Tender For Supply, Erection And Commissioning,Integration With Scada System Of Electromagnetic Flowmeter Suitable To Measuring Discharge Of Water Including Cost Of Flanges With Operation And Maintenance Along With annual maintenance contract For 5 Ye
Tender Overview
Project Description
Tender for Supply, Erection And Commissioning,Integration With Scada System Of Electromagnetic Flowmeter Suitable To Measuring Discharge Of Water Including Cost Of Flanges With Operation And Maintenance Along With annual maintenance contract For 5 Years
BOQ
| Sl. No. | Item Description |
| 1 | Supply of RTU/ PLC at inlet/ outlet of each booster pumping station consisting with:1.Programmable logic controller 16 DVOS , Aux 24 VDC/230 C AC : 01 Nos.2. GSM/GPRS Module: 01 Nos.3. Suitable size enclosure box 1P55 type ,16 mm CRCA sheet, wall / floor mounted : 01 Nos.4. Power Supply : 01 Nos.5. Cat 6 Cable as per site requirement.6. Wire and accessories - 1 LOT7.Cooling fan , Panel light DLS, Duct, Thimble ,Channel and other accessories -18.Sim Card for data transmission -01 Nos.9. Relay Board - 01 Nos.10.Terminal Blocks. As req.7 |
| 2 | Comprehensive Operation and Maintenance of 267 unit of Electromagnetic Flow Meters, Integration with SCADA System (Including replace/repair of faulty flow meter ,RTU/PLC and All Accessories) |
| 3 | Comprehensive Operation and Maintenance of 267 unit of Electromagnetic Flow Meters, Integration with SCADA System (Including replace/repair of faulty flow meter ,RTU/PLC and All Accessories) for 2nd year |
| 4 | Comprehensive Operation and Maintenance of 267 unit of Electromagnetic Flow Meters, Integration with SCADA System (Including replace/repair of faulty flow meter ,RTU/PLC and All Accessories) for 3rd year |
| 5 | Comprehensive Operation and Maintenance of 267 unit of Electromagnetic Flow Meters, Integration with SCADA System (Including replace/repair of faulty flow meter ,RTU/PLC and All Accessories) for 4th year |
| 6 | Comprehensive Operation and Maintenance of 267 unit of Electromagnetic Flow Meters, Integration with SCADA System (Including replace/repair of faulty flow meter ,RTU/PLC and All Accessories) for 5th year |
| 7 | Supply, Erection ,Commissioning , Integration with SCADA System of Electromagnetic Flowmeter of Size 100 MM as per technical specification |
| 8 | Supply Erection Commissioning , Integration with SCADA system of Electromagnetic Flowmeter of Size 150 MM as per technical specification. |
| 9 | Supply Erection, Commissioning and Integration with Scada System of Electromagnetic Flowmeter of Size 200 MM as per technical specification |
| 10 | Supply Erection, Commissioning and Integration with SCADA System of Electromagnetic Flowmeter of size 250 MM as per technical specification |
| 11 | Supply, Erection , Commissioning and Integration with Scada System of Electromagnetic Flowmeter of size 300 MM as per technical specification. |
| 12 | Supply Erection, Commissioning and integration with SCADA system of Electromagnetic Flowmeter of size 350 MM |
| 13 | Supply, Erection , Commissioning and Integration with SCADA system of Electromagnetic Flowmeter of size 400 MM as per technical specification |
| 14 | Supply, Erection and Commissioning of SCADA Server System |
| 15 | Supply, Erection and Commissioning,Integration with SCADA system of Electromagnetic Flowmeter suitable to measuring discharge of water including cost of flanges with operation and maintenance along with AMC for 5 years Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender