Tender For Shifting / Diversion And Modification Of Electrical Utilities And Transmission Line(S) Of 11 Kv And Above Infringing The Alignment, Comprising Dismantling Of Existing Towers / Poles, Conductors And Allied Electrical Installations, Supply,
Tender Overview
Project Description
Tender for Shifting / Diversion And Modification Of Electrical Utilities And Transmission Line(S) Of 11 Kv And Above Infringing The Alignment, Comprising Dismantling Of Existing Towers / Poles, Conductors And Allied Electrical Installations, Supply, Erection, Stringing, Testing And Commissioning Of New Towers / Poles With Allied Foundation And Other Allied Works Etc. - [Schedule - A : Between Aligarh Junction Station And Harduaganj Station In Connection With Construction Of Rfo-4] And[Schedule - B : Shifting Of Ncr Transmission Line Between Aligarh Junction Station And Daud Khan Station In Connection With Construction Of Rfo-1] Under North Central Railway (Ncr), Ministry Of Railways, Govt. Of India
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 30-Oct-2026 | CORRIGENDUM-1 | Date | 17-Nov-2026 |
| 2 | 18-Nov-2026 | CORRIGENDUM-II | Date | 30-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | RFO-4 AND RFO-1 UNDER N.C.RLY. |
| 2 | RFO-4 (JO 51201) — Shifting / Diversion and Modification of Electrical Utilities of 11 kV and above between Aligarh Junction and Harduaganj |
| 3 | RFO-1 (JO 51199) — Shifting / Diversion and Modification of 132 kV D/C Transmission Line of NCR between Aligarh Junction and Daud Khan |
| 4 | \\"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\\" Please Enable Macros to View BoQ information |
| 5 | RFO-4 - Electrical Utility Shifting |
| 6 | Modification of 765 kV / 400 kV / 220 kV crossings — shifting / raising / modification of the affected EHV transmission line crossings including dismantling, supply, erection, stringing, testing and commissioning, complete in all respects. |
| 7 | Modification of 132 kV / 66 kV crossings — shifting / raising / modification of the affected transmission line crossings including dismantling, supply, erection, stringing, testing and commissioning, complete in all respects. |
| 8 | Modification of 33 kV crossings — shifting / raising / modification of the affected 33 kV line crossings including dismantling, supply, erection, stringing, testing and commissioning, complete in all respects. |
| 9 | Modification of 11 kV crossings — shifting / raising / modification of the affected 11 kV line crossings including dismantling, supply, erection, stringing, testing and commissioning, complete in all respects. |
| 10 | Modification of 400 volt LT crossings — shifting / raising / modification of the affected LT line crossings including dismantling, supply, erection, stringing, testing and commissioning, complete in all respects. |
| 11 | \\"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\\" |
| 12 | RFO-1 - Shifting of NCR Transmission Line |
| 13 | SCHEDULE – 1 — PART-A : TR LINE |
| 14 | Preparation of Design and Drawing and including check survey |
| 15 | Erection of foundations : Dry type / Partially submerged type / Fully submerged type for A type, B type, C type, D type Towers, Gantries etc. |
| 16 | Erection of foundations : Supply and erection of reinforcement |
| 17 | Erection of foundations : Supply & erection of brick masonry revetment |
| 18 | Design, fabrication, Supply & erection of A type, B type, C type, D type Towers, Gantries, extension +3, +6, +12, +18 etc. : Super structure |
| 19 | Design, fabrication, Supply & erection of A type, B type, C type, D type Towers, Gantries, extension +3, +6, +12, +18 etc. : Stub (set) |
| 20 | Supply and erection of single Earth electrodes |
| 21 | Extra for Additional earth Electrode |
| 22 | Supply & erection of Phase plate |
| 23 | Supply & erection of Danger plate |
| 24 | Supply & erection of Circuit plate |
| 25 | Supply & erection of Number plate |
| 26 | Supply and erection of anti climbing device |
| 27 | Supply & Erection of Bird Guard |
| 28 | Supply & Erection of a 9 unit single suspension string |
| 29 | Supply & Erection of a 10 unit single Tension string |
| 30 | Supply & Erection of a 10 unit double Tension string |
| 31 | Supply & erection of PANTHER ACSR Conductor for 3 phase double circuit Transmission line |
| 32 | Supply and erection Transmission line accessories for 3 phase double circuit PANTHER ACSR conductor |
| 33 | Supply and erection of ground wire |
| 34 | Supply and erection of ground wire accessories |
| 35 | Supply & Erection of 132 kV solid core support insulators for jumper connection at Gantries |
| 36 | Dismantling of old 132 kV TR line three phase double circuit |
| 37 | Dismantling of old 132 kV TR line towers |
| 38 | Loading, transportation, unloading & stacking of released materials from site to stores of Dy. CMM / Jhansi |
| 39 | Extra for Erection of Panther conductor under shut down |
| 40 | Supply of safety belt for 132 kV TR line |
| 41 | Supply, erection, testing and commissioning of sag measurement solution system, latest version, with downloading and printing facility |
| 42 | Supply, erection, testing and commissioning of thermovision camera along with accessories as per RDSO spec. REV2 or latest, with downloading and printing facility |
| 43 | Supply of discharge rod for TR line |
| 44 | Supply and erection of Brick masonry revetment — Earth work in excavation as per approved drawings and dumping at embankment site or spoil heap, within railway land, including 50 m lead and 1.5 m lift, including incidental work, as per specifications — All kinds of soils |
| 45 | Supply and erection of Brick masonry revetment — for excavation in foundations for buildings and bridges to cover dressing to neat dimension and plumbing sides etc. |
| 46 | Supply and erection of Brick masonry revetment — Extra for watering and ramming earth in foundation and floors in 15 cm layers ( |
| 47 | Supply and erection of Brick masonry revetment — Providing and laying in position cement concrete of specified proportion excluding cost of cement, centering and shuttering, all works upto plinth level 1:3:6 (1 Cement : 3 sand : 6 graded stone aggregate 40 mm nominal size) |
| 48 | Supply and erection of Brick masonry revetment — Providing and laying cement concrete up to plinth in retaining walls, walls (any thickness) including attached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc., excluding the cost of cement and of shuttering / centering, 1:2:4 |
| 49 | Supply and erection of Brick masonry revetment — Centering and shuttering including strutting, propping etc. and removal of form work for Columns, pillars, posts, struts and miscellaneous parts (Engg SOR Item 031063) |
| 50 | Supply and erection of Brick masonry revetment — Supply and using cement at work site, PPC |
| 51 | Supply and erection of Brick masonry revetment — Brick work with non-modular (FPS) bricks of class designation 7.5 in foundation and plinth in cement mortar 1:6 (1 cement : 6 coarse sand) |
| 52 | Supply and erection of Brick masonry revetment — for brick work in superstructure beyond plinth level upto floor two level |
| 53 | Supply and erection of Brick masonry revetment — Brick on edge flooring with bricks of class designation 7.5 including cement slurry etc. complete in cement mortar 1:6 (1 cement : 6 coarse sand) with FPS Bricks |
| 54 | Supply and erection of Brick masonry revetment — 12 mm cement plaster of mix 1:4 (1 cement : 4 coarse sand) SCHEDULE – 02 - PART-B : NON-SCHEDULE (NS) ITEMS |
| 55 | Transportation of less / heavy material and manpower including supply & running of one MUV to the sites of work as per requirement & direction of site incharge. The rates include all taxes, licence fee, road permit, driver wages, fuel, repair & maintenance cost etc., complete in all respects. |
| 56 | Provision of T&P (TR Line maintenance) |
| 57 | Provision of Spares TOTAL OF SCHEDULE – B — GRAND TOTAL PART (A + B) (carried to Summary Mention Below ) \\"NOTE:-THE ABOVE RATE SHALL BE INCLUSIVE OF ALL TAXES & DUTIES, ROYALTIES, CESS, FEE, ENVIORMENTAL & POLLUTION, FITNESS & SAFETY CLEARANCE CHARGES (IF ANY), OR ANY OTHER INCIDENTAL CHARGES ETC BUT EXCLUDING GST.\\" |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 11 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender