Howrah Division - Supply, Installation, Commissioning and Operation of Track Based Rail Lubricator(Electronic Type of 1 KM Category) along with Supply of Lubricant for RailLubricator as per site requirement with a minimum of 20Kg per month perLubrica
Tender Overview
Project Description
Tender for Howrah Division - Supply, Installation, Commissioning And Operation Of Track Based Rail Lubricator(Electronic Type Of 1 Km Category) Along With Supply Of Lubricant For Raillubricator As Per Site Requirement With A Minimum Of 20Kg Per Month Perlubricator. Complete System Should Be As Per Rdso Technical Specification Irs T48 (Vers. 5 Of Latest) For 5 Years Under The Jurisdiction Of Hwh Division ( Total -49 Nos.) , - Supply, Installation And Commissioning Of Track Based Rail Lubricator (Electronic Type) With Dual Applicator / Wiper Bar Complete System As Per Rdsos Technical Specification No.Irs- T-48 Version 5. Supply Of Solar Panel And Its Accessories Including Battery And Mast For Successful Operation Of Lubricator. The Firm Has To Inspect Each Location Regularly For Operation And Maintenance Not Less Than 15 Days For Each Curve. Power Supply : Application System Should Be Designed To Accomodate Both Direct Electrical Connection To An Ac Power Source And To Operate Independently Using A Solar Panel And Battery As Per Para 7.2 Of Rdso Technical Specification For Track Based Lubricator. The Rate Includes All Tools, Plants, Parts, Labour, Taxes, Transportation, Royalty Etc., Complete Job. The Rate Also Includes The Cost Of Parts And Amc For 5 Years. The Machine And The Solar Panel Assembly Will Be The Property Of The Contractor, Which Will Be Taken Back By Contractor After Successful Completion Of Job (I.E. After 5 Years). The Rate Also Includes The Testing Of Grease For Its Suitability As Per Rdso Specification (I.E. Testing The Grease For Its Co-Efficient Of Friction Which Should Be Less Than 0.25 Μ) Shall Be Done By The Tenderer At A Frequency Of 1 Month. Note : (1) If The Co- Efficient Of Friction In Above Test Is Found Above 0.25Μ, Then No Payment For That Month Will Be Done By Railway. (2) Unit Is Each Month. (Qty=49 Lubricators X60 Months= 2940 Nos.) , - Supply Of Grease For 5 Years As Per Specification Of Lubricant Vide Rdso Technical Specification No.Irs-T-48 Version 2 For Track Based Lubricator (June 2013). Note : (1) If The Co- Efficient Of Friction In Test Is Found Above 0.25Μ, Then No Payment For Supply Of Grease For That Month Will Be Done By Railway. (2) Consumption Of Grease 20 Kg Per Curve Per Month. Unit =Kg/Curve
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender