Tender For Periodical Services To External/Internal Surfaces Including Connecting B/R Works To Bldgs At Ch (Cc), Base Hosp, Cmdc, Echs, Soi, Surya Auditorium, Punnit Dutt Auditorium, College Of Nursing And Other Area Of Age E/M (Hosp) Under Ge E/M Lu
Tender Overview
Project Description
Tender for Periodical Services To External/Internal Surfaces Including Connecting B/R Works To Bldgs At Ch (Cc), Base Hosp, Cmdc, Echs, Soi, Surya Auditorium, Punnit Dutt Auditorium, College Of Nursing And Other Area Of Age E/M (Hosp) Under Ge E/M Lucknow.
BOQ
| Sl. No. | Item Description |
| 1 | M&L for Preparation of Old decorated surfaces of wall including applying two coats of white wash complete all as specified and as directed.Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances. (iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 2 | M&L for Preparation of Old decorated surfaces of ceiling and applying one coat of white wash complete all as specified and as directed. Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 3 | M&L for applying two coat of cement base paint on old decorated plastered surfaces of walls, sides and soffits of beams, fascia's, parapets etc paint over a coat of alkali resistant primer after cleaning, scrubbing including preparation of old surfaces,complete all as specified and as directed. Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) Second coat will only be carried out after 12 Hrs of first coat.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 4 | M&L for Preparation of old decorated surfaces of walls, pillars, cornices etc. including removal of nails & filling nail hole with putty and applying one coat of oil emulsion distemper, complete all as specified and directed.Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 5 | M&L for Preparation of old decorated surfaces of ceiling, cornices etc. and applying one coat of oil emulsion distemper complete all as specified and directed.Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 6 | M&L for complete removal of existing treatment of walls pillars, cornices etc, preparation of surface and applying two coats of oil emulsion distemper over 2mm thick layer of wall putty to give uniform surface complete all as specified and directed.Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) Second coat will only be carried out after 12 Hrs of first coat.(iv) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 7 | M&L for Preparation of old decorated surfaces of walls, pillars, cornices etc. including removal of nails & filling nail hole with putty and applying one coat of plastic emulsion paint interior grade complete all as specified and directed by Engineer-in-charge. Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 8 | M&L for complete removal of existing treatment of walls pillars, cornices etc, preparation of surface and applying two coats of plastic emulsion paint interior grade, over one coat of primer over 2 mm thick layer of wall putty to give uniform surface complete all as specified and directed.Note:-(i) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge for working up to 25 mtrs height (ii) No jhoola is permitted for the work under any circumstances.(iii) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 9 | M&L for preparation of old painted steel surface of any description not other wise described over 10cm width or girth and applying one coat of synthetic enamel paint complete all as specified and as directed. Note:- During painting of window/door (steel) window glass pane and floor/wall covered with polytheen/ tarpaulin sheet /HDPE cover without any extra charge. |
| 10 | M&L for preparation of old painted wood or wood based surface of any description not other wise described over 10cm width or girth including knotting and stopping and applying one coat of synthetic enamel paint (1st grade), complete all as specified and as directed.Note:- During painting of window/door (wooden) window glass pane and floor/wall covered with polytheen/ tarpaulin sheet/HDPE cover without any extra charge. |
| 11 | M&L for complete preparation of old plastered or unplaster surfaces of walls by brooming down or steel wire brushing scraping down smoke soot, moulds moss and efflorescent salts, trading oil and greasy spots and applying two coats of 100% Premium acrylic emulsion paint, having VOC less than 50 gm / litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre / 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre / 10 sqm over on putty applied surfaces of walls, primer & paint shall be applied by air less spray machine (Mechanical means),over 2mm thick layer of wall putty to give uniform surface complete all as specified & directed |
| 12 | Note:-(i) Rate included for necessary scaffolding and arrangements for working up to 25 m height and working on any type of roof like AC sheet, Galvalume sheet with necessary safety measures.(ii) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge. (iii) No jhoola is permitted for the work under any circumstances.(iv) Second coat will only be carried out after 12 Hrs of first coat.(v) All work shall be carried out only by an authorised company's authorised applicator.(vi) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 13 | Demolition of brick work or stone / boulder masonry built in cement mortar or cement lime mortar including all quoins, arches, pillars etc but excluding ashlar facings, dressed stone work and pre cast concrete articles complete all as specified and directed. |
| 14 | M&L for Brick work with Fly ash old size brick straight or curved on plan exc 6 m mean radius built in cement mortar 1:6, complete all as specified and as directed.. |
| 15 | M&L for PCC 1:2:4 type B1 using 20 mm graded stone aggregate as in coping, chajja, facia and the like including weathering, slightly rounded or chamfered angles with & including necessary use and waste of form work, complete all as specified & directed. |
| 16 | Taking down cement plaster of any description on brick or stone masonry wall , etc including racking out joints, hacking for key, scrubbing down with water etc, complete all as specified and as directed. |
| 17 | M&L for rendering 15mm thick in cement and sand mortar 1:4 on brick work or cement concrete wall surfaces incl mixing only water proofing compound as per manufacturers instructions and finiching the surface even and smooth without using extra cement complete all as specified. Note:- Waterproofing compound will be measured and paid separately |
| 18 | M&L for Rendering 15 mm thick in cement and sand mortar 1:6 on brick work or cement concrete wall surfaces including finishing the surface even and smooth without using extra cement complete all as specified. |
| 19 | M&L for 5 mm thick rendering in cement and sand mortar 1:3 (as per manufacturers instruction) on ceiling, chajja, roof projection and facia surface finished even and smooth (without using extra cement) complete all as specified and directed. |
| 20 | Supply only water proofing compound of approved quality complete all as specified and directed. |
| 21 | M&L for preparation of new plastered surfaces of walls and two coats of oil emulsion distemper over one coat of primer and 2 mm thick wall care putty complete all as specified and directed. |
| 22 | M&L for preparation of newly plastered surfaces of ceiling and applying three coats of white wash complete all as specified and as directed. |
| 23 | Material & Labour for applying two coats of 100% Premium acrylic emulsion paint, having VOC less than 50 gm / litre and UV resistance as per IS 15489:2004, Alkali & fungal resistance, dirt resistance exterior paint of required shade (Company Depot Tinted) with silicon additives @ 1.43 litre / 10 sqm over and including priming coat of exterior primer applied @ 0.90 litre / 10 sqm over on putty applied new surfaces of walls, primer & paint shall be applied by air less spray machine (Mechanical means),over 2mm thick layer of wall putty to give uniform surface complete all as specified & directed |
| 24 | Note:-(i) Rate included for necessary scaffolding and arrangements for working up to 25 m height and working on any type of roof like AC sheet, Galvalume sheet with necessary safety measures.(ii) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge. (iii) No jhoola is permitted for the work under any circumstances.(iv) Second coat will only be carried out after 12 Hrs of first coat. complete all as specified & directed.(v) All work shall be carried out only by an authorised company's authorised applicator.(vi) The concern executive shall be responsible for ensuring the periodicity period of the building during the execution of the work at the site. |
| 25 | M&L for applying two coats of cement base paint on walls over coat of alkali resistant primer including preparation of newly plastered surfaces,complete all as specified and as directed.Note:-(i) Rate included for necessary scaffolding and arrangements for working up to 25 m height and working on any type of roof like AC sheet, Galvalume sheet with necessary safety measures.(ii) Use of all scaffolding, trestles, ladders, cradles, etc. necessary for execution of work and protective measures without any extra charge. (iii) No jhoola is permitted for the work under any circumstances.(iv) Second coat will only be carried out after 12 Hrs of first coat. complete all as specified & directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 20 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender