Tourism Government Departments Closing in 16 days TDR #57977160

Tender For Recovery And Reconstruction Of Gravity Main Source From Thokchu To Delo Civil Lake-I, Santook G.P, Block-Ii Under 37Th Constituency,Kalimpong District Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).

Issued by Government Departments · Kalimpong, West Bengal
Tender Value
1.46 Crore
Estimated cost
Bid Submission
04 Nov 2026
16 days left
EMD
2.92 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kalimpong → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Recovery And Reconstruction Of Gravity Main Source From Thokchu To Delo Civil Lake-I, Santook G.P, Block-Ii Under 37Th Constituency,Kalimpong District Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).

BOQ

Name of Work:- Recovery and Reconstruction of Gravity Main Source from Thokchu to Delo Civil Lake-I, Santook G.P, Block-II under 37th Constituency,Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
Sl. No. Item Description
1Recovery and Reconstruction of Gravity Main Source from Thokchu to Delo Civil Lake-I, Santook G.P, Block-II under 37th Constituency,Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF).
2Recovery and Reconstruction of Gravity Main Source from Thokchu to Delo Civil Lake-I, Santook G.P, Block-II under 37th Constituency,Kalimpong District under National Disaster Response Fund (NDRF) and State Disaster Response Fund (SDRF). Removal of rubbish earth ,mixed with moorum, kankar, pebbles, rock, boulders etc.(a) Removel of spoils within a lead of 150m
3Clearing compound premises of shurbs, plants, jungles etc. By cutting and removing as directed (Specific permission of Engineer-in-Charge prior to execution will be necessary). (Payment to be made on area cleared)
4Earthwork in excavation in all sorts of soils but excluding stony and moorum soil including removing spreading of stacking the spoils within a laed of 150m as per directed & including triming the sides of trenches levelling dressing and bailing or pumping out water etc. required complete depth of excavation,exceeding 1 m and not exceding 2m below average bed level at the site of excavation and notrequiring shorting.
5Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
6Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. N.B
7Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size.
8Cement concrete (1:3:6) with 40mm down graded stone metal excluding shuttering with N.B variety stone metal.
9Ordinary Cement concrete (mix1:1.5:3) with graded stonechips (20mm nominal size) excludingshuttering and reinforcement if any, in ground floor as per relevant IS codes. ii) River Bazree
10Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 320 Kg of cement with super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M25
11Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. i) Tor steel/Mild steel.SAIL/TATA/RINL
12Hire and labour charge for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
13Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement25 mm.thick plaster.
14Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[Excluding cost of chipping over concrete surface]. (iii) with 1:4 cement mortar. 20 mm.thick plaster.
15Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
16Plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone boulder size 150mm and above placed in as directed, excluding shuttering if any (1:3:6).
17Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete inall respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) A) For Exposed Work . 150mm Dia.
18C.I. sluice valve with flanged ends drilled to as per I.S. 1358/62 andhaving all cast iron components as per I.S. 780/71 solid forged bronze inside screw spindle having ultimate tensile strength not less than 4.72 MT per sq. cm. Spindle nut valve and seat faces of hard wear resisting, manufactured from best quality gunmetal conforming to I.S. 780/71, painted black all over with asphalt base paint tested to 21 kg (hydraulic pressure) per sq. cm., valve opening to anticlockwise direction, fitted and fixed complete.
19Dismantling all types of plain cement concrete works, stackingserviceablematerialsat siteand removingrubbishasdirectedwithinaleadof75m. In Ground floor a) upto 150 mm. thick
20Storage Tank Severely Damaged (from Thokchu Jhora, Chagey Jhora, Pahar Jhora, Satarpack Jhora) Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 75 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
21Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
22Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. N.B
23Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size.
24Cement concrete (1:3:6) with 40mm down graded stone metal excluding shuttering with N.B variety stone metal.
25Controlled Cement concrete with well graded stone chips (20 mm nominal size) excluding shuttering and reinforcement with complete design of concrete as per IS : 456 and relevant special publications, submission of job mix formula after preliminary mix design after testing of concrete cubes as per direction of Engineer-in charge. Consumption of cement will not be less than 320 Kg of cement with super plasticiser per cubic meter of controlled concrete but actual consumption will be determined on the basis of preliminary test and job mix foumula. In ground floor and foundation. [using concrete mixture] M25
26Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. i) Tor steel/Mild steel.SAIL/TATA/RINL
27Hire and labour charge for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
28Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour.In ground floor. 3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement25 mm.thick plaster.
29Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[Excluding cost of chipping over concrete surface]. (iii) with 1:4 cement mortar. 20 mm.thick plaster.
30Neat cement punning about 1.5 mm. thick in wall, dado, window, sills, floor, drain etc.
31Plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone boulder size 150mm and above placed in as directed, excluding shuttering if any (1:3:6).
32Intake Pipeline Supplying, fitting and fixing G.I. pipes of TATA make with all necessary accessories, specials viz. socket, bend, tee, union, cross, elbo, nipple, longscrew, reducing socket, reducing tee, short piece etc. fitted with holder bats clamps, including cutting pipes, making threads, fitting, fixing etc. complete inall respect including cost of all necessary fittings as required, jointing materials and two coats of painting with approved paint in any position above ground. (Payment will be made on the centre line measurements of total pipe line including all specials. No separate payment will be made for accesories, specials. Payment for painting will be made seperately) A) For Exposed Work . 50mm Dia.medium quality.
33Supplying, fitting and fixing gunmetal wheel valve of approved brand and make tested to 21 kg per sq. cm. (for water lines only).50 mm medium qualtiy
34Earth work in excavation of foundation of structures as per drawing and technical specification,including setting out, removing, spreading or stacking of spoils within a lead of 75 m. as directed and including trimming the sides of the trenches, leveling, dressing and ramming the bottom, and backfilling with approved material complete as per direction of the Engineer-in-Charge .
35Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation.
36Labour for laying 150 mm to 200 mm boulder soling including rough dressing hand packing and ramming down small pieces in the interstics without rolling but including ramming and preparing the bed to proper level and filling up all joints with sandy clay or earth. N.B
37Supply of stone boulder (N.B. variety) of approved quarries above 150 mm to 200 mm dia size.
38Cement concrete (1:3:6) with 40mm down graded stone metal excluding shuttering with N.B variety stone metal.
39Ordinary Cement concrete (mix1:1.5:3) with graded stonechips (20mm nominal size) excludingshuttering and reinforcement if any, in ground floor as per relevant IS codes. ii) River Bazree. M 20 Grase.
40Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc. initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at inter-section, complete as per drawing and direction. i) Tor steel/Mild steel.SAIL/TATA/RINL
41Hire and labour charge for shuttering with centering and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams,columns, lintels curved or staight including fitting fixing and striking out after complection of works. (upto roof of ground floor). (a) 25 mm. to 30 mm. thick wooden shuttering as per decision & direction of the Engineer-in-charge. .
42Plaster ( to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering conrners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (ground floor).[Excluding cost of chipping over concrete surface]. (iii) with 1:4 cement mortar. 20 mm.thick plaster.
43Plum concrete work with cement concrete with 30mm down graded stone metal 40% and stone boulder size 150mm and above placed in as directed, excluding shuttering if any (1:3:6).
4418% GST
451%L.CESS Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57977160
AUTHORITY Government Departments
TENDER VALUE 1.46 Crore
LAST DATE 04-11-2026
Authority
Authority Name Gorkhaland Territorial Administration
Work Description Tender for Recovery And Reconstruction Of Gravity Main Source From Thokchu To Delo Civil Lake-I, Santook G.P, Block-Ii Under 37Th Constituency,Kalimpong District Under National Disaster Response Fund (Ndrf) And State Disaster Response Fund (Sdrf).
Basic Detail
Tender No NIeT_06 ( 1st Call)/SDRF/SE/KC/GTA/2026-2027
Bidding Type Tender
Location
City Kalimpong
State West Bengal
Key Dates
Publish Date 12 Oct 2026
Submission Date 04 Nov 2026
Open Date 13 Nov 2026
Finance
Tender Value 1.46 Crore
Tender Fee Ref. Documents
EMD 2.92 Lakhs
Exemption Not Available
Document List
6d195a53-3460-4c87-8f7c-505a25b953cb.html
BOQ_5181453.xls
Tendernotice_1.pdf
WBF2911.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 12, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 16 days
Nov 13, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 25 days

Tender Documents

Download All (ZIP) ↓
html

6d195a53-3460-4c87-8f7c-505a25b953cb.html

xls

BOQ_5181453.xls

pdf

Tendernotice_1.pdf

pdf

WBF2911.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender