Banking and Finance Government Departments Closing in 6 days TDR #57937941

Tender For Furnishing Work For Branch & E - Lobby Premises Bank Of India At Ashta (M.P.)

Issued by Government Departments · bhopal, Madhya Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
21 Oct 2026
6 days left
EMD
25000
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bhopal → Madhya Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Furnishing Work For Branch & E - Lobby Premises Bank Of India At Ashta (M.P.) 1 Acp Panelling At Fornt Entrance Gateway Box , On Rolling Shutter Boxing , And/Or Front Face On Wall Openings : - Panelling On Front Entrance Gateway Box Or On Openings In Walls ( To Block Outside View) With 2 X1 18 Gauge Section Unannodised Aluminum(As Per Site Requirement) Framework. The Framing Shall Be Fixed With Aluminium Composite Panel ( Acp) Covering Of Approved Shade & Pattern , With Pvdf Coating & Ldpe Core Laminated Eurobond / Altobond/ Alkobond Exterior Grade 4 Mm Thick With Composite Of (0.5Mm-3Mm-0.5Mm) Including Fabrication For The Same With Aluminium Sections, Required Hardware, Silicon Sealent (Dow Corning 789) Masking Tape, Necessary Scaffolding Etc. As Detailed In Drawing Complete In All Respects. 70.00 Sq.Ft. 2 Mineral Fibre Ceiling Boards False Ceiling ( Grid Ceiling ) Arrangement :- Providing And Fixing Of Armstrong Make Mineral Fibre Ceiling Boards In True Horizontal Level Suspended On Inter Locking Grid System Made Of Hot Dip Galvanized Steel Sections Powder Coated Xl -15 Mm As Per Manufacturers Specification Including Making Opening For Electrical And Air Conditioning Fitting Complete As Directed. The Tiles And Grid System - Framework Xl-15 Mm Main Runner Of 3000Mm Spaced At 1200Mm Centre Fixed To Soffit By Approved Hangers At 1200Mm Distance. First And Last Hanger Should Not Be At A Distance More Than 450Mm From The Adjacent Wall.Xl-15 Mm 1200Mm Cross Tee To Be Interlocked Between Main Runner At 600Mm Centre To Form 200X600Mm Module 600Mmx600Mm Module To Be Formed By Fixing Xl-15Mm 600Mm Cross Tee Between Centre Of 1200Mm Cross Tees.19X19 Mm Wall Angle To Be Secured To Wall At 450Mm Centers Suspension To Be Done By Using 2Mm Pre-Straightened Gi Wire Using Anchor Fasteners. Make - Armstrong - Ans Micro & Supra Fine Xl Frame Work. Note: Where Rcc Slab Is Old And Concrete Is Weal, The Gi Suspended Channel Shall Be Fixed With Epoxy Chemical And Necessary Load Test To Be Carrid Out Before Fixing Gypsum Board Fixing.Rate Shall Be Inclusive Of Epoxy Chemical And Fixing Of Suspenders With Chemical 820.00 Sq.Ft. 3 Grypsum Board Ceiling :- Providing & Fixing As Per Design With Suspended False Ceiling Consisting Of 12Mm.Thk.Gyp. Board Suspended On G.I. Framework To Consists Of G.I. Perimeter Channels 0.55 Mm Thk. X 20Mm .X 30Mm. Along Perimeter Of False Ceiling; Screw Fixed To Wall/Partition With Nylon Sleeves & Screws @ 600Mm. Dc. Suspending Gi. Interme Diate Channels Of Size 0.9Mm Thk.X45Mmx15Mm. From The Soffit At Max. Distance 1220Mm. Dc With Ceiling Angle 0.55Mm. Thk.X2N5Mm.X10Mm. Fixed To Soffit Using Proprietary Supplied Gi. Cleats & Steel Expansion Fasteners. Ceiling Section 0.55Mm Thk. Xweb Size 51.5Mm & Flanges 26Mm. Each & 10.5 Mm. Lips Fixed Perpendicular To Intermediate Channel At 457Mm. C/C Gyp Board Is Screw Fixed To Ceiling Section With 25Mm. Drywall Screws At 230Mm. C/C. Boards To Be Finished With Proprietary Supplied Jointing Tape & Jointing Compound & Sand Papered To Achieve A Smooth Finish Etc.Complete Or As Directed By The Architec/Bank. Gyp Ceiling Where Necessary As Normal Specification Rate Should Include All Types Of Cut-Outs, Grooves ,Moulding & Plain Troughs For Tube Lights / Down Lighter As Directed By The Designer. Note: Where Rcc Slab Is Old And Concrete Is Weal, The Gi Suspended Channel Shall Be Fixed With Epoxy Chemical And Necessary Load Test To Be Carrid Out Before Fixing Gypsum Board Fixing.Rate Shall Be Inclusive Of Epoxy Chemical And Fixing Of Suspenders With Chemical 520.00 Sq.Ft. 4 Front Office Counter( Specifically As Shown In Drawing) - Providing And Fixing In Position Front Office Counter 2’-6” Wide As Per Drawing Comprising Of The Following Complete In All Respects:- 18.00 R.Ft. Boi – Ashta Branch - Furniture Work 23 I) Working Top Made With 25Mm Thick Plywood Finished With 1Mm Thick Laminate. Outside Edge Of The Working Top Shall Be Provided With 1¼”X1” Teak Wood Moulding Finished With Melamine Polish. Inside Edge Will Be Provided With ½ “X1” T.W. Beading Patti With Melamine Finish. Ii) Vertical Facia (Apron) Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With 1Mm Thick Groove At The Joint Of Laminates Of Two Different Shades. Iii) Vertical Drop (Horizontal Band) Shall Be Provided On The Facia Below The Working Top Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With Provision For Concealed Light, 1 Mm Thick Groove Shall Be Provided At The Joint Of Two Different Shades Of Laminate. Iv) Glazed Partition Above Working Top To Be Provided With 12Mm Thick Clear Glass Cut To The Standard Shape Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. The Exposed Edges Of The Glass Shall Be Finished In Mirror Polish. V) 3’-10” High Boxing (10”X10”) Made With 18 Mm Thick Plywood Finished With 1 Mm Thick Laminate Including Providing And Fixing 6 Mm Thick Square Frosted Glass At A Height 3’-2” Above Finished Floor Level. Vi) 1’-9” High Boxing (5”X5”) Made With 12 Mm Thick Plywood Finished With 1 Mm Thick Laminate. Vii) Vertical Supports Made With 18 Mm Thick Plywood Finished With White Enamel Paint. Viii) Telescopic Cpu Stand/ Readymade Keyboard Tray Shall Be Provided Of Approved Model And Make. Ix) Footrest Made With T.W. Member Of Size 4”X1 ½ “ Finished With French Polish. X) Drawer Units As Per Drawing Shall Be Provided With Multipurpose Godrej Locks In Each Drawer. Fascia Of Drawer Unit Shall Be Finished With 1Mm Thick Laminate And All Other Sides Shall Be Finished With White Enamel Paint. The Drawers Will Be Provided With Handles (Stainless Steel Finish) And Channels As Per Approval Of The Project Consultant / Bank. Xi) Boxing As Per Drawing Made With 12Mm Thick Plywood Finished With Synthetic Enamel Paint Shall Be Provided Below The Table Top For Electrical Conduiting And At The Bottom For The Lan Cabling/Telephone Wire Conduiting. Note -The Item To Include All Necessary Hardware And Fittings In Stainless Steel Finish, Lipping To All Edges And Making Provision Only For Electrical Fitting Behind The Front. Vertical Drop And Also In The 10”X10” Boxing As Shown In The Drawing. Necessary Beadings With Melamine Polish For Fixing The Glass Are To Be Provided. 5 Cash Counter - Providing And Fixing In Position Cash Counter 2’-9” Wide As Per Drawing Comprising Of The Following :( Note:- The Item Shall Have A 8Mm Thick Clear Float Galss On Table/Counter Top With Edges Machine Polished & Rounded.) 9.00 R.Ft. I) Working Top Made With 25Mm Thick Plywood Finished With 1Mm Thick Laminate. Outside Edge Of The Working Top Shall Be Provided With 1¼”X1” Teak Wood Molding Finished With Melamine Polish. Inside Edge Will Be Provided With ½ “X1” T.W. Beading Patti With Melamine Polish. Ii) Vertical Fascia (Apron) Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With 1Mm Thick Groove At The Joint Of Laminates Of Two Different Shades. Iii) Vertical Drop (Horizontal Band) Shall Be Provided On The Fascia Below The Working Top Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With Provision For Concealed Light, 1 Mm Thick Groove Shall Be Provided At The Joint Of Two Different Shades Of Laminate. Iv) Glazed Partition Of 1’-4” Height Above Working Top Provided With 12Mm Thick Toughened And Frosted Glass Besides Non-Transparent Film From Inside Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. The Exposed Edges Of The Glass Shall Be Finished In Mirror Polish. Boi – Ashta Branch - Furniture Work 24 V) Transaction Top Shall Be Provided With 12Mm Thick Toughened Glass (Partly Glazed Partly Frosted) Fixed Horizontally With Concealed Stainless Steel D Bracket. Both Exposed Edges (Inside And Outside) Shall Be Moulded And Finished In Mirror Polish. Vi) Glazed Partition Having Height 1’.0” Above The Transaction Top (In Facia) Shall Be Provided With 12 Mm Thick Glass (Clear) With Cut Out Of 8”X 4” As Per Drawing. The Edges Of Cut Out And The Top Edge Of Glass Are To Be Mirror Polished And To Be Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. Vii) Glazed Partition Provided With 12Mm Thick Glass (Clear) Above The Slit To Be Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. . The Exposed Edges Shall Be Finished In Mirror Polish. Viii) 7’-7” High Boxing (10”X 10”) Made With 18Mm Thick Plywood As Per Drawing With 1-6” Horizontal Extension At The Top Including Providing And Fixing 6 Mm Thick Square Frosted Glass At A Height Of 5”- 11” Above Finished Floor Level. Ix) 1’-9” High Boxing (5”X 5”) Made With 12 Mm Thick Plywood Finished With 1 Mm Thick Laminate Are To Be Provided. X) Telescopic Cpu Stand/ Readymade Keyboard Tray Shall Be Provided Of Approved Model And Make. Xi) Footrest Made With T.W. Member Of Size 4”X1 ½ “ Finished With French Polish. Xii) Drawer Units As Per Drawing Shall Be Provided And Each Drawer Should Have Vertical Partitions For Keeping The Currency Notes And Multipurpose Godrej Locks. Fascia Of Drawer Unit Shall Be Finished With 1Mm Thick Laminate And All Other Sides Shall Be Finished With White Enamel Paint. The Drawers Will Be Provided With Handles (Stainless Steel Finish) And Channels As Per Approval Of The Project Consultant / Bank. Xi) Boxing As Per Drawing Made With 12Mm Thick Plywood Finished With Synthetic Enamel Paint Shall Be Provided Below The Table Top For Electrical Conduiting And At The Bottom For The Lan Cabling/Telephone Wire Conduiting. Note - The Item To Include All Necessary Hardware And Fittings In Stainless Steel Finish, Lipping To All Edges And Making Provision Only For Electrical Fitting Behind The Vertical Drop And Also In The 10”X10” Boxing As Shown In The Drawing. Necessary Beadings With Matching Melamine Polish For Fixing The Glass Are To Be Provided As Per Drawing/ As Directed. 6 Solid Full Height Partition :- Providing , Manufacturing & Fixing Solid Full Height Partition With No Glazing ( Upto False Ceiling Height Form Floor Level ) For Different Areas As Per Requirement .The Partition Shall Be Made Up Of - 2 X 2.5 Hard Wood / Kail Wood / Built-Up Plywood Sections Framework ( Frame Members Shall Be Running In Both Directions @ 2-0 C/C ) , Fixed With 8Mm Mr Grade Ply Board On Both Sides Finished With 1.0Mm Laminate Of Approved Shade . Necessary Holes Must Be Made In The Frame Work Sections And In Partition , To Run The Wires , Cables , Ac Pipes , Etc. Wherever Needed. 290.00 Sq.Ft. 7 Glazed Full Partition Work : - Providing , Manufacturing & Fixing Of Glazed Full Height Partitions For Different Areas As Per Requirement .The Partition Shall Be Made Up Of - 2 X 2.5 Hard Wood / Kail Wood / Built-Up Plywood Sections Framework ( Frame Members Shall Be Running In Both Directions @ 2-0 C/C ) , Fixed With 8Mm Mr Grade Ply Board On Both Sides Finished With 1.0Mm Laminate Of Approved Shade . The Partition Shall Be Provided With 8 Mm Thick Clear Float Glass Above 3-0 Height From Floor Level And Upto 7-0 Height From Floor Level . The 8Mm Thick Clear Flost Glass Shall Be Fixed With Mdf Beading Duly Polished .Necessary Holes Must Be Made In The Frame Work Sections And In Partition , To Run The Wires , Cables , Ac Pipes , Etc. Wherever Needed. Etc.

AI Tender Summary

OUR REF NO 57937941
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 21-10-2026
Authority
Authority Name Bank of India
Work Description Tender For Furnishing Work For Branch & E - Lobby Premises Bank Of India At Ashta (M.P.) 1 Acp Panelling At Fornt Entrance Gateway Box , On Rolling Shutter Boxing , And/Or Front Face On Wall Openings : - Panelling On Front Entrance Gateway Box Or On Openings In Walls ( To Block Outside View) With 2 X1 18 Gauge Section Unannodised Aluminum(As Per Site Requirement) Framework. The Framing Shall Be Fixed With Aluminium Composite Panel ( Acp) Covering Of Approved Shade & Pattern , With Pvdf Coating & Ldpe Core Laminated Eurobond / Altobond/ Alkobond Exterior Grade 4 Mm Thick With Composite Of (0.5Mm-3Mm-0.5Mm) Including Fabrication For The Same With Aluminium Sections, Required Hardware, Silicon Sealent (Dow Corning 789) Masking Tape, Necessary Scaffolding Etc. As Detailed In Drawing Complete In All Respects. 70.00 Sq.Ft. 2 Mineral Fibre Ceiling Boards False Ceiling ( Grid Ceiling ) Arrangement :- Providing And Fixing Of Armstrong Make Mineral Fibre Ceiling Boards In True Horizontal Level Suspended On Inter Locking Grid System Made Of Hot Dip Galvanized Steel Sections Powder Coated Xl -15 Mm As Per Manufacturers Specification Including Making Opening For Electrical And Air Conditioning Fitting Complete As Directed. The Tiles And Grid System - Framework Xl-15 Mm Main Runner Of 3000Mm Spaced At 1200Mm Centre Fixed To Soffit By Approved Hangers At 1200Mm Distance. First And Last Hanger Should Not Be At A Distance More Than 450Mm From The Adjacent Wall.Xl-15 Mm 1200Mm Cross Tee To Be Interlocked Between Main Runner At 600Mm Centre To Form 200X600Mm Module 600Mmx600Mm Module To Be Formed By Fixing Xl-15Mm 600Mm Cross Tee Between Centre Of 1200Mm Cross Tees.19X19 Mm Wall Angle To Be Secured To Wall At 450Mm Centers Suspension To Be Done By Using 2Mm Pre-Straightened Gi Wire Using Anchor Fasteners. Make - Armstrong - Ans Micro & Supra Fine Xl Frame Work. Note: Where Rcc Slab Is Old And Concrete Is Weal, The Gi Suspended Channel Shall Be Fixed With Epoxy Chemical And Necessary Load Test To Be Carrid Out Before Fixing Gypsum Board Fixing.Rate Shall Be Inclusive Of Epoxy Chemical And Fixing Of Suspenders With Chemical 820.00 Sq.Ft. 3 Grypsum Board Ceiling :- Providing & Fixing As Per Design With Suspended False Ceiling Consisting Of 12Mm.Thk.Gyp. Board Suspended On G.I. Framework To Consists Of G.I. Perimeter Channels 0.55 Mm Thk. X 20Mm .X 30Mm. Along Perimeter Of False Ceiling; Screw Fixed To Wall/Partition With Nylon Sleeves & Screws @ 600Mm. Dc. Suspending Gi. Interme Diate Channels Of Size 0.9Mm Thk.X45Mmx15Mm. From The Soffit At Max. Distance 1220Mm. Dc With Ceiling Angle 0.55Mm. Thk.X2N5Mm.X10Mm. Fixed To Soffit Using Proprietary Supplied Gi. Cleats & Steel Expansion Fasteners. Ceiling Section 0.55Mm Thk. Xweb Size 51.5Mm & Flanges 26Mm. Each & 10.5 Mm. Lips Fixed Perpendicular To Intermediate Channel At 457Mm. C/C Gyp Board Is Screw Fixed To Ceiling Section With 25Mm. Drywall Screws At 230Mm. C/C. Boards To Be Finished With Proprietary Supplied Jointing Tape & Jointing Compound & Sand Papered To Achieve A Smooth Finish Etc.Complete Or As Directed By The Architec/Bank. Gyp Ceiling Where Necessary As Normal Specification Rate Should Include All Types Of Cut-Outs, Grooves ,Moulding & Plain Troughs For Tube Lights / Down Lighter As Directed By The Designer. Note: Where Rcc Slab Is Old And Concrete Is Weal, The Gi Suspended Channel Shall Be Fixed With Epoxy Chemical And Necessary Load Test To Be Carrid Out Before Fixing Gypsum Board Fixing.Rate Shall Be Inclusive Of Epoxy Chemical And Fixing Of Suspenders With Chemical 520.00 Sq.Ft. 4 Front Office Counter( Specifically As Shown In Drawing) - Providing And Fixing In Position Front Office Counter 2’-6” Wide As Per Drawing Comprising Of The Following Complete In All Respects:- 18.00 R.Ft. Boi – Ashta Branch - Furniture Work 23 I) Working Top Made With 25Mm Thick Plywood Finished With 1Mm Thick Laminate. Outside Edge Of The Working Top Shall Be Provided With 1¼”X1” Teak Wood Moulding Finished With Melamine Polish. Inside Edge Will Be Provided With ½ “X1” T.W. Beading Patti With Melamine Finish. Ii) Vertical Facia (Apron) Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With 1Mm Thick Groove At The Joint Of Laminates Of Two Different Shades. Iii) Vertical Drop (Horizontal Band) Shall Be Provided On The Facia Below The Working Top Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With Provision For Concealed Light, 1 Mm Thick Groove Shall Be Provided At The Joint Of Two Different Shades Of Laminate. Iv) Glazed Partition Above Working Top To Be Provided With 12Mm Thick Clear Glass Cut To The Standard Shape Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. The Exposed Edges Of The Glass Shall Be Finished In Mirror Polish. V) 3’-10” High Boxing (10”X10”) Made With 18 Mm Thick Plywood Finished With 1 Mm Thick Laminate Including Providing And Fixing 6 Mm Thick Square Frosted Glass At A Height 3’-2” Above Finished Floor Level. Vi) 1’-9” High Boxing (5”X5”) Made With 12 Mm Thick Plywood Finished With 1 Mm Thick Laminate. Vii) Vertical Supports Made With 18 Mm Thick Plywood Finished With White Enamel Paint. Viii) Telescopic Cpu Stand/ Readymade Keyboard Tray Shall Be Provided Of Approved Model And Make. Ix) Footrest Made With T.W. Member Of Size 4”X1 ½ “ Finished With French Polish. X) Drawer Units As Per Drawing Shall Be Provided With Multipurpose Godrej Locks In Each Drawer. Fascia Of Drawer Unit Shall Be Finished With 1Mm Thick Laminate And All Other Sides Shall Be Finished With White Enamel Paint. The Drawers Will Be Provided With Handles (Stainless Steel Finish) And Channels As Per Approval Of The Project Consultant / Bank. Xi) Boxing As Per Drawing Made With 12Mm Thick Plywood Finished With Synthetic Enamel Paint Shall Be Provided Below The Table Top For Electrical Conduiting And At The Bottom For The Lan Cabling/Telephone Wire Conduiting. Note -The Item To Include All Necessary Hardware And Fittings In Stainless Steel Finish, Lipping To All Edges And Making Provision Only For Electrical Fitting Behind The Front. Vertical Drop And Also In The 10”X10” Boxing As Shown In The Drawing. Necessary Beadings With Melamine Polish For Fixing The Glass Are To Be Provided. 5 Cash Counter - Providing And Fixing In Position Cash Counter 2’-9” Wide As Per Drawing Comprising Of The Following :( Note:- The Item Shall Have A 8Mm Thick Clear Float Galss On Table/Counter Top With Edges Machine Polished & Rounded.) 9.00 R.Ft. I) Working Top Made With 25Mm Thick Plywood Finished With 1Mm Thick Laminate. Outside Edge Of The Working Top Shall Be Provided With 1¼”X1” Teak Wood Molding Finished With Melamine Polish. Inside Edge Will Be Provided With ½ “X1” T.W. Beading Patti With Melamine Polish. Ii) Vertical Fascia (Apron) Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With 1Mm Thick Groove At The Joint Of Laminates Of Two Different Shades. Iii) Vertical Drop (Horizontal Band) Shall Be Provided On The Fascia Below The Working Top Made With 18Mm Thick Plywood Finished With 1Mm Thick Laminate With Provision For Concealed Light, 1 Mm Thick Groove Shall Be Provided At The Joint Of Two Different Shades Of Laminate. Iv) Glazed Partition Of 1’-4” Height Above Working Top Provided With 12Mm Thick Toughened And Frosted Glass Besides Non-Transparent Film From Inside Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. The Exposed Edges Of The Glass Shall Be Finished In Mirror Polish. Boi – Ashta Branch - Furniture Work 24 V) Transaction Top Shall Be Provided With 12Mm Thick Toughened Glass (Partly Glazed Partly Frosted) Fixed Horizontally With Concealed Stainless Steel D Bracket. Both Exposed Edges (Inside And Outside) Shall Be Moulded And Finished In Mirror Polish. Vi) Glazed Partition Having Height 1’.0” Above The Transaction Top (In Facia) Shall Be Provided With 12 Mm Thick Glass (Clear) With Cut Out Of 8”X 4” As Per Drawing. The Edges Of Cut Out And The Top Edge Of Glass Are To Be Mirror Polished And To Be Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. Vii) Glazed Partition Provided With 12Mm Thick Glass (Clear) Above The Slit To Be Fixed To Partition As Per Fixing Details And To Boxing With Concealed S. S. Finished ‘D’ Brackets As Shown In The Drawing. . The Exposed Edges Shall Be Finished In Mirror Polish. Viii) 7’-7” High Boxing (10”X 10”) Made With 18Mm Thick Plywood As Per Drawing With 1-6” Horizontal Extension At The Top Including Providing And Fixing 6 Mm Thick Square Frosted Glass At A Height Of 5”- 11” Above Finished Floor Level. Ix) 1’-9” High Boxing (5”X 5”) Made With 12 Mm Thick Plywood Finished With 1 Mm Thick Laminate Are To Be Provided. X) Telescopic Cpu Stand/ Readymade Keyboard Tray Shall Be Provided Of Approved Model And Make. Xi) Footrest Made With T.W. Member Of Size 4”X1 ½ “ Finished With French Polish. Xii) Drawer Units As Per Drawing Shall Be Provided And Each Drawer Should Have Vertical Partitions For Keeping The Currency Notes And Multipurpose Godrej Locks. Fascia Of Drawer Unit Shall Be Finished With 1Mm Thick Laminate And All Other Sides Shall Be Finished With White Enamel Paint. The Drawers Will Be Provided With Handles (Stainless Steel Finish) And Channels As Per Approval Of The Project Consultant / Bank. Xi) Boxing As Per Drawing Made With 12Mm Thick Plywood Finished With Synthetic Enamel Paint Shall Be Provided Below The Table Top For Electrical Conduiting And At The Bottom For The Lan Cabling/Telephone Wire Conduiting. Note - The Item To Include All Necessary Hardware And Fittings In Stainless Steel Finish, Lipping To All Edges And Making Provision Only For Electrical Fitting Behind The Vertical Drop And Also In The 10”X10” Boxing As Shown In The Drawing. Necessary Beadings With Matching Melamine Polish For Fixing The Glass Are To Be Provided As Per Drawing/ As Directed. 6 Solid Full Height Partition :- Providing , Manufacturing & Fixing Solid Full Height Partition With No Glazing ( Upto False Ceiling Height Form Floor Level ) For Different Areas As Per Requirement .The Partition Shall Be Made Up Of - 2 X 2.5 Hard Wood / Kail Wood / Built-Up Plywood Sections Framework ( Frame Members Shall Be Running In Both Directions @ 2-0 C/C ) , Fixed With 8Mm Mr Grade Ply Board On Both Sides Finished With 1.0Mm Laminate Of Approved Shade . Necessary Holes Must Be Made In The Frame Work Sections And In Partition , To Run The Wires , Cables , Ac Pipes , Etc. Wherever Needed. 290.00 Sq.Ft. 7 Glazed Full Partition Work : - Providing , Manufacturing & Fixing Of Glazed Full Height Partitions For Different Areas As Per Requirement .The Partition Shall Be Made Up Of - 2 X 2.5 Hard Wood / Kail Wood / Built-Up Plywood Sections Framework ( Frame Members Shall Be Running In Both Directions @ 2-0 C/C ) , Fixed With 8Mm Mr Grade Ply Board On Both Sides Finished With 1.0Mm Laminate Of Approved Shade . The Partition Shall Be Provided With 8 Mm Thick Clear Float Glass Above 3-0 Height From Floor Level And Upto 7-0 Height From Floor Level . The 8Mm Thick Clear Flost Glass Shall Be Fixed With Mdf Beading Duly Polished .Necessary Holes Must Be Made In The Frame Work Sections And In Partition , To Run The Wires , Cables , Ac Pipes , Etc. Wherever Needed. Etc.
Basic Detail
Tender No
Bidding Type Tender
Location
City bhopal
State Madhya Pradesh
Key Dates
Publish Date 09 Oct 2026
Submission Date 21 Oct 2026
Open Date 21 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee 590
EMD 25000
Exemption Not Available
Document List
006373ce-754c-457a-ac3b-099484b8f084.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 09, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2026
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Upcoming · 6 days
Oct 21, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

006373ce-754c-457a-ac3b-099484b8f084.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender