Power Government Departments Closing in 5 days TDR #57930749

Bids Are invited for Custom Bid For Services - Erection Commissioning Of New 11Kv Lt Lines Other Associated Work For Releasing New Connection Under Jhatpat Nivesmitra Other New Connections To Be Passed From Time To Time And Lt 11 33 Kv Line Shifting

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
10 Lakhs
Estimated cost
Bid Submission
23 Oct 2026
5 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Custom Bid For Services - Erection Commissioning Of New 11Kv Lt Lines Other Associated Work For Releasing New Connection Under Jhatpat Nivesmitra Other New Connections To Be Passed From Time To Time And Lt 11 33 Kv Line Shifting In Deposit Scheme.. - (Part-A) Supply & Erection Providing & Fixing Of Top Channel , Providing & Fixing Of Stone Pad , Providing & Fixing Of F Cl With Nut & Bolt , Providing & Fixing Of Ms Angle , Providing & Fixing Of Pg Cl , Providing & Fixing Of I Hook , Providing & Fixing Of Nut And Bolt All Size , Providing & Fixing Of Suspension Cl And Dead & Cl , Providing & Fixing Of Danger Board With Cl & Bolts & Nuts , Providing & Fixing Of Double Pole Cl , Providing & Fixing Of T- Channel With Cl , Providing & Fixing Of Lt Cl For Pcc Pole , Providing & Fixing Of Number Plate With Cl & Bolts , Providing & Fixing Of Gaurding Cl , Providing & Fixing Cross Arm Holding Cl With Bolts & Nut , Providing & Fixing Of Gaurding Angle , (Part-B) Carrage & Erection Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9.0/11.0/13.0 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) B) Pcc Pole 8.5 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) C) 16 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) D) 25/63 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) E) 100 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) F) Metering Cubical , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) G) 11 Kv Xlpe 3×70/3×120 Sqmm Cable , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) H) Areal Bunch Conductor.16/50/95/120 Sqmm. , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Cl S And Other Line Material, If Required , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Single Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Double Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Single Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Double Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Pole Earthing With Earth Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Fixing Of Earthing Of T/F 16/25/63/100 Kva As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. Acsr Weasal Conductor/Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 11 Kv Xlpe 3×70/3×120 Sqmm Cable. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 16/50/95/120 Sqmm Areal Bunch Conductor. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection A) 16 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection C) 25/63 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection D) 100 Kva T/F. , Making Ht T Off Connection On Existing Mains Labour, T &P And Carrier Etc. Required For Proper Completion Of Work. , Installation Of D.O. Fuse Set On Double Pole , Fixing Of Lt Distribution Boxes On Already Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables By Using Appropriated Alumunium Lugs Tape N & B Provided By Conractor As Per Requirement. , Erection & Commissioning Of Metering Cubical In All Respects As Per Respo Norms And Direction By Supervising Engineer. , Re- Sagging And Stringing Of Abc Conductor, Dog/Recoon & Acsr Weasel Conductor In 11Kv/ /Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work. , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Installation Of 11 Kv Meter Piller Box & Making Connection. , Removal Of 63/100 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Removal Of 16/25 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Dismentling And Removal Of Lt/Ht Line From Existing From Old Ht/Lt Line And Other Screp Line Material Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work.

BOQ

Sl. No. Item TitleItem Description
1(Part-A) Supply & Erection Providing & Fixing of Top Channel(Part-A) Supply & Erection Providing & Fixing of Top Channel
2Providing & Fixing of Stone padProviding & Fixing of Stone pad
3Providing & Fixing of F Clamp with nut & BoltProviding & Fixing of F Clamp with nut & Bolt
4Providing & Fixing of MS AngleProviding & Fixing of MS Angle
5Providing & Fixing of PG ClampProviding & Fixing of PG Clamp
6Providing & Fixing of I HookProviding & Fixing of I Hook
7Providing & Fixing of nut and bolt all sizeProviding & Fixing of nut and bolt all size
8Providing & Fixing of suspension clamp and dead & clampProviding & Fixing of suspension clamp and dead & clamp
9Providing & Fixing of Danger Board with clamp & Bolts & NutsProviding & Fixing of Danger Board with clamp & Bolts & Nuts
10Providing & Fixing of Double pole ClampProviding & Fixing of Double pole Clamp
11Providing & Fixing of T- Channel with clampProviding & Fixing of T- Channel with clamp
12Providing & Fixing of LT Clamp for PCC PoleProviding & Fixing of LT Clamp for PCC Pole
13Providing & Fixing of Number Plate with clamp & BoltsProviding & Fixing of Number Plate with clamp & Bolts
14Providing & Fixing of Gaurding clampProviding & Fixing of Gaurding clamp
15Providing & Fixing Cross Arm Holding Clamp with Bolts & NutProviding & Fixing Cross Arm Holding Clamp with Bolts & Nut
16Providing & Fixing of Gaurding AngleProviding & Fixing of Gaurding Angle
17(Part-B) Carrage & Erection Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9.0/11.0/13.0 Mtr. long(Part-B) Carrage & Erection Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) a) ST pole 9.0/11.0/13.0 Mtr. long
18Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) b) PCC pole 8.5 Mtr. longCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) b) PCC pole 8.5 Mtr. long
19Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) C) 16 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) C) 16 KVA T/F
20Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) D) 25/63 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) D) 25/63 KVA T/F
21Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) E) 100 KVA T/FCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) E) 100 KVA T/F
22Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) F) Metering CubicalCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) F) Metering Cubical
23Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) G) 11 KV XLPE 3×70/3×120 sqmm cableCarriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) G) 11 KV XLPE 3×70/3×120 sqmm cable
24Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) H) Areal Bunch Conductor.16/50/95/120 sqmm.Carriage of following from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) H) Areal Bunch Conductor.16/50/95/120 sqmm.
25Carriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if requiredCarriage of following material from Electricity Store CentreTajganj Agra to dump site through the Kacha and Pakka road including the work of its loading and unloading at the respective ends including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.(Distance 00-70Kms.) J) Line material viz. Weasal conductor/Dog, G.I. earth wire, cross arm, angle, channel, insulators, clamps and other line material, if required
26Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Single Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
27Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) on Double Pole 9/11/13 Mtr. long ST poles including fixing of all accessories for 11 KV line as per RESPO norms.Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
28Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) single Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
29Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.Erection and grouting in 1:2:4 ratio (cement, sand and bricks balast) Double Pole on 8.5 Mtr. long PCC poles including fixing of all accessories for 11 KV/LT Line as per RESPO norms Labour, T &P and carrier, grouting material etc. required for proper completion of work shall be done by the contractor at his own cost.
30Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.Erection and grouting stay of ratio 1:2:4 (cement, sand and bricks balast) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work. Grouting material i.e. cement, sand, brick ballast/stone ballast etc. shall be arranged by the contractor at his own cost.
31Fixing of Pole earthing with earth rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of Pole earthing with earth rod (20x2500mm) as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
32Fixing of earthing of T/F 16/25/63/100 KVA as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.Fixing of earthing of T/F 16/25/63/100 KVA as per RESPO norms including the cost of arrangement of labour, T&P, carrier etc. required for proper completion of work.
33Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. ACSR Weasal conductor/ACSR DOG/Raccon ConductorLaying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. ACSR Weasal conductor/ACSR DOG/Raccon Conductor
34Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. 11 KV XLPE 3×70/3×120 sqmm cable.Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. 11 KV XLPE 3×70/3×120 sqmm cable.
35Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. 16/50/95/120 sqmm Areal Bunch Conductor.Laying sagging stringing and binding and jumpering of conductor in LT line as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work. 16/50/95/120 sqmm Areal Bunch Conductor.
36Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection a) 16 KVA T/F.
37Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25/63 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection c) 25/63 KVA T/F.
38Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F.Mounting of following T/F on existing double pole/single pole & making HT/LT connection D) 100 KVA T/F.
39Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.Making HT 'T' off connection on existing mains labour, T &P and carrier etc. required for proper completion of work.
40Installation of D.O. Fuse set on Double poleInstallation of D.O. Fuse set on Double pole
41Fixing of LT distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.Fixing of LT distribution boxes on already errected pole for giving supply to consumer by connecting consumer cables by using appropriated alumunium lugs tape N & B provided by conractor as per requirement.
42Erection & Commissioning of Metering Cubical in all respects as per RESPO Norms and direction by supervising Engineer.Erection & Commissioning of Metering Cubical in all respects as per RESPO Norms and direction by supervising Engineer.
43Re- sagging and stringing of ABC Conductor, Dog/Recoon & ACSR Weasel conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work.Re- sagging and stringing of ABC Conductor, Dog/Recoon & ACSR Weasel conductor in 11KV/ /LT line as per direction of supervising engineer including the cost of arrangement of labour,T&P, carrier etc. required for proper completion of work.
44Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.Guarding of HT line by laying, stringing, sagging and binding of 2 Nos. parallel GI wire 6 SWG after providing, fabrication and fixing of guarding angle and fabrication and fixing of X-guards (Tillis) of GI wire at distance of 3 Mtr. including the cost of arrangement of abour, T&P etc.required for proper completion of work.
45Installation of 11 KV Meter Piller Box & Making connection.Installation of 11 KV Meter Piller Box & Making connection.
46Removal of 63/100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.Removal of 63/100 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
47Removal of 16/25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.Removal of 16/25 KVA T/F from existing double pole after opening HT/LT connections and their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
48Dismentling and Removal of LT/HT Line from existing From old HT/LT Line and other screp line material their carriage to 132 KV Taj store agra including laodiing and unloading at both end.Dismentling and Removal of LT/HT Line from existing From old HT/LT Line and other screp line material their carriage to 132 KV Taj store agra including laodiing and unloading at both end.
49Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.Cutting of kharanja/mettalic road/concrete portion while digging pit for erection of PCC/STP poles, stays rod and giving the exact shape after exicution work as per direction of supervising engineer. It includes the cost of labour, T & P, carrier etc reauired for proper completion of work.

AI Tender Summary

OUR REF NO 57930749
AUTHORITY Government Departments
TENDER VALUE 10 Lakhs
LAST DATE 23-10-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Custom Bid For Services - Erection Commissioning Of New 11Kv Lt Lines Other Associated Work For Releasing New Connection Under Jhatpat Nivesmitra Other New Connections To Be Passed From Time To Time And Lt 11 33 Kv Line Shifting In Deposit Scheme.. - (Part-A) Supply & Erection Providing & Fixing Of Top Channel , Providing & Fixing Of Stone Pad , Providing & Fixing Of F Cl With Nut & Bolt , Providing & Fixing Of Ms Angle , Providing & Fixing Of Pg Cl , Providing & Fixing Of I Hook , Providing & Fixing Of Nut And Bolt All Size , Providing & Fixing Of Suspension Cl And Dead & Cl , Providing & Fixing Of Danger Board With Cl & Bolts & Nuts , Providing & Fixing Of Double Pole Cl , Providing & Fixing Of T- Channel With Cl , Providing & Fixing Of Lt Cl For Pcc Pole , Providing & Fixing Of Number Plate With Cl & Bolts , Providing & Fixing Of Gaurding Cl , Providing & Fixing Cross Arm Holding Cl With Bolts & Nut , Providing & Fixing Of Gaurding Angle , (Part-B) Carrage & Erection Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) A) St Pole 9.0/11.0/13.0 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) B) Pcc Pole 8.5 Mtr. Long , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) C) 16 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) D) 25/63 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) E) 100 Kva T/F , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) F) Metering Cubical , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) G) 11 Kv Xlpe 3×70/3×120 Sqmm Cable , Carriage Of Following From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) H) Areal Bunch Conductor.16/50/95/120 Sqmm. , Carriage Of Following Material From Electricity Store Centretajganj Agra To Dump Site Through The Kacha And Pakka Road Including The Work Of Its Loading And Unloading At The Respective Ends Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work.(Distance 00-70Kms.) J) Line Material Viz. Weasal Conductor/Dog, G.I. Earth Wire, Cross Arm, Angle, Channel, Insulators, Cl S And Other Line Material, If Required , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Single Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) On Double Pole 9/11/13 Mtr. Long St Poles Including Fixing Of All Accessories For 11 Kv Line As Per Respo Norms.Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Single Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting In 1:2:4 Ratio (Cement, Sand And Bricks Balast) Double Pole On 8.5 Mtr. Long Pcc Poles Including Fixing Of All Accessories For 11 Kv/Lt Line As Per Respo Norms Labour, T &P And Carrier, Grouting Material Etc. Required For Proper Completion Of Work Shall Be Done By The Contractor At His Own Cost. , Erection And Grouting Stay Of Ratio 1:2:4 (Cement, Sand And Bricks Balast) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. Grouting Material I.E. Cement, Sand, Brick Ballast/Stone Ballast Etc. Shall Be Arranged By The Contractor At His Own Cost. , Fixing Of Pole Earthing With Earth Rod (20X2500mm) As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Fixing Of Earthing Of T/F 16/25/63/100 Kva As Per Respo Norms Including The Cost Of Arrangement Of Labour, T&P, Carrier Etc. Required For Proper Completion Of Work. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. Acsr Weasal Conductor/Acsr Dog/Raccon Conductor , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 11 Kv Xlpe 3×70/3×120 Sqmm Cable. , Laying Sagging Stringing And Binding And Jumpering Of Conductor In Lt Line As Per Respo Manual And As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work. 16/50/95/120 Sqmm Areal Bunch Conductor. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection A) 16 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection C) 25/63 Kva T/F. , Mounting Of Following T/F On Existing Double Pole/Single Pole & Making Ht/Lt Connection D) 100 Kva T/F. , Making Ht T Off Connection On Existing Mains Labour, T &P And Carrier Etc. Required For Proper Completion Of Work. , Installation Of D.O. Fuse Set On Double Pole , Fixing Of Lt Distribution Boxes On Already Errected Pole For Giving Supply To Consumer By Connecting Consumer Cables By Using Appropriated Alumunium Lugs Tape N & B Provided By Conractor As Per Requirement. , Erection & Commissioning Of Metering Cubical In All Respects As Per Respo Norms And Direction By Supervising Engineer. , Re- Sagging And Stringing Of Abc Conductor, Dog/Recoon & Acsr Weasel Conductor In 11Kv/ /Lt Line As Per Direction Of Supervising Engineer Including The Cost Of Arrangement Of Labour,T&P, Carrier Etc. Required For Proper Completion Of Work. , Guarding Of Ht Line By Laying, Stringing, Sagging And Binding Of 2 Nos. Parallel Gi Wire 6 Swg After Providing, Fabrication And Fixing Of Guarding Angle And Fabrication And Fixing Of X-Guards (Tillis) Of Gi Wire At Distance Of 3 Mtr. Including The Cost Of Arrangement Of Abour, T&P Etc.Required For Proper Completion Of Work. , Installation Of 11 Kv Meter Piller Box & Making Connection. , Removal Of 63/100 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Removal Of 16/25 Kva T/F From Existing Double Pole After Opening Ht/Lt Connections And Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Dismentling And Removal Of Lt/Ht Line From Existing From Old Ht/Lt Line And Other Screp Line Material Their Carriage To 132 Kv Taj Store Agra Including Laodiing And Unloading At Both End. , Cutting Of Kharanja/Mettalic Road/Concrete Portion While Digging Pit For Erection Of Pcc/Stp Poles, Stays Rod And Giving The Exact Shape After Exicution Work As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T & P, Carrier Etc Reauired For Proper Completion Of Work.
Basic Detail
Tender No GEM/2026/B/8108743
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 08 Oct 2026
Submission Date 23 Oct 2026
Open Date 24 Oct 2026
Finance
Tender Value 10 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
06bb0401-1994-4f00-9f0b-a329b55d2c47.pdf
1790851740.xlsx
1790850854.pdf
1790850861.pdf
1790850870.pdf
1790850872.pdf
1790850877.pdf
1790850880.pdf
1790850894.pdf
1790851361.pdf
1790851546.pdf
allatc_2816dbf7-f54d-4cc9-9a281790852024329_EDC2FATEHABADBUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 23, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Oct 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
pdf

06bb0401-1994-4f00-9f0b-a329b55d2c47.pdf

xlsx

1790851740.xlsx

pdf

1790850854.pdf

pdf

1790850861.pdf

pdf

1790850870.pdf

pdf

1790850872.pdf

pdf

1790850877.pdf

pdf

1790850880.pdf

pdf

1790850894.pdf

pdf

1790851361.pdf

pdf

1790851546.pdf

pdf

allatc_2816dbf7-f54d-4cc9-9a281790852024329_EDC2FATEHABADBUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender