Tender For Annual Rate Contract For Reclamation Of Power Transformers Through Ssi Units Under The Jurisdiction Of Sub Transmission Division Sopore For The Year 2026-27 Or Till Next Rate Contract Is Finalized.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Nov 2026
6 days left
EMD
1.60 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baramulla → Jammu and Kashmir
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Rate Contract For Reclamation Of Power Transformers Through Ssi Units Under The Jurisdiction Of Sub Transmission Division Sopore For The Year 2026-27 Or Till Next Rate Contract Is Finalized.
BOQ
| Sl. No. | Item Description |
| 1 | Repairing Part |
| 2 | Labour charges including loading at Inspection Site, Dragging, Carriage/ Transporation upto other Firm works,unloading at Firms works,dragging including insurance during transit etc ( Complete Job) ( Rates quoted will be valid for average lead of 50 to 60 Km’s above that 10% appreciation will be given for every extra 15 Km’s. For carriage distance less than 20 KM’s rate quoted will be decreased by 15%) |
| 3 | 3.15/04 MVA , 33/11k KV |
| 4 | 5 MVA 33/11/6.6 KV |
| 5 | 6.3MVA, 33/11/6.6 KV |
| 6 | 10 MVA, 33/11k KV |
| 7 | Detanking of whole Transformer complete Job including refitting back after repairs |
| 8 | 3.15/04 MVA , 33/11k KV |
| 9 | 5 MVA 33/11/6.6 KV |
| 10 | 6.3MVA, 33/11/6.6 KV |
| 11 | 10 MVA, 33/11k KV |
| 12 | Supply and Fabrication of New HV / LV copper conductor (Base rate of copper to be quoted and final applicable rate as per IEEMA will be given) |
| 13 | Fabrication of New HV / LV copper conductor |
| 14 | Insulation of new HV / LV copper conductor |
| 15 | Supply and installation of High Density parmali wood |
| 16 | Supply and installation of New insulting press board |
| 17 | Supply and topping of New EHV Grade transformer oil Ltr |
| 18 | Filtration charges for new EHV grade transformer oil |
| 19 | Supply and fixing of New gaskets RC 70 grade |
| 20 | Providing and installation of New Off load Tap Switch |
| 21 | Supply and fixing of 20 Paper cover copper flexible wire (25 mm sq. / 40mm sq.) |
| 22 | Providing and installation of New On load Tap Changer |
| 23 | Repair of on load Tap Changer |
| 24 | Providing and installation of 36 KV HV Bushing |
| 25 | Providing and installation of 12 KV LV Bushing |
| 26 | Providing and installation of 36 KV HV Brass Stud with Nuts |
| 27 | Providing and installation of 12 KV LV Brass Stud with Nuts |
| 28 | Providing and installation of C.I clamp for 33 KV Bushing |
| 29 | Providing and installation of C.I clamp for 11 KV Bushing |
| 30 | Providing and installation of Arcing Horn Assembly for 33 KV/ 11KV Bushing |
| 31 | Providing and installation of Copper thimble of sorts |
| 32 | Providing and installation of Phase separator with insulation between coil |
| 33 | Providing and installation of Galvanised H.W. items |
| 34 | Providing and installation of New transparent type silica gel breather. (Suitable for 10 MVA |
| 35 | Providing and installation of Buchholz relay (with alarm & trip contact |
| 36 | Providing and installation of Wheel Valve(Flange Type)50 mm |
| 37 | Providing and installation of BSP Gun metal wheel valve with cap( 1.5”/2.0” |
| 38 | Providing and installation of Radiator Shut off valve |
| 39 | Providing and installation of Oil level gauge in conservator |
| 40 | Providing and installation of Oil Temperature Indicator (with alarm & trip contact) |
| 41 | Providing and installation of Winding Temperature Indicator (with alarm & trip contact) |
| 42 | Providing and installation of Oil level indicator |
| 43 | Miscellaneous items like insulating paper, cotton Tap, Weaving Taps,SRBP Tube,Sleeving etc |
| 44 | Removal & blocking of OLTC Permanently |
| 45 | Repairing of tank by way of complete assessment of all leakages and repair of same by way of welding etc. |
| 46 | Repairing of Radiator |
| 47 | Repairing of Conservator , marshalling box |
| 48 | Filtration of Transformers Oil (carbonized/Old) |
| 49 | Replacement of Gasket with all materials as per direction of Engineering In-Charge where ever Require |
| 50 | Main tank |
| 51 | Radiator |
| 52 | H.V Bushing |
| 53 | L.V Bushing |
| 54 | Conservator Tank |
| 55 | Inspection Cover , Main Holes, Valves, Connecting , Pipes including tightening & terminal arrangement, of Buchholz relay, O.T.I,W.T.IMarshalling box. Etc |
| 56 | Re-conditioning of Silica gel Breather |
| 57 | Replacement of Silica gel Breather |
| 58 | Painting of transformer as per direction of Engineering In- Charge with all materials (cleaning & painting with one coat of primer & two coats of approved quality paint ). |
| 59 | Main tank |
| 60 | Conservator |
| 61 | Radiator |
| 62 | Tap Changer |
| 63 | Marshalling Box etc., |
| 64 | Heat Treatment (to be applied till desired values are achived) |
| 65 | Hot oil bath of power transformer incl. flushing out of sludge, carbon deposits from whole power transformer incl. core conductor radiator transformer tank valves etc. |
| 66 | Shifting of repaired Transformer from works site to Receiving Station /Divsional store ( job includes loading / unloading /dragging /carriage and commissioning at site including insurance during transit (Complete Job) ( Rates quoted will be valid for average lead of 50 to 60 Km’s above that 10% appreciation will be given for every extra 15 Km’s. For carriage distance less than 20 KM’s rate quoted will be decreased by 15%) |
| 67 | 3.15/04 MVA , 33/11k KV |
| 68 | 5 MVA 33/11/6.6 KV |
| 69 | 6.3MVA, 33/11/6.6 KV |
| 70 | 10 MVA, 33/11k KV |
| 71 | Replacement of burnt out / damaged transformer core with new one (CRGO) |
| 72 | Radiator Replacement per mm |
| 73 | Returnable Items |
| 74 | Scrap old copper conductor |
| 75 | Scrap old / carbonized transformer oil |
| 76 | Scrap Red iron Ms iron and Brass parts |
| 77 | Scrap core material. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 10, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedNov 04, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysNov 06, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender