Civil Aviation Boards / Undertakings / PSU Closing in 8 days TDR #57968747

Bids Are invited for Cmc Of Ac And Water Cooler

Issued by Boards / Undertakings / PSU · Tuticorin, Tamil Nadu
Tender Value
35.51 Lakhs
Estimated cost
Bid Submission
26 Oct 2026
8 days left
EMD
60198
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tuticorin → Tamil Nadu
EMD Exemption
Available
Quantity
569

Project Description

Bids Are invited for Job Contract For Operation And Day To Day Maintenance Of Acs And Water 1 Skilled And 1Unskilled Manpower Ref Atc Pg.No Soq 1 To3 - Job Contract For Operation And Day To Day Maintenance Of Air Conditioners And Water Coolers, Water Dispensers As Per The List Enclosed In Annexure - A And Annexure B At Thoothukudi Airport By Providing 2 No. Manpower (One Skilled And One Unskilled) In General Shift, As Per The Requirements Indicated In The Tender Document And As Required. , Cmc Of 63 Nos. Of 1.5 Tr Split Type Ac Units Incl Stabilizer At Different Locations As Shown In Annexure-A For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 63 Nos. Of 1.5 Ton Split Type Air Conditioning Units Including Stabilizer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For First Year , Cmc Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Incl. Stabilizer At Different Locations As Shown In Annexure-A For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Including Stabilzer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For First Year , Cmc Of 63 Nos. Of 1.5 Tr Split Type Ac Units Incl Stabilizer At Different Locations As Shown In Annexure-A For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 63 Nos. Of 1.5 Ton Split Type Air Conditioning Units Including Stabilizer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For Second Year , Cmc Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Incl. Stabilizer At Different Locations As Shown In Annexure-A For 2Nd Yearr Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Including Stabilzer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For For Second Year , Dismantling Of 1.5 Or 2.0 Tr Split Ac Units Including Discharging Gas Line, Safe Removal Of Indooror Outdoor Units,Ref Atc Pg.No Soq 1 To 3 - Dismantling Of 1.5 Or 2.0 Tr Split Ac Units Including Discharging Gas Line, Safe Removal Of Indooror Outdoor Units, Transportations To Aai Stores Etc Complete As Required. , Installation Of 1.5 Or 2.0Tr Ac Units Including Fixing Of Indoor And Outdoor Units Ref Atc Pg.No Soq 1 To 3 - Installation Of 1.5 Or 2.0Tr Ac Units Including Fixing Of Indoor And Outdoor Units With Suction And Drainage Line Of 3Mtr Length Drain Line Of 20Mm Pvc Pipe Up To 6Mtr Length Etc., Complete As Required , Providing And Fixing Of 1 Or 2 Inch And 1 Or 4 Inch Copper Pipe Line Ref Atc Pg.No Soq 1 To 3 - Providing And Fixing Of 1 Or 2 Inch And 1 Or 4 Inch Copper Pipe Line Between Indoor Or Outdoor Units Including Form Insulation , Providing And Fixing Of 20 Mm Dia Upvc Or Pvc Drain Pipe For Ac Condensate Drain, Ref Atc Pg.No Soq 1 To3 - Providing And Fixing Of 20 Mm Dia Upvc Or Pvc Drain Pipe For Air-Conditioning Condensate Drain, Including All Necessary Fittings Such As Connection To Existing Drain Point Complete As Required , Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Annexure - B For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Make Crossfield At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph Ro System (Make Blue Mount) At Different Locations As Shown In Annexure - B For First Year For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr 3 Tap Ss Body With 50 Lph Ro System For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr, Three Tap Ss Body With 50 Lph Ro System Make Zero B At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 6 , Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr 3 Tap Ss Body With 25 Lph Ro System For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System ( Make Bluestar ) At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of Bottled Type Water Dispensers For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Contract Of Bluestar Make Normal, Hot, Cold Bottled Type Water Dispensers At Various Locations In Airport Buildings Including Providing All Other Necessary Consumables And Spares Complete As Required As Per Specifications.( Excluding Water Bottle Refilling) , Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Make Crossfield At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr 3 Tap Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph Ro System (Make Blue Mount) At Different Locations As Shown In Annexure - B For Second Year For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr 3 Tap Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr, Three Tap Ss Body With 50 Lph Ro System Make Zero B At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System ( Make Bluestar ) At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of Bottled Type Water Dispensers For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of Bottled Type Water Dispensers At Various Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Quarterly Testing Of Physical And Chemical Parameters Of Water Delivered From Each Water Cooler Ref Atc Pg.No Soq 1 To 3 - Quarterly Testing Of Physical And Chemical Parameters Of Water Delivered From Each Water Cooler Viz. Appearance, Colour, Odour, Turbidity, E.C., Tds, Ph, Alkalanity, Hardness, Ca, Mg, Na, K, Fe, Mn, Nh3, No2, No3, Cl, F, So4, Po4, Tidys Etc. And Bacteriological Parameters Viz. E.Coli Count Examination At Twad Board Or Government Lab And Furnishing The Test Report To Aai As Required.

BOQ

Sl. No. Item TitleItem Description
1Job contract for Operation and day to day maintenance of ACs and Water 1 skilled and 1unskilled manpower Ref ATC Pg.no SOQ 1 to3Job contract for Operation and day to day maintenance of Air conditioners and Water coolers, Water dispensers as per the list enclosed in ANNEXURE - A and ANNEXURE B at Thoothukudi Airport by providing 2 no. Manpower (One Skilled and One Unskilled) in General shift, as per the requirements indicated in the tender document and as required.
2CMC of 63 Nos. of 1.5 TR Split type AC units incl Stabilizer at different locations as shown in Annexure-A For 1st year Ref ATC Pg.no SOQ 1 to 3Comprehensive Maintenance of 63 Nos. of 1.5 Ton Split type Air conditioning units including Stabilizer at different locations as shown in Annexure-A including providing manpower, all necessary consumables and spares complete as required as per specifications. For First year
3CMC of 12 Nos. of 2 Ton Split type Air conditioning units incl. stabilizer at different locations as shown in Annexure-A For 1st year Ref ATC Pg.no SOQ 1 to 3Comprehensive Maintenance of 12 Nos. of 2 Ton Split type Air conditioning units including stabilzer at different locations as shown in Annexure-A including providing manpower, all necessary consumables and spares complete as required as per specifications. For First year
4CMC of 63 Nos. of 1.5 TR Split type AC units incl Stabilizer at different locations as shown in Annexure-A For 2nd Year Ref ATC Pg.no SOQ 1 to 3Comprehensive Maintenance of 63 Nos. of 1.5 Ton Split type Air conditioning units including Stabilizer at different locations as shown in Annexure-A including providing manpower, all necessary consumables and spares complete as required as per specifications. For Second Year
5CMC of 12 Nos. of 2 Ton Split type Air conditioning units incl. stabilizer at different locations as shown in Annexure-A For 2nd Yearr Ref ATC Pg.no SOQ 1 to 3Comprehensive Maintenance of 12 Nos. of 2 Ton Split type Air conditioning units including stabilzer at different locations as shown in Annexure-A including providing manpower, all necessary consumables and spares complete as required as per specifications. For For Second Year
6Dismantling of 1.5 or 2.0 TR split Ac units including discharging gas line, safe removal of indooror outdoor units,Ref ATC Pg.no SOQ 1 to 3Dismantling of 1.5 or 2.0 TR split Ac units including discharging gas line, safe removal of indooror outdoor units, transportations to AAI stores etc complete as required.
7Installation of 1.5 or 2.0TR AC Units including fixing of indoor and outdoor units Ref ATC Pg.no SOQ 1 to 3Installation of 1.5 or 2.0TR AC Units including fixing of indoor and outdoor units with Suction and drainage line of 3mtr length drain line of 20mm pvc pipe up to 6mtr length etc., complete as required
8Providing and fixing of 1 or 2 inch and 1 or 4 inch copper pipe line Ref ATC Pg.no SOQ 1 to 3Providing and fixing of 1 or 2 inch and 1 or 4 inch copper pipe line between indoor or outdoor units including form insulation
9Providing and fixing of 20 mm dia UPVC or PVC drain pipe for AC condensate drain, Ref ATC Pg.no SOQ 1 to3Providing and fixing of 20 mm dia UPVC or PVC drain pipe for air-conditioning condensate drain, including all necessary fittings such as connection to existing drain point complete as required
10CMC of 3 no of 20 40 ltr water cooler SS body with 50 LPH RO system Annexure - B For 1st year Ref ATC Pg.no SOQ 1 to 3CMC of 3 no of 20 40 ltr water cooler SS body with 50 LPH RO system Make Crossfield at different locations as shown in Annexure - B For First year Ref ATC Pg.no SOQ 1 to 4
11CMC of 2 no of Water cooler of capacity 100 Ltr, three tap SS body with 50 LPH 1st year Ref ATC Pg.no SOQ 1 to 3CMC of 2 no of Water cooler of capacity 100 Ltr, three tap SS body with 50 LPH RO system (Make Blue Mount) at different locations as shown in Annexure - B For First Year For First year Ref ATC Pg.no SOQ 1 to 4
12CMC of 1 no of Water cooler of capacity 120 Ltr 3 tap SS body with 50 LPH RO system For 1st year Ref ATC Pg.no SOQ 1 to 3CMC of 1 no of Water cooler of capacity 120 Ltr, three tap SS body with 50 LPH RO system Make Zero B at different locations as shown in Annexure - B For First year Ref ATC Pg.no SOQ 1 to 6
13CMC of 4 no of Water Cooler of capacity 40 Ltr, two tap, SS body with 25 LPH RO system 1st Year Ref ATC Pg.no SOQ 1 to 3CMC of 4 no of Water Cooler of capacity 40 Ltr, two tap, SS body with 25 LPH RO system at different locations as shown in Annexure - B For First Year Ref ATC Pg.no SOQ 1 to 4
14CMC of 1 no of water Cooler of capacity 60 Ltr 3 tap SS body with 25 LPH RO system For 1st Year Ref ATC Pg.no SOQ 1 to 3CMC of 1 no of water Cooler of capacity 60 Ltr, three tap , SS body with 25 LPH RO system ( Make Bluestar ) at different locations as shown in Annexure - B For First Year Ref ATC Pg.no SOQ 1 to 4
15CMC of bottled type water dispensers For 1st Year Ref ATC Pg.no SOQ 1 to 3Comprehensive Maintenance contract of Bluestar make Normal, Hot, Cold bottled type water dispensers at various locations in Airport Buildings including providing all other necessary consumables and spares complete as required as per specifications.( Excluding Water bottle refilling)
16CMC of 3 no of 20 40 ltr water cooler SS body with 50 LPH RO system For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of 3 no of 20 40 ltr water cooler SS body with 50 LPH RO system Make Crossfield at different locations as shown in Annexure - B For Second year Ref ATC Pg.no SOQ 1 to 4
17CMC of 2 no of Water cooler of capacity 100 Ltr 3 tap SS body with 50 LPH RO system For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of 2 no of Water cooler of capacity 100 Ltr, three tap SS body with 50 LPH RO system (Make Blue Mount) at different locations as shown in Annexure - B For Second year For First year Ref ATC Pg.no SOQ 1 to 4
18CMC of 1 no of Water cooler of capacity 120 Ltr 3 tap SS body with 50 LPH RO system For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of 1 no of Water cooler of capacity 120 Ltr, three tap SS body with 50 LPH RO system Make Zero B at different locations as shown in Annexure - B For Second year Ref ATC Pg.no SOQ 1 to 4
19CMC of 4 no of Water Cooler of capacity 40 Ltr, two tap, SS body with 25 LPH RO system For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of 4 no of Water Cooler of capacity 40 Ltr, two tap, SS body with 25 LPH RO system at different locations as shown in Annexure - B For Second year Ref ATC Pg.no SOQ 1 to 4
20CMC of 1 no of water Cooler of capacity 60 Ltr, three tap , SS body with 25 LPH RO system For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of 1 no of water Cooler of capacity 60 Ltr, three tap , SS body with 25 LPH RO system ( Make Bluestar ) at different locations as shown in Annexure - B For Second year Ref ATC Pg.no SOQ 1 to 4
21CMC of bottled type water dispensers For 2nd year Ref ATC Pg.no SOQ 1 to 3CMC of bottled type water dispensers at various different locations as shown in Annexure - B For Second year Ref ATC Pg.no SOQ 1 to 4
22Quarterly testing of Physical and chemical parameters of water delivered from each water cooler Ref ATC Pg.no SOQ 1 to 3Quarterly testing of Physical and chemical parameters of water delivered from each water cooler viz. Appearance, colour, odour, turbidity, E.C., TDS, pH, Alkalanity, hardness, Ca, Mg, Na, K, Fe, Mn, NH3, NO2, NO3, Cl, F, SO4, PO4, Tidys etc. and bacteriological parameters viz. E.Coli Count examination at TWAD Board or Government Lab and furnishing the test report to AAI as required.

AI Tender Summary

OUR REF NO 57968747
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 35.51 Lakhs
LAST DATE 26-10-2026
Authority
Authority Name Airports Authority Of India
Work Description Bids Are invited for Job Contract For Operation And Day To Day Maintenance Of Acs And Water 1 Skilled And 1Unskilled Manpower Ref Atc Pg.No Soq 1 To3 - Job Contract For Operation And Day To Day Maintenance Of Air Conditioners And Water Coolers, Water Dispensers As Per The List Enclosed In Annexure - A And Annexure B At Thoothukudi Airport By Providing 2 No. Manpower (One Skilled And One Unskilled) In General Shift, As Per The Requirements Indicated In The Tender Document And As Required. , Cmc Of 63 Nos. Of 1.5 Tr Split Type Ac Units Incl Stabilizer At Different Locations As Shown In Annexure-A For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 63 Nos. Of 1.5 Ton Split Type Air Conditioning Units Including Stabilizer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For First Year , Cmc Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Incl. Stabilizer At Different Locations As Shown In Annexure-A For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Including Stabilzer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For First Year , Cmc Of 63 Nos. Of 1.5 Tr Split Type Ac Units Incl Stabilizer At Different Locations As Shown In Annexure-A For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 63 Nos. Of 1.5 Ton Split Type Air Conditioning Units Including Stabilizer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For Second Year , Cmc Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Incl. Stabilizer At Different Locations As Shown In Annexure-A For 2Nd Yearr Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Of 12 Nos. Of 2 Ton Split Type Air Conditioning Units Including Stabilzer At Different Locations As Shown In Annexure-A Including Providing Manpower, All Necessary Consumables And Spares Complete As Required As Per Specifications. For For Second Year , Dismantling Of 1.5 Or 2.0 Tr Split Ac Units Including Discharging Gas Line, Safe Removal Of Indooror Outdoor Units,Ref Atc Pg.No Soq 1 To 3 - Dismantling Of 1.5 Or 2.0 Tr Split Ac Units Including Discharging Gas Line, Safe Removal Of Indooror Outdoor Units, Transportations To Aai Stores Etc Complete As Required. , Installation Of 1.5 Or 2.0Tr Ac Units Including Fixing Of Indoor And Outdoor Units Ref Atc Pg.No Soq 1 To 3 - Installation Of 1.5 Or 2.0Tr Ac Units Including Fixing Of Indoor And Outdoor Units With Suction And Drainage Line Of 3Mtr Length Drain Line Of 20Mm Pvc Pipe Up To 6Mtr Length Etc., Complete As Required , Providing And Fixing Of 1 Or 2 Inch And 1 Or 4 Inch Copper Pipe Line Ref Atc Pg.No Soq 1 To 3 - Providing And Fixing Of 1 Or 2 Inch And 1 Or 4 Inch Copper Pipe Line Between Indoor Or Outdoor Units Including Form Insulation , Providing And Fixing Of 20 Mm Dia Upvc Or Pvc Drain Pipe For Ac Condensate Drain, Ref Atc Pg.No Soq 1 To3 - Providing And Fixing Of 20 Mm Dia Upvc Or Pvc Drain Pipe For Air-Conditioning Condensate Drain, Including All Necessary Fittings Such As Connection To Existing Drain Point Complete As Required , Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Annexure - B For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Make Crossfield At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph Ro System (Make Blue Mount) At Different Locations As Shown In Annexure - B For First Year For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr 3 Tap Ss Body With 50 Lph Ro System For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr, Three Tap Ss Body With 50 Lph Ro System Make Zero B At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 6 , Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr 3 Tap Ss Body With 25 Lph Ro System For 1St Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System ( Make Bluestar ) At Different Locations As Shown In Annexure - B For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of Bottled Type Water Dispensers For 1St Year Ref Atc Pg.No Soq 1 To 3 - Comprehensive Maintenance Contract Of Bluestar Make Normal, Hot, Cold Bottled Type Water Dispensers At Various Locations In Airport Buildings Including Providing All Other Necessary Consumables And Spares Complete As Required As Per Specifications.( Excluding Water Bottle Refilling) , Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 3 No Of 20 40 Ltr Water Cooler Ss Body With 50 Lph Ro System Make Crossfield At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr 3 Tap Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 2 No Of Water Cooler Of Capacity 100 Ltr, Three Tap Ss Body With 50 Lph Ro System (Make Blue Mount) At Different Locations As Shown In Annexure - B For Second Year For First Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr 3 Tap Ss Body With 50 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 120 Ltr, Three Tap Ss Body With 50 Lph Ro System Make Zero B At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 4 No Of Water Cooler Of Capacity 40 Ltr, Two Tap, Ss Body With 25 Lph Ro System At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of 1 No Of Water Cooler Of Capacity 60 Ltr, Three Tap , Ss Body With 25 Lph Ro System ( Make Bluestar ) At Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Cmc Of Bottled Type Water Dispensers For 2Nd Year Ref Atc Pg.No Soq 1 To 3 - Cmc Of Bottled Type Water Dispensers At Various Different Locations As Shown In Annexure - B For Second Year Ref Atc Pg.No Soq 1 To 4 , Quarterly Testing Of Physical And Chemical Parameters Of Water Delivered From Each Water Cooler Ref Atc Pg.No Soq 1 To 3 - Quarterly Testing Of Physical And Chemical Parameters Of Water Delivered From Each Water Cooler Viz. Appearance, Colour, Odour, Turbidity, E.C., Tds, Ph, Alkalanity, Hardness, Ca, Mg, Na, K, Fe, Mn, Nh3, No2, No3, Cl, F, So4, Po4, Tidys Etc. And Bacteriological Parameters Viz. E.Coli Count Examination At Twad Board Or Government Lab And Furnishing The Test Report To Aai As Required.
Basic Detail
Tender No GEM/2026/B/8142152
Bidding Type Tender
Location
City Tuticorin
State Tamil Nadu
Key Dates
Publish Date 10 Oct 2026
Submission Date 26 Oct 2026
Open Date 27 Oct 2026
Finance
Tender Value 35.51 Lakhs
Tender Fee Ref. Documents
EMD 60198
Exemption Available
Document List
390819b8-661d-4cb6-95aa-e9f7341f97df.pdf
soq_2026-10-09-19-21-23_b208076150d527d3bb740e9d54c073bd.pdf
10013683_Boq_1.xlsx
ATC_430375d8-3abd-4655-90331791556454401_votk_elect_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 10, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 26, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Oct 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 9 days

Tender Documents

Download All (ZIP) ↓
pdf

390819b8-661d-4cb6-95aa-e9f7341f97df.pdf

pdf

soq_2026-10-09-19-21-23_b208076150d527d3bb740e9d54c073bd.pdf

xlsx

10013683_Boq_1.xlsx

pdf

ATC_430375d8-3abd-4655-90331791556454401_votk_elect_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender