Tender For Renovation Of Foundation Of Pump Set No. 2 & 4 Installed At Bps Bawana, Inside Bawana Wtp.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
15 Oct 2026
5 days left
EMD
15000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Renovation Of Foundation Of Pump Set No. 2 & 4 Installed At Bps Bawana, Inside Bawana Wtp.
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling of suction by removing of all nut and bolts on both side by cutting with gas cutter and also fixing of dead flange with rubber packing on both side of the 600 mm dia sluice valve. |
| 2 | Dismantling of discharge dismantling joint by removing of all nut and bolts on both side by cutting with gas cutter and also fixing of dead flange with rubber packing on both side of the 600 mm dia sluice valve. |
| 3 | Removal of pump set along with motor with coupling set with the help of installed electric hoist or E.O.T. crane to outside of foundation to make the workable space near the foundation. |
| 4 | Breaking of RCC foundation by concrete breaker & disposal of complete malba outside the pump house by manual labour |
| 5 | Repairing of combine M.S. Base Frame by strengthening providing of MS plate of width approx. size 250 mm x 1250 mm & thickness 10 mm – 04 Nos. along with the width of the base frame also strengthening of M.S. Channel along with the length &botton side the width, this will make the complete strengthening of the base frame in all respect. |
| 6 | Foundation tensile bolt of length approximately 25 mm dia x 250 mm length with three nos. nuts one at bottom and other two nos. at top for locking with bolt along with washers. |
| 7 | M.S. complete jaal of size 12 mm x 16 mm for bar as per the foundation to strengthening RCC foundation provide the all to bear the vibration of pump and the motor on load. |
| 8 | Fixing of MS base frame on the jaal along with the foundation bolt will be fixed as under shown in the drawing. The nut will be used as adjustable of foundation with pump match with suction and delivery side of the existing foundation line. These foundation bolts will be leveled as per the drawing shown. The bottom nut will help the maintain of level of the foundation to match with existing suction and delivery size, because suction and delivery side are fixed in their locations. After proper location of level of the foundation the complete as per the required location the filling of full CC as required by the job. This will be complete in one time grouting of the whole foundation with plaster etc. as required |
| 9 | Fixing of the dead flange and Re-fixing of the nut bolt and packing with dismantling joint as required. |
| 10 | Nut bolt of various size. |
| 11 | Rubber Packing. |
| 12 | Fixing of pump set along with the motor with the proper alignment of the coupling as per the required job. |
| 13 | Testing & Commissioning. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 09, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 15, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysOct 15, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender