Tender For Constructing 550M 11Kv Line And Installing 100 Kva Tr At Ayiravally Under Electrical Section Parippally
Tender Overview
Project Description
Tender for Constructing 550M 11Kv Line And Installing 100 Kva Tr At Ayiravally Under Electrical Section Parippally
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Nov-2026 | Retender Date Corrigendum | Date | 28-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | LABOUR |
| 2 | (144) Erecting one 100kVA Transformer to existing DP and giving connections,including loading from TMR/SRS/otherstacking place & unloading at site butexcluding cost for transportingtransformer. |
| 3 | (728) Transporting Transformers by hired vehicle to a distance upto 5km andcarrying upto 2 numbers of 63/100/160/250kVA Transformers /Ring Main Units excluding loading&unloading charges. |
| 4 | (171) Fitting one Additional 2.4m/3m ChanneL cross arm (100x50x6mm), in existing 11kV DP including conveyance of materials. |
| 5 | (1.87) Additional rate for excavation of one Pit for Coil Earthing in Laterite |
| 6 | (726) Transporting poles by hired vehicle to a distance upto 5km and carrying upto 4 numbers of poles excluding loading&unloading charges. |
| 7 | (729) Transporting Transformers by hired vehicle to a distance beyond 5km and carrying upto 2 numbers of63/100/160/250kVA Transformers /Ring Main Units (Running km). |
| 8 | (112) Fitting and erecting one HT PSC Single Pole in position, including fitting cross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 9 | (122) Fitting and providing one HT Fly stay for 11kV pole using HT PSC pole including digging and back filling pits in ordinary soil, drawing sufficient length of GI earth leads to the ground for earthing (excluding provision of earthing). |
| 10 | (132) Additional rate for excavation of Pit for A type pole in Hard Laterite. |
| 11 | (139) Fitting 5 channel cross arms, AB switch, DO fuse, LA(Ord), HT & LTconnections upto OH lines, etc. onexisting DP structure, Fixing distributionbox/provision for one set (3No.) of LTfuses, , drawing sufficient length of GIearthing leads to the ground for earthing,excluding provision of earthing &mounting of Transformer on poles. |
| 12 | (170) Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials. |
| 13 | (173) Fitting one Additional 3m Channel cross arm (35x35x5mm), in existing 11kV DP including conveyance of materials. |
| 14 | (157) Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m lengthincluding digging separate pit(0.45x0.45x2.5m) at a minimumdistance of 1.5m away from thepole/structure and maintaining standarddistance between different earth pipes inordinary soil & backfilling. |
| 15 | (161) Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite. |
| 16 | (706) Labour charges for loading LT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 17 | (703) Labour charges for loading HT A type pole from the stacking place andunloading the same at work site(transportation by any vehicle). |
| 18 | (702) Labour charges for loading HT PSC pole from the stacking place and unloading the same at work site (transportation by any vehicle). |
| 19 | (554) Dismantling (without damage) one LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 20 | (553) Dismantling one damaged LT PSC/RCC pole after disconnecting stays, strut etc. attached thereon and stacking the same. |
| 21 | (451) Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line andreconnecting the same after completingthe line work. |
| 22 | (610) Dismantling one ordinary streetlight/CFL/LED fitting from existing poleand refitting the same on newly erectedpole including disconnecting andreconnecting wires. |
| 23 | (952) Providing concrete muffing of size0.45x0. 45x1.5m (0.5m above GL and1m below GL). Excavation0.45x0.45x1m, concrete (1:3:6, 20mm)0.45x0.45x1.5m, Plastering (1:3) 12mm0.45x0.45mx5sides. |
| 24 | (953) Providing Transformer fencing to aheight of 1.8 m above ground level usingMS Angle frames of size ISA50x50x6mm for outer frame, 2 runs of40 x 6 MS flat for horizondal brasingand grills with MS rods 8 mm Dia @10cm c/c for verticals, providing gatewith locking arrangements, providingdanger board & name board, embedingthe legs in cement concrete 1:2:4,footing of size 30cmx30cmx50cm,painting with synthetic enamel paint twocoats over one coat of iron primer etccomplete, incl cost of transportation |
| 25 | (954) Cleaning and levelling of transformeryard/RMU, spreading 40 mm brokenstone in yard for a thickness of 10 cmabove bed of 10 cm thick 6 mm brokenstone, after constructing a curb wall ofheight 20cm above ground and 10cmbelow level including cost of allmaterials and charges for conveying,spreading, consolidating etc. |
| 26 | (113) Fitting and erecting one HT A typeSingle Pole in position, including fittingcross arm, digging and back filling pit inordinary soil (as per standards), drawingsufficient length of GI earthing leadsfrom F clamp through V cross arm to theground for earthing (excluding provisionof earthing). |
| 27 | (677) Cutting trees having girth beyond 60cm but upto and including 120cm (felling trees including cutting of trunks and branches) and removing the rootcompletely and stacking etc. 1 No. |
| 28 | (676) Cutting trees having girth beyond 30cm but upto and including 60cm (felling trees including cutting of trunks and branches) and removing the rootcompletely and stacking etc. 1 No. |
| 29 | (169) Fitting one Additional V cross arm in existing single pole includingconveyance of materials. |
| 30 | (116) Fitting and erecting one HT Double Pole Structure using PSC pole in position including fitting 2 channel cross arms, digging and back filling pit in ordinary soil, drawing sufficient length of GI earthing leads through all cross arms to the ground for earthing (excludingprovision of earthing). |
| 31 | (115) Additional rate for providing one disc set, PG clamp etc. complete, on any type of HT pole for making cut point. |
| 32 | (163) Providing one Coil Earth using No.8 GI-earth wire (50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standard distanceaway from the pole/structure in ordinarysoil & backfilling. |
| 33 | (363) Drilling hole of various sizes on existing Channel/Cross Arm. |
| 34 | (325) Additional rate for reinstalling LT lineon the renewed 11kV pole having bothHT and LT (HT/LT) lines. |
| 35 | (131) Additional rate for excavation of Pit for A type pole in Laterite. |
| 36 | (127) Additional rate for excavation of one Pit for HT Pole/HT Stay in Laterite. |
| 37 | (128) Additional rate for excavation of one Pit for HT Pole/HT Stay in Hard Laterite. |
| 38 | (452) Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line andreconnecting the same after completingthe line work. |
| 39 | (419) Transferring LT single phase 2/3 wire OH line to newly erected HT/LT poleincluding dismantling existing cross armand insulators, refitting the same on thenew pole, binding etc. complete. |
| 40 | (420) Transferring LT three phase 4/5 wire OH line to newly erected HT/LT poleincluding dismantling existing cross armand insulators, refitting the same on thenew pole, binding etc. complete. |
| 41 | (119) Fitting and providing one HT Stay for 11kV pole, including digging and back filling pit in ordinary soil. |
| 42 | (156) Fitting one additional Fuse unit and giving connection from Transformer to fuse and Distribution box to LT OH line. |
| 43 | (205) Providing Stay for LT poles including digging & back filling pit in ordinarysoil. |
| 44 | (209) Additional rate for excavation of one Pit for LT Pole/LT Stay in Hard Laterite. |
| 45 | (208) Additional rate for excavation of one Pit for LT Pole/LT Stay in Laterite. |
| 46 | (204) Erecting one LT PSC Pole in position including digging & back filling pit in ordinary soil. |
| 47 | (C-202425-4575-1) Stringing of 11KV, 99sqmm, XLPE covered conductor including fitting of all accessories, providing end terminations,midspan joints, pipe earthing, installinginsulated piercing connectors etc. |
| 48 | Total of BoQ1 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender