Tender For Providing And Laying Cement Concrete Channel At Chumik Tangmo Diskit , Hunder Nubra, Kobet Nubra , Tsogstod Diskit And Construction Of Culvert At Chumik Tangmo Of Forest Range Nubra For The Year 2026-27 Scheme - C A
Tender Overview
Project Description
Tender for Providing And Laying Cement Concrete Channel At Chumik Tangmo Diskit , Hunder Nubra, Kobet Nubra , Tsogstod Diskit And Construction Of Culvert At Chumik Tangmo Of Forest Range Nubra For The Year 2026-27 Scheme - C A
BOQ
| Sl. No. | Item Description |
| 1 | Concrete Channel |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.50 m, disposed earth to be levelled and neatly dressed All kinds of soil Khul qty = 01x 250'x 3'6\\"x0' 10\\" = 726.25 cftcc channel qty = 01 x 1000' x 3'0\\" x 10\\" = 2499 cft ( chumik tangmo 91.27 cum , Hunder channel 37.87 cum , Kobet channel 271 cum , Tsogstod 81 cum ) |
| 3 | Providing and lying-in position of cement concrete of specific grade including of centering and shuttering all work upto plinth level 1:3:6(1cement 3 fine sand 6 graded stone agg.20mm nominal size)1 crushed incl carriage of cementbed for cc channel01 x 1000' x 2'6\\" x 0'6\\" = 1250 cftbed for khul01x250' x 3'0\\"x 0'6\\" = 225 cftside for khul and cc channel02 x 1150' x 0'6\\"x1'6 \\" = 1840 cft ( Chumik Tangmo 93.81 cum , Hunder Channel 55.9 cum , Kobet channel 353.56 cum , Tsogstod channel 187 cum ) |
| 4 | Soling/dumping of stone in horizontal levelQty = 01x1000 x 2'6\\" x 0'4\\" = 825 cft or 23.34 cum @850/m3 ( Chumik Tangmo 23.34 cum , Hunder Channel 11.67 cum , Kobet channel 53.65 cum ) |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns 4x1125x1'6\\"= 6750sft or 627.075 sqm ( Chumik Tangmo 627.075 sqm , Hunder channel 153.28 sqm , Kobet Channel 752.5 sqm , Tsogstod channel 836 sqm ) |
| 6 | Consumption and material.Item no 02a) sand 93.81 cum @0.38= 35.64 cumb ) aggregate 93.81 cum @0.85 = 79.74cum Item no 03 :- 23.34 cum ( Chumik Tangmo 69.11 cum , hunder channel 69.11 cum , kobet channel 500.53 cum , tsogstod channel 229.95 cum ) |
| 7 | a) Carriage of sands 35.64 cum from a distance of 10 kms . ( Chumik tangmo 35.64 cum , Hunder channel 35.64 cum , Kobet channel 136.6 cum , tsogstod channel 71 cum ) |
| 8 | b) Carriage of stone and agg 103.08 cum from a distance of 10 kms . ( Chumik tangmo 103.08 cum , Hunder channel 51.37 cum , Kobet channel 417. 86 cum , tsogstod channel 158.95 cum ) |
| 9 | provision of two steel sluice gate ith complete job.Qty = 2 nos@/nos25000 ( Chumik tangmo 2 nos ) |
| 10 | Chumik tangmo culvert Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations , drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: |
| 11 | Providing and lying-in position of cement concrete of specific grade including of centering and shuttering all work upto plinth level 1:3:6(1cement 3 fine sand 6 graded stone agg.20mm nominal size)1 crushed incl carriage of cement |
| 12 | Reinforced cement concrete work in walls (anythickness), including attached pilasters, buttresses,plinth and string courses, fillets, columns, pillars,piers, abutments’, posts and sturt , etc. up to floorfive level excluding cost of centering, shuttering,finishing and reinforcement incl carriage of cement 1:1.5:3 (1 cement : 1.5 coarse sand : 3graded crushed stone aggregate 20mmnominal size) incl carriage of cement 8 graded stone aggregate 40 mm nominal size) |
| 13 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or moreincl carriage |
| 14 | Centering and shuttering including strutting, propping etc removal of form for: Foundations, footings base of columns etc for mass concrete. |
| 15 | Carriage of material by MT from source to site of work, incl. loading, unloading complete job. |
| 16 | Sand--------5KM |
| 17 | Stone Agg--------5KM Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender