218O&M in 2 nd year (DLP Period)
219O&M in 3 rd year
220O&M in 4 th year
221O&M in 5 th year
222Disposal
223Screen
224Sludge
225Training of JRDA personnel and all other inspection,Testing,Repair,and Handingover activities required during fifth year of O & M or as directed.
226Power Consumption
227Guaranteed Power Consumption during 1 st year of O&M ( DLP Period)
228Guaranteed Power Consumption during 2 nd year of O&M ( DLP Period)
229Guaranteed Power Consumption during 3 rd year of O&M
230Guaranteed Power Consumption during 4 th year of O&M
231Guaranteed Power Consumption during 5 th year of O&M
232Add 18 % GST
233Add 1% Labour Cess Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57981478
AUTHORITY Local Bodies
TENDER VALUE 62.37 Crore
LAST DATE 31-10-2026
Authority
Authority Name Jharia Rehabilitation And Development Authority
Work Description Tender for Design, Construction, Supply, Installation, Testing And Commissioning Of 5.2 Mld Stp Based On Sbr With Tertiary Treatment And Providing Sewer Network In Belgaria Township Including 5 Years Operation And Maintenance (2 Years Dlp)
Basic Detail
Tender No JRDA/CIVIL/26-27/24/286 Date 05.10.2026
Bidding Type Tender
Location
City Dhanbad
State Jharkhand
Key Dates
Publish Date 17 Oct 2026
Submission Date 31 Oct 2026
Open Date 01 Jan 0001
Finance
Tender Value 62.37 Crore
Tender Fee 10000
EMD 62.37 Lakhs
Exemption Not Available
Document List
7cf3d28e-89da-4670-97f8-a19615877a9a.html
BOQ_162000.xls
eNIT24.pdf
Tendernotice_1.pdf
Volume_2_Technical_Specifications.pdf
Vol_3_Drawings.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 17, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 31, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 3 days
Oct 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 3 days

Tender Documents

Download All (ZIP) ↓
html

7cf3d28e-89da-4670-97f8-a19615877a9a.html

xls

BOQ_162000.xls

pdf

eNIT24.pdf

pdf

Tendernotice_1.pdf

pdf

Volume_2_Technical_Specifications.pdf

pdf

Vol_3_Drawings.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender