Tender For Lot-3 Package: Hydro-Mechanical Works For All Gates And Pressure Shaft Liners For The Implementation Of The 260 Mw Dulhasti Stage-Ii H.E Project, In Kishtwar District Of Ut Of J&K, India

Issued by Boards / Undertakings / PSU · Kishtwar, Jammu and Kashmir
Tender Value
131.23 Crore
Estimated cost
Bid Submission
20 Nov 2026
33 days left
EMD
1.97 Crore
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Kishtwar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Lot-3 Package: Hydro-Mechanical Works For All Gates And Pressure Shaft Liners For The Implementation Of The 260 Mw Dulhasti Stage-Ii H.E Project, In Kishtwar District Of Ut Of J&K, India

BOQ

Name of Work:- Lot-3 Package: Hydro-mechanical Works for All Gates and Pressure Shaft Liners for the implementation of the 260 MW Dulhasti Stage-II H.E Project, in Kishtwar District of UT of J&K, India
Sl. No. Item Description
1Intake Gates & Hydraulic Hoists
2Low Level Intake Gate & Hydraulic Hoist
3Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
4Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
5Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
6Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
7Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
8Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
9Mandatory Spare Parts (As per statement-IB)
10Intermediate Level Intake Gate & Hydraulic Hoist
11Intermediate Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
12Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
13Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
14Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
15Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
16Mandatory Spare Parts (As per statement-IB)
17Upper Level Intake Gate & Hydraulic Hoist
18Upper Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
19Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
20Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
21Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
22Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
23Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
24Mandatory Spare Parts (As per statement-IB)
25Intake Stoplogs & Monorail Hoist:
26Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
27Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
28Mandatory Spare Parts (As per statement-IB)
29Desilting Chamber Inlet Gates & Rope Drum Hoists
30Desilting Chamber Inlet Gate (Fixed wheel type)
31First Stage Embedded Parts for 3.1
32Second Stage Embedded Parts including dogging etc. for 3.1
33Rope Drum Hoist complete in all respect and control equipment for 3.1
34Hoist supporting structure & trestle etc. for 3.4.
35Mandatory Spare Parts (As per statement-IB)
36Desilting Chamber Outlet Gates & EOT Crane
37Desilting Chamber outlet Gate (Slide type)
38First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
39Second Stage Embedded Parts including dogging etc. for 4.1
40EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment..
41Mandatory Spare Parts (As per statement-IB)
42Silt Flushing Tunnel Steel liner
43Silt flushing tunnel steel liner 2.6m diameter
44Silt Flushing Tunnel (Service & Emergency) & Hydraulic Hoists
45Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
46First Stage Embedded Parts for 6.1 with 300mm dia. air-vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
47Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 6.1
48Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 6.3
49Mandatory Spare Parts (As per statement-IB)
50Surge Shaft Gate & Rope Drum Hoist
51Surge Shaft Gate (Fixed wheel type)
52First Stage Embedded Parts with reception frame for 7.1 including air vent pipe (300mm dia.)
53Second Stage Embedded Parts including dogging etc. for 7.1
54Rope drum hoist complete in all respect and control equipment for 7.1 with hydraulic motor and Power Pack
55Hoist supporting structure & trestle etc. for 7.4
56Mandatory Spare Parts (As per statement-IB)
57Pressure Shaft Steel Liner/ Penstock
58Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
59Dia 7.0m circular steel liner of upper horizontal portion
60Dia 7.0m circular steel liner of upper vertical bend (UVB)
61Dia 7.0m circular steel liner of vertical pressure shaft
62Dia 7.0m circular steel liner lower vertical Bend (LVB)
637.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
64Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
65Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
664.0m circular steel liner (extra /matching piece) of length 600mm.
67Draft Tube Gates and Rope Drum Hoists
68Draft Tube Gates (Fixed wheel type)
69First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
70Second Stage Embedded Parts including dogging etc. for 9.1
71Rope Drum Hoist complete in all respect and control equipment etc. for 9.1
72Hoist supporting structure & trestle etc for Draft Tube gates etc. for 9.4
73Mandatory Spare Parts (As per statement-IB)
74Tail Race Gate and Rope Drum Hoist
75Tailrace Tunnel Gate (Fixed wheel type)
76First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 10.1
77Second Stage Embedded Parts including dogging arrangement etc. for 10.1
78Rope drum hoist complete in all respect and control equipment for 10.1
79Hoist supporting structure & trestle etc for Tail Race gate for 10.4
80Mandatory Spare Parts (As per statement 1B)
81Adit Gates
82Adit Gates (Hinge type)
83First Stage Embedded Parts for11.1
84Second Stage Embedded Parts for 11.1
85Instrumentation and Remote Control System
86A). PLC based remote control system complete in all respects as described in GTS/ PTS.B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC systemi. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates).ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates.iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates.iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate.v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate.vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate.C) Main Distribution BoardD) Feeder pillar for all HM equipment.
87Mandatory spare parts (As per Statement 1B)
88Diesel Generator Set
89Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
90Mandatory spare parts (As per Statement 1B)
91Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
92Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
93Mandatory spare parts (As per Statement 1B)
94Mandatory Tools & Tackles (As per statement-1A)
95Intake Gates & Hydraulic Hoists
96Low Level Intake Gate & Hydraulic Hoist
97Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
98Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
99Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
100Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
101Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
102Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
103Mandatory Spare Parts (As per statement-IB)
104Intermediate Level Intake Gate & Hydraulic Hoist
105Intermediate Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
106Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
107Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
108Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
109Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
110Mandatory Spare Parts (As per statement-IB)
111Upper Level Intake Gate & Hydraulic Hoist
112Upper Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
113Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
114Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
115Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
116Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
117Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
118Mandatory Spare Parts (As per statement-IB)
119Intake Stoplogs & Monorail Hoist:
120Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
121Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
122Mandatory Spare Parts (As per statement-IB)
123Desilting Chamber Inlet Gates & Rope Drum Hoists
124Desilting Chamber Inlet Gate (Fixed wheel type)
125First Stage Embedded Parts for 3.1
126Second Stage Embedded Parts including dogging etc. for 3.1
127Rope Drum Hoist complete in all respect and control equipment for 3.1
128Hoist supporting structure & trestle etc. for 3.4.
129Mandatory Spare Parts (As per statement-IB)
130Desilting Chamber Outlet Gates & EOT Crane
131Desilting Chamber outlet Gate (Slide type)
132First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
133Second Stage Embedded Parts including dogging etc. for 4.1
134EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment..
135Mandatory Spare Parts (As per statement-IB)
136Silt Flushing Tunnel Steel liner
137Silt flushing tunnel steel liner 2.6m diameter
138Silt Flushing Tunnel (Service & Emergency) & Hydraulic Hoists
139Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
140First Stage Embedded Parts for 6.1 with 300mm dia. air-vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
141Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 6.1
142Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 6.3
143Mandatory Spare Parts (As per statement-IB)
144Surge Shaft Gate & Rope Drum Hoist
145Surge Shaft Gate (Fixed wheel type)
146First Stage Embedded Parts with reception frame for 7.1 including air vent pipe (300mm dia.)
147Second Stage Embedded Parts including dogging etc. for 7.1
148Rope drum hoist complete in all respect and control equipment for 7.1 with hydraulic motor and Power Pack
149Hoist supporting structure & trestle etc. for 7.4
150Mandatory Spare Parts (As per statement-IB)
151Pressure Shaft Steel Liner/ Penstock
152Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
153Dia 7.0m circular steel liner of upper horizontal portion
154Dia 7.0m circular steel liner of upper vertical bend (UVB)
155Dia 7.0m circular steel liner of vertical pressure shaft
156Dia 7.0m circular steel liner lower vertical Bend (LVB)
1577.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
158Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
159Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
1604.0m circular steel liner (extra /matching piece) of length 600mm.
161Draft Tube Gates and Rope Drum Hoists
162Draft Tube Gates (Fixed wheel type)
163First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
164Second Stage Embedded Parts including dogging etc. for 9.1
165Rope Drum Hoist complete in all respect and control equipment etc. for 9.1
166Hoist supporting structure & trestle etc for Draft Tube gates etc. for 9.4
167Mandatory Spare Parts (As per statement-IB)
168Tail Race Gate and Rope Drum Hoist
169Tailrace Tunnel Gate (Fixed wheel type)
170First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 10.1
171Second Stage Embedded Parts including dogging arrangement etc. for 10.1
172Rope drum hoist complete in all respect and control equipment for 10.1
173Hoist supporting structure & trestle etc for Tail Race gate for 10.4
174Mandatory Spare Parts (As per statement 1B)
175Adit Gates
176Adit Gates (Hinge type)
177First Stage Embedded Parts for11.1
178Second Stage Embedded Parts for 11.1
179Instrumentation and Remote Control System
180A). PLC based remote control system complete in all respects as described in GTS/ PTS.B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC systemi. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates).ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates.iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates.iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate.v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate.vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate.C) Main Distribution BoardD) Feeder pillar for all HM equipment.
181Mandatory spare parts (As per Statement 1B)
182Diesel Generator Set
183Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
184Mandatory spare parts (As per Statement 1B)
185Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
186Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
187Mandatory spare parts (As per Statement 1B)
188Mandatory Tools & Tackles (As per statement-1A)
189Intake Gates & Hydraulic Hoists
190Low Level Intake Gate & Hydraulic Hoist
191Low Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
192Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
193Hydraulic Cylinder (130T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.11.
194Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.13.
195Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
196Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect common for lower and intermediate level intake gate (as per existing arrangement).
197Intermediate Level Intake Gate & Hydraulic Hoist
198Intermediate Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
199Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
200Hydraulic Cylinder (85T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.21.
201Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.23.
202Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
203Upper Level Intake Gate & Hydraulic Hoist
204Upper Level Intake Gate (Fixed wheel type), dogging arrangement and gate inter-piece lock arrangement (as per existing arrangement) complete in all respect.
205Suspension bars assembly (as per existing arrangement) for the connection of gate with hydraulic hoist complete in all respect.
206Hydraulic Cylinder (50T Cap.) single acting with gate position indication complete in all respect with control equipment etc. for 1.31.
207Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 1.33.
208Hoist supporting structure, ratelier rack with embedded parts and maintenance platform with hand winch (mural hoist) (as per existing arrangement).
209Monorail Hoist (min. 0.5T Cap.) with monorail beam and fixtures etc. complete in all respect.
210Intake Stoplogs & Monorail Hoist:
211Low, Intermediate & Upper Level Intake Stoplogs (Slide type), one set for each intake (as per existing arrangement)
212Monorail (2 x7T Cap.) hoist with lifting beam complete in all respect and control equipment for 2.1 to suit existing monorail beam
213Desilting Chamber Inlet Gates & Rope Drum Hoists
214Desilting Chamber Inlet Gate (Fixed wheel type)
215First Stage Embedded Parts for 3.1
216Second Stage Embedded Parts including dogging etc. for 3.1
217Rope Drum Hoist complete in all respect and control equipment for 3.1
218Hoist supporting structure & trestle etc. for 3.4.
219Desilting Chamber Outlet Gates & EOT Crane
220Desilting Chamber outlet Gate (Slide type)
221First Stage Embedded Parts for 4.1 including air vent pipe (500mm dia.)
222Second Stage Embedded Parts including dogging etc. for 4.1
223EOT Crane including rails, fixtures etc. complete in all respect and control equipment for 4.1 with control equipment..
224Silt Flushing Tunnel Steel liner
225Silt flushing tunnel steel liner 2.6m diameter
226Silt Flushing Tunnel (Service & Emergency) & Hydraulic Hoists
227Silt Flushing Tunnel Service & Emergency Gates (Slide Type)
228First Stage Embedded Parts for 6.1 with 300mm dia. air-vent pipe, steel liner, bonnet and bonnet cover, hoist supporting structure and dogging arrangement.
229Hydraulic cylinder (double acting) with arrangement for gate position indication and control equipment complete in all respect for 6.1
230Hydraulic Power packs complete in all respect including Piping, Electrical Control Panels etc. for 6.3
231Surge Shaft Gate & Rope Drum Hoist
232Surge Shaft Gate (Fixed wheel type)
233First Stage Embedded Parts with reception frame for 7.1 including air vent pipe (300mm dia.)
234Second Stage Embedded Parts including dogging etc. for 7.1
235Rope drum hoist complete in all respect and control equipment for 7.1 with hydraulic motor and Power Pack
236Hoist supporting structure & trestle etc. for 7.4
237Pressure Shaft Steel Liner/ Penstock
238Steel transition of Pressure Shaft Steel Liner at D/s Surge shaft including matching piece with surge shaft reception frame
239Dia 7.0m circular steel liner of upper horizontal portion
240Dia 7.0m circular steel liner of upper vertical bend (UVB)
241Dia 7.0m circular steel liner of vertical pressure shaft
242Dia 7.0m circular steel liner lower vertical Bend (LVB)
2437.0m circular steel liner lower Horizontal with Steel manifold (Bifurcation) with inlet dia. 7.0m bifurcating into two branch pipes of internal dia. 5.0m each (Upstream of MIV).
244Circular reducer steel liner inlet dia 5.0m and outlet dia of 4m of lower horizontal portion
245Dia 4.0m circular steel liner of lower horizontal portion (Downstream of MIV)
2464.0m circular steel liner (extra /matching piece) of length 600mm.
247Draft Tube Gates and Rope Drum Hoists
248Draft Tube Gates (Fixed wheel type)
249First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 9.1
250Second Stage Embedded Parts including dogging etc. for 9.1
251Rope Drum Hoist complete in all respect and control equipment etc. for 9.1
252Hoist supporting structure & trestle etc for Draft Tube gates etc. for 9.4
253Tail Race Gate and Rope Drum Hoist
254Tailrace Tunnel Gate (Fixed wheel type)
255First Stage Embedded Parts incl. 300mm dia Air Vent Pipe etc. for 10.1
256Second Stage Embedded Parts including dogging arrangement etc. for 10.1
257Rope drum hoist complete in all respect and control equipment for 10.1
258Hoist supporting structure & trestle etc for Tail Race gate for 10.4
259Adit Gates
260Adit Gates (Hinge type)
261First Stage Embedded Parts for11.1
262Second Stage Embedded Parts for 11.1
263Instrumentation and Remote Control System
264A). PLC based remote control system complete in all respects as described in GTS/ PTS.B). Following instruments shall also be provided at their respective locations complete in all respect and is not part of PLC systemi. Three (3) Sets of non-contacting microwave type water level measuring and indication equipment at intake area (for balanced head measurement across intake trashrack & intake gates).ii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Inlet Gates.iii. Two (2) sets of water level measuring system including guiding pipes to indicate balance head condition of Desilting Chamber Outlet Gates.iv. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Surge Shaft Gate.v. Two (2) set of water level measuring system including guiding pipes to indicate balance head condition of Draft Tube Gate.vi. One (1) set of water level measuring system including guiding pipes to indicate balance head condition of Tail race Gate.C) Main Distribution BoardD) Feeder pillar for all HM equipment.
265Diesel Generator Set
266Diesel Generator Set (320 KVA) complete in all respect with Mounting Frame, acoustic enclosure, control panels and change-over system etc.
267Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
268Oil Filter unit along with contamination checking kit & low vacuum dehydration and degasification unit
269SUB TOTAL FOR PRICE SCHEDULE-1
270SUB TOTAL FOR PRICE SCHEDULE-2
271SUB TOTAL FOR PRICE SCHEDULE-3 Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57956185
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 131.23 Crore
LAST DATE 20-11-2026
Authority
Authority Name National Hydroelectric Power Corporation Limited
Work Description Tender for Lot-3 Package: Hydro-Mechanical Works For All Gates And Pressure Shaft Liners For The Implementation Of The 260 Mw Dulhasti Stage-Ii H.E Project, In Kishtwar District Of Ut Of J&K, India
Basic Detail
Tender No NH/CCW/CC-IV/CO-486/PR/26/407
Bidding Type Tender
Location
City Kishtwar
State Jammu and Kashmir
Key Dates
Publish Date 09 Oct 2026
Submission Date 20 Nov 2026
Open Date 23 Nov 2026
Finance
Tender Value 131.23 Crore
Tender Fee 10000
EMD 1.97 Crore
Exemption Not Available
Document List
62ddd856-90fa-4ac3-b860-769988218b31.html
BOQ_976968.xls
Tendernotice_1.pdf
Tender_Documents_C.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 33 days
Nov 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 36 days

Tender Documents

Download All (ZIP) ↓
html

62ddd856-90fa-4ac3-b860-769988218b31.html

xls

BOQ_976968.xls

pdf

Tendernotice_1.pdf

pdf

Tender_Documents_C.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender