Tender For Repair/Maint Of Vt Turbine Pumps, Centrifugal Pumps, Submersible Pumps, Ch Plants, Motor Starters, Panels,Cleaning Of Water Oh/Ug Storage Tank, Sewage Well, Jack Well Flocculator Tank, Sedimentation Tank And Washing Cleaning Of Rapid Sand
Tender Overview
Project Description
Tender for Repair/Maint Of Vt Turbine Pumps, Centrifugal Pumps, Submersible Pumps, Ch Plants, Motor Starters, Panels,Cleaning Of Water Oh/Ug Storage Tank, Sewage Well, Jack Well Flocculator Tank, Sedimentation Tank And Washing Cleaning Of Rapid Sand Gravity Filter Incl Comprehensive Maintenance Of Water Supply Scada System At Baiaragarh Under Ge Bhopal
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 13-Oct-2026 | Revised BOQ | BOQ | 30-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Note :(i) Please refer Sch A/ BOQ Notes before quoting the tender for all phases/ items mentioned below.(ii) Amount of Schedule of credit shall be deducted offline |
| 2 | Disconnecting/ Dismentling of submersible openwell type/ centrigual / Monoblock / Pressure Pump / Non Clog motor Pump/ VT Pump/ open well pump Set assy from its foundation at various place of Bairagarh pump house and transporting to civil workshop for Servicing and repairing complete and taking back after repairing, fixing to its existing position and making all connections for 75 HP VT pump. Dismantling and opening of pump assy for checking out defects. Taking out shaft and worn out impellor, checking for trueness machining, grinding, polishing and refixing for its smooth functioning and balancing. |
| 3 | All as per item No 1.10 here-in before but for 60 HP to 75 HP |
| 4 | All as per item No 1.10 here-in before but for 10 HP to 25 HP |
| 5 | All as per item No 1.10 here-in before but for 5 HP to 7.5 HP |
| 6 | All as per item No 1.10 here-in before but for 1 HP to 3 HP.Notes for ser Item Nos 1.1 to 5.00:- (1) Chain pully block and clamps etc to be provided by the contractor. (2) Necessary safety pracaution while handling and carrying out work will be responsibility of the contractor.(3) Spare Parts i.e. Bowl bush, Neck ring, Coupling key, stud with nut bolts, Lower Housing bush, upper housing bush, rotor shaft sleeve, shaft sleeve, Drain plug, gland packing, water seal, cooling fan, shaft alignment, star bush etc , T&P for gas cutting etc are included in the item rate. The spare parts not included in the item rate shall be paid and measured seperately.(a) Item rate includes troubleshooting and finding of fault of motors/pumps installed at Pump Houses/Swimming pool/Sewage Pumps located in Bairagarh Military station.(b) Breakdown of motors/pumps shall be informed to contractor through any media. Hence contractor will provide one Contact person and his mobile no which should be available 24X7 to address the breakdown etc. To attend break down maintenance immediately and replacement of unservicable spare parts within 24 hours as required at site as directed by AGE/JE. If the contractor fails to rectify the complaint within 12 hours, contractor shall pay penalty charges as are under:-(a) Upto 1st working day - Rs 500.00/per Day/per motor/pump(b) Above 1 working day and upto 02 Working day - Rs 700.00/per Day/per motor/pump(c) Above 02 Working day - Rs 1000.00 /per Day/per motor/pump. |
| 7 | Taking out submersible pump from borwell of any type and capacity upto 15 HP alongwith column pipe and 3 core flat cable complete after disconnecting of all electric and water line connection for any make of pump & motor up to 250mtr complete all as specified and directed NOTE: (1) Chain pully block and clamps etc shall be provided by the contractor. (2) Necessary safety pracaution will be responsibility of the contractor. |
| 8 | Lowering down of submersible pump of any type and capacity upto 155 HP alongwith UPVC column pipe and 3 core flat cable complete including (rethreading to GI pipe if required) and reconnecting of all electric and water line connection for any make of pump & motor up to 250mtr complete all as specified and directed.Note: Column pipe and Submersible cable measured and paid seperately. |
| 9 | Supply and fixing in repair, flexible flat XLPE insulated PVC sheathed copper couductor stranded submersible cable 1100 volt grade 6 Sqmm 3 core ISI marked including jointing material and connection work complete all as specified and directed. |
| 10 | Supply and fixing in repair, flexible flat XLPE insulated PVC sheathed copper couductor stranded submersible cable 1100 volt grade 4 Sqmm 3 core ISI marked including jointing material and connection work complete all as specified and directed. |
| 11 | S&F round Nylon rope dia 10mm and connected clamp nut bolts fixed , complete all as specified and as directed. |
| 12 | Taking out unserviceable spares and burnt copper winding wire of 1 HP to 30 HP Motor complete. M&L for rewinding of submersible motor / open well motor with insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing & transport charges complete all as specified & directed by EIC.Note: Parts for following items shall be paid under relevent item here-in-after under as supply. |
| 13 | Taking out unserviceable spares and burnt copper winding wire complete 1 HP to 75 HP Motor. M&L for rewinding of VT Pump/Centrifugal/monoblock/pressure pump/Non clog motor pump set with super enamelled insulated copper winding wire including sleeves as per original company and replacement of worn out parts, including grinding & polishing of rotor sleeves and refixing, testing & transport charges complete all as specified & directed by EIC.Note: Parts for following items shall be paid under relevent item here-in-after under as supply. |
| 14 | Supply and fix coupling suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 15 | Supply and fix Impeller suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 16 | Supply and fix Bearing suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 17 | Supply and fix Mechanical seal suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 18 | Supply and fix Rotor shaft suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 19 | Supply and fix CI Bowl suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump for capacity between 60 HP to 75 HP of original company as approved by Engineer-in-charge. Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor. |
| 20 | Supply and fix coupling suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 21 | Supply and fix impeller suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 22 | Supply and fix bearing suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 23 | Supply and fix mechnical seal suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 24 | Supply and fix rotor shaft suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 25 | Supply and fix CI Bowlt suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity above 10 HP to 25 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 26 | Supply and fix coupling suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 27 | Supply and fix impeller suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- unserviceabl Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 28 | Supply and fix bearing suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 29 | Supply and fix mechanical seal suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 30 | Supply and fix rotor shaft suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceabl Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 31 | Supply and fix CI bowl suitable for existing Pump of the centrigual /Monoblock / Pressure Pump/Non clog pumpset and motor/VT Pump/Submersible pump for capacity between 1 HP to 10 HP of original company as approved by Engineer-in-charge. (Note :- Unserviceable Part other than as listed below of Pump if required to be replaced to make the pump functional is to be replaced by contractor. No extra payment shall be paid to contractor.) |
| 32 | M&L for Shifting of Centrifugal Motor and Pumpset of capaicty 60 to 75 HP-02 Nos alongwith its all connected accessories from MFPH to 1 TB Pump House inlcuding dismantling from the existing place and installation at 1 TB pump house, including PCC foundation as per Manufacturer recommendations , alignment of motors and pumps, servicing and repairing of Motors including repalcement of worn out parts, i.e. Coupling key, stud with nut bolts, Lower Housing bush, upper housing bush, rotor shaft sleeve, shaft sleeve, Drain plug, gland packing, water seal, cooling fan, shaft alignment, star bush etc. connection of existing system with Scada panel etc.Note- Cost of transportation is inlcuded in the item rate. |
| 33 | M&L for Shifting of Centrifugal Motor and Pumpset of capacity 20 to 25 HP -02 Nos alongwith its all connected accessories from 1 TB Pump house to MFPH/ MES Colony Pump House inlcuding dismantling from the existing place and installation at MFPH/MES Colony pump house, including PCC foundation as per Manufacturer recommendations , alignment of motors and pumps, servicing and repairing of Motors including repalcement of worn out parts, i.e. Coupling key, stud with nut bolts, Lower Housing bush, upper housing bush, rotor shaft sleeve, shaft sleeve, Drain plug, gland packing, water seal, cooling fan, shaft alignment, star bush etc. connection of existing system with Scada panel etc.Note- Cost of transportation is inlcuded in the item rate. |
| 34 | Servicing/repair maintenace of Motor Control panels /VT pump Control Panel/Sewage Pump Control Panel/Centrifugal pump Motor Control Panel/Submersible Motor Control Panel etc complete all as specified and directed:-Scope of work shall be comprising following activities:-(a) Troubleshooting and finding of fault of control panel installed at Pump House etc, Servicing and maintenace/repairs and replacement of defective components/ spare parts of control panels including checking of all accessories contactors, timers, relays VMR etc. installed at Pump Houses/Swimming pool/Sewage Pumps.(b) To attend break down maintenance immediately and replacement of unservicable spare parts within 24 hours as required at site as directed by AGE/JE.(c) All minor components/spare parts replaced included in this item i.e. Indicator Lamps(RYB), On- Off-Trip indicators, Start -Stop Push Buttons, welding of broken Doors etc connector/Copper Lugs/ Aluminium Lugs/ Nut Bolt etc / reconnecting burnt Cable connections etc and its cost deemed to be included in the unit rate quoted in item. (d) Breakdown of Control Panels shall be informed to contractor through any media. Hence contractor will provide one Contact person and his mobile no which should be available 24X7 to address the breakdown etc. To attend break down maintenance immediately and replacement of unservicable spare parts within 24 hours as required at site as directed by AGE/JE. If the contractor fails to rectify the complaint within 12 hours, contractor shall pay penalty charges are as under:-(i) Upto 1st working day - Rs 500.00/per Day/per Motor control panel(ii) Above 1 working day and upto 02 Working day - Rs 700.00/per Day/per Motor control panel(iii) Above 02 Working day - Rs 1000.00 /per Day/per Motor control panel |
| 35 | S&F FRLS PVC Insulated 10 Sqmm Single Core Unsheathed Industrial Flexible Cable conforming to IS 694:2010 with Bright Annealed Copper Conductor for Voltage Grade 1100 Volts of following sizes including taking down existing one and saddling wherever required and replacement of copper lugs complete all as specified and directed. |
| 36 | S&F FRLS PVC Insulated 16 Sqmm Single Core Unsheathed Industrial Flexible Cable conforming to IS 694:2010 with Bright Annealed Copper Conductor for Voltage Grade 1100 Volts of following sizes including taking down existing one and saddling wherever required and replacement of copper lugs complete all as specified and directed. |
| 37 | S&F FRLS PVC Insulated 25 Sqmm Single Core Unsheathed Industrial Flexible Cable conforming to IS 694:2010 with Bright Annealed Copper Conductor for Voltage Grade 1100 Volts of following sizes including taking down existing one and saddling wherever required and replacement of copper lugs complete all as specified and directed. |
| 38 | S&F FRLS PVC Insulated 35 Sqmm Single Core Unsheathed Industrial Flexible Cable conforming to IS 694:2010 with Bright Annealed Copper Conductor for Voltage Grade 1100 Volts of following sizes including taking down existing one and saddling wherever required and replacement of copper lugs complete all as specified and directed. |
| 39 | S&F FRLS PVC Insulated 50 Sqmm Single Core Unsheathed Industrial Flexible Cable conforming to IS 694:2010 with Bright Annealed Copper Conductor for Voltage Grade 1100 Volts of following sizes including taking down existing one and saddling wherever required and replacement of copper lugs complete all as specified and directed. |
| 40 | Taking out old MCCB and its connected cable & S&F in replacement of MCCB 4 pole, 100 Amp 25 kA breaking capacity, Thermal - Magnetic Release, Conforms to IS/IEC 60947-2, Ics= 100% of Icu, Adjustable overload settings: 0.8 - 1.0 x In, Fixed short-circuit settings: 10 x In, Manual version including spreader links, phase barriers suitable size of copper lugs and connected fittings, including reconnection of existing cable etc complete all as specified and directed. Make-L&T Cat Part No DZ0F0100CXC1AOOOO/Legrand/ABB |
| 41 | Taking out old MCCB and its connected cable & S&F in replacement of MCCB 4 pole, 125 Amp 25 kA breaking capacity, Conforms to IS/IEC 60947-2, Thermal - Magnetic Release, Ics= 100% of Icu, Adjustable overload settings: 0.8 - 1.0 x In, Fixed short-circuit settings: 10 x In, Manual version including spreader links, phase barriers suitable size of copper lugs and connected fittings, including reconnection of existing cable etc complete all as specified and directed. Make-L&T Cat Part No DZ0F0100CXC1AOOOO/Legrand/ABB |
| 42 | Supply and fix in replacement of Ultrasonic Level Transmitter at Sump and overhead tank for measurement of level with following specification:- Range : 0-8 meters Accuracy : 0.5 % minimum Supply Voltage : 24V DC Output : 4-20 mA , 0-10V DC Make: Pepperl+ Fuchs / Nivelco / Siemens/Banner |
| 43 | Supply, Installation, Testing, Commissioning and Programming of Metal Reflector Parabolic antenna with control station to generate strong directional effect with WLAN network support having mast mounting arrangment. Control station should operate on license free frequency with necessary hardware at a suitable location to be connected to the central scada server so as to establish connectivity with every station of the network after conducting a frequency survey of the entire area of interest and identify suitable locations to mount the station hardware and the height of the antennas to establish clear line of sight either directly or by multi hop so as to be able to send data.Antenna type:- Metal Reflector AntennaDegree of protection:- IP65 Mounting type:- Mast mountingThe should have a approval of Wi-Fi compliance, Environmentally Friendly Use Period :- UNLIMITED = EFUP-eNote:-Rate quoted is deemed to be included for making arrangemets of accessories such as mounting bracket and mast clipsMake:- Universal Switch Gear Control |
| 44 | Supply and Fix on Load Manual Changeover Sheet Steel Enclosure 200 Amp, 415V, 4P Conforms to IEC 60947-3 , IS/IEC 60947-3 Suitable for horizontal as well as vertical mounting including dismantling existing one complete all as specified and directed. |
| 45 | M&L for cleaning, disinfection and carefully washing out settled mud, alum, flocculant, etc from sedimentation tank (2 x 1.50 lakh & 1 x 1.25 lakh gallon capacity) of size 19.50m x 9.75m x 4.35m depth internal size of each tank having 2 nos buffer walls of size 15.15m x 0.15m x 4.0m height in each tank; drainning out complete waste water from tank mannually and by mechanical arrangments; cleaning of bottom, all internal side walls, channel using brooms, wiper or nylon brush, sludge removal, high pressure cleaning, anti bactrial spray, UV radiation including scrapping out and applying one coat of super quality lime wash on outer stone wall surface of sedimentation tank writing the date of cleaning on the wall of tank on blue base with white colour; including cleaning of the surrounding area of the tank upto a distance of 3 mtrs from the outer edge of tank by cutting of grass, digging out roots, filling holes with earth, levelling of ground and removing waste material to a distance not exceeding 50m complete all as specified and directed. Note:- 2 x 1.50 lakh & 1 x 1.25 lakh gallon capacity of tanks i.e. 03 Nos shall be cleaned alternate day to avoid complete shut down of water supply system. |
| 46 | M&L for cleaning, disinfection & carefully washing out settled mud, alum, flocculant, etc from FLOCCULATOR TANK of 10 mtr dia & 4.5 mtr depth including external channels, chambers and outlet, etc; drainning out complete waste water from tank mannually or by mechanical arrangments; cleaning of bottom, all internal side walls, channel using brooms, wiper or nylon brush, sludge removal, high pressure cleaning, anti bacterial spray, UV radiation including scrapping out and applying one coat of super quality lime wash on outer stone wall surface and inner surface of floculator tank and wirting the date of cleaning on the wall of tank on blue base with white colour; including cleaning of the surrounding area of the tank upto a distance of 3 mtrs from the outer edge of tank by cutting of grass, digging out roots, filling holes with earth, levelling of ground and removing waste material to a distance not exceeding 50m complete all as specified and directed. |
| 47 | All as per item No. 45.00 here-in-before but for RCC small flocculator 1.5m dia and 3m depth and chemical mixing chambers 1.5mX 1.5m X 1.5m depth 03 Nos, intake chamber complete all as specified and directed. Please Enable Macros to View BoQ information |
| 48 | All as per item No. 45.00 here-in-before but for RCC small flocculator 1.5m dia and 3m depth and chemical mixing chambers 1.5mX 1.5m X 1.5m depth 03 Nos, intake chamber complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 15 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender