Tender For Providing And Installation Of Electro-Mechanical Equipments And Allied Works At Glr Of Diara , Zone -Ii Piped Water Supply Scheme, Block: Bagda , Dist. 24Pgs(N) Under Emd, Phe Dte.
Tender Overview
Project Description
Tender for Providing And Installation Of Electro-Mechanical Equipments And Allied Works At Glr Of Diara , Zone -Ii Piped Water Supply Scheme, Block: Bagda , Dist. 24Pgs(N) Under Emd, Phe Dte.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 28-Oct-2026 | Date Corrigendum | Date | 20-Nov-2026 |
| 2 | 09-Oct-2026 | CORRIGENDUM | Other | 20-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply and delivery at site of Openwell Submersible pumping machinery having capacity 23.5 LPS against a total head of 24 mtrs, coupled with suitable rating motor suitable for 3 Ph, 415V± 10%, 50 Hz 2900 rpm, IP-68 enclosure, with Class ‘B’ insulation. Make:- Pump-Kirloskar/Mather & Platt/WPIL/Any other approved make. Motor- Crompton Greaves / Kirloskar/ KEC/ABB/Marathon/Any other approved make.[ Test Certificates, Characteristic Curve, Guarantee Certificates should be submitted at the time of delivery] |
| 2 | Supply, delivery and storage at site of CI doble flanged single door swing check 100 mm dia N.R.V as per IS : 5312, Part-I, PN-1.0 .(AT DELIVERY SIDE OF PUMP) |
| 3 | Supply, delivery and storage at site of 100 mm dia CIDF Non rising spindle sluice valve PN-1.0 a per relavent IS. (AT Indivisual DELIVERY OF PUMP) |
| 4 | Supply, delivery and storage at site of 100 mm dia double flanged Cast Iron manually operated non-rising spindle sluice valve generally conforming toIS:14846 PN-1.0. (AT COMMON DELIVERY HEADER ) |
| 5 | Supply, Delivery and Storage at site of MS Dismantling Joint DN 100 mm PN 1.0 (for Delivery side & common header of pump ) |
| 6 | Supply, Delivery and Storage at site of Bourdon type pressure 150 mm dia cast Aluminium Dial with , SS internal, DN 15 GI impulse line with three way cock. A) Pressure Guages (0 - 7 kg/cm2) |
| 7 | Supply, Delivery and Storage at site of 100 mm dia , thickness 5.4mm thick MS Black Pipe conforming to IS:1239 (Part-I)(For Delivery line) along with necessary Bends. |
| 8 | Installation of all items as mentioned in Sl.No.1 to 7 including construction of Pump foundations, pipe supports, valve supports, including supply of all erection items viz. rubber gaskets, nuts & bolts,flange etc., including cost of welding etc. as required for complete installation upto entire satisfaction of EIC. |
| 9 | Supply, Delivery and Storage at Site 2 mm. thick CRCA Sheet Steel Enclosed Cubical type Indoor wall Mounted 415 Volt MCC Panel(12.5HP) having following specification:-Incommer : i) FP MCCB with O/L , S/C Protection(100Amps,25KA)- 01 no. ii) Digital Ammeter -------------- 01 no. iii) Ammeter Selector Switch---------------- 01 no iv) C.T for Ammeter (100 : 5)-------------- 03 nos. v) Digital Voltmeter---------------- 01 no. |
| 10 | vi) Voltmeter Selector Switch,--------01 no. vii) SP MCB for voltmeter (6 Amp) ------- 03 nos. viii)Phase Indicating Lamp ------- 03 nos. ix Voltage monitoring relay.....01No.x) Voltage trip Indicator.........01Noxi) Surge protection Device----01No. xii)TPN MCB (25A ,10Ka)....01No. xiii) Auto Phase Reversal Correction Device---- 01 no. |
| 11 | Outgoing: i) MPCB (16-20Amps)------------- 02 no. ii) Motor Protection Relay(0.5-80)A..........02 no. iii) Contractor (25 Amp)-------------------- 04 no. iv) Contractor (18 Amp)-------------------- 02 no. v)Capacitor (4 KVAR)--------------------- 02 no. vi)Contactor for capacitor(9 Amps)----------- 02 no. vii)TP MCB for capacitor (16 Amps) --------------- 02no. |
| 12 | viii)Star-Delta Timer (3-60 Sec) ----------- 02 no. ix)On-Delay timer ....02Nos x) SP MCB (6 Amp) --------- 02 no. xi)ON/OFF/Trip Indicator -------- 06 nos xii) Start/Stop Push Button--------- 02nos. |
| 13 | For Chlorinator: i) TP MCB (16 Amp) -----01no. ii) Over Load Relay (0.63 - 1 Amp) ----01 no. iii) Contactor(9Amp) ------01 no. iv) Water Level Controller ------- 01 no. v) ON/OFF/Trip Indicator ------ 03 nos. vi)Start/Stop Push Buttom------- 02 nos. |
| 14 | For Spare Feeder: i) TP MCB ( 16 Amp)---------- 02 no. |
| 15 | For Yard Light : i) TP MCB 16A--------- 01 no.ii) Contactor(18Amp) ------01 no. iii) 24Hrs Clock Timer........01 No.iv) ON Indicator(Green).........01No.v) ON/OFF/On Toggle Switch(10A)......01No.vi_ 6A SP MCB............01No. |
| 16 | Installation of the above Panel on as in item no. 9 wall with complete cable connection as per direction supplying all required materials and commissioning the same as per satisfaction of E.I.C |
| 17 | Supply & delivery at site of 100 Amp TPN Rewire able type switch fuse.( Make Havells/ GEC/ Standard/any other approved make) |
| 18 | Supply & delivery at site of 100Amps wall mounted 4-way Bus-Bar chamber having 4nos. Copper bus-bar.( Make Havells/ L&T/ Standard/any other approved make) |
| 19 | Supply & delivery at site of 100 Amp kit kat rewireable.( Make Havells/ L&T/ Standard/any other approved make) |
| 20 | Supply & delivery at site of 100 Amp. 4 pole on load change over switch. ( Make Havells/ Standard/any other approved make) |
| 21 | Supply & delivery at site of 25 Sq. mm. 1.1 KV grade 3 1/2 core Al. conductor armoured P.V.C. /XLPE insulated cable. NB: Cable to be supplied as per sire requirement.( Make: GLOSTER/NICCO/Polycab / Havell’s/Mescab/any other approved make) |
| 22 | Supply, Delivery at site of 2.5 Sq. mm. 3 core water proof flat copper submersible cable as per Relevant IS.NB: Cable to be supplied as per sire requirement.( Make: GLOSTER/NICCO/Polycab / Havell’s/Mescab/any other approved make) |
| 23 | Supply & delivery at site of 20 KVA 3-phase oil cooled type Servo Motor operated copper would line voltage Corrector conforming to IS-9815 (Pt.1)-1994 suitable for unbalanced input and unbalanced load voltage with following specification including first filling oil as per IS-335 where applicable[Make- Eltek/Sen & Pandit/Fiji/ECS/Digitek/OPTP/Any other approve make) Input Voltage: 3 Phase Main supply may or may not be balanced with respect to phase to phase 250V- 500V and Phase to neutral 144V-289V.Output Voltage: 3 Phase balanced output phase to phase 415±1% phase to neutral 240 V±1% and as per NIT Specification. |
| 24 | Installation of the above Voltage Stabilizer on the floor making suitable foundation by supplying all required materials and commissioning the same as per direction of E.I.C. |
| 25 | Fitting, fixing of main switch & bus-bar as in item no. 11 to 14 on flat iron frame/angle iron frame on wall by supplying all necessary fixing materials including welding all complete as per direction. |
| 26 | Laying of cable on wall/surface including S&F of MS saddles with earthing attachment in 10 SWG GI(HOT DIP) wire making holes etc. as necessary mending good damages and paint all complete. i) 25 Sq. mm. 1.1 KV grade 3 1/2 core. |
| 27 | ii) 2.5 Sq. mm. 3 core water proof flat copper submersible cable . |
| 28 | Finishing the end of cable by crimping method including supplying of suitable size Al. thimble, tapes, jointing materials & supplying and fixing suitable type compression gland for above cable including supply of brass gland, rubber ring etc. i) 25 Sq. mm. 1.1 KV grade 3 1/2 core. |
| 29 | ii) 2.5 Sq. mm. 3 core water proof flat copper submersible cable . |
| 30 | Earthing with 50mm dia. G.I. pipe 3.64mm thick x 3Mtr.(10ft.) long and 1 x 4SWG G.I. wire(4Mtr. long) 13mm diametre x 80mm (3inch) long G.I. Bolts, double nuts, washer including S & F 15mm diametre G.I. pipe protection(1Mtr. Long) to be filled with bitumen partly below ground level to an average depth of 3.65Mtr.(12ft.) below the ground level and restoring the surface duly rammed.[This cost includes earth pit and its necessary lid making] |
| 31 | Extra for treatment of soil by salt and charcoal coke for pipe electrode. |
| 32 | Connecting the equipments body to earth busbar including S &F 25 mm x 6 mm galvanised (Hot Dip) MS flat on wall/floorwith GI saddles as required and connection to equipments incl.drilling holes, with bolts, nuts, washers etc. |
| 33 | Brick work around the earth pits, neat cement finishing, supply & fitting fixing of MS cover plates above the earth pits all complete as per satisfaction of E.I.C. |
| 34 | Making internal/external electrification of P/House by 2 x 1.5 sq.mm. P.V.C. cu wire through suitable size casing/capping for 4 nos. point ( 1 no. bracketpoint , 1 no. tube light point , 1 nos. bulk head point and 1 fan point ) and 1 no. 5A ,5 pin plug point with earthing attachment of 1 x 1.5 sqmm cu. Wire with supplying of tube light fittings , bulbs & 1200mm sweep celling fan(Make-As per approved vendor list.) as per approved make including suppying and fixing 10 A. DP MCB (As per approved vendor list.) make on wall all complete as per I.E. rules and direction. (including making external illumination by Supply & fixing of 1 no. 40W LED IP 66 type outdoor luminairie incl. Supply & installation of MS bracket & connection complete) (Make : As per Approved VendorList.) |
| 35 | Supply & delivery at site of automatically controlled plunger type chlorinator Dosing pump ( Make:Swelore / Positive/any other approved make) with Flow Rate 100 LPH and Max pressure of 10Kg/Cm2 with necessary accessories with storage Tank of dosing solution of 100 Ltr. Capacity and the prime mover to be coupled with pump of 0.5HP 3 Phase suitable RPM squirrel cage TFC induction Motor Complete set. (Make:- KEC/CGL /any other approved make) |
| 36 | Installation & commissioning of above supplied chlorinator & drawing of power line by supplying of necessary wire and continuous earthing connected to auto/manual panel.This includes the cost of making necessary brick foundation base with neat cement finish by supplying all required materials and testing the entire set as per direction of E.I.C. |
| 37 | Painting of the installation (viz. pumps,valves, pipe lines etc. by two coats of epoxy paint (colour to be decided by EIC) over a coat of primer as per NIT specifiaction & direction of EIC |
| 38 | Testing & Commissioning of the entire installation i.e. Pumps, Motors,valves ,panel , voltage stabilizer etc. as per direction and to the entire satisfaction of E.I.C. |
| 39 | Operation and maintenance of the entire installation in High lift pumping stations including guarding for a period of 90 days are to be provided with supply of skilled, semi-skilled and un-skilled personnel including watch and ward personnel from the date of commissioning. |
| 40 | Add: GST @ 18% |
| 41 | Add: LWC @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 18 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 23 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender