Tender For Construction Of Community Soak Pits Head Of Arakasanahalli Panchayat. No Of Work -7 (1 Csp - Rs.19000/-)
Tender Value
1.33 Lakhs
Estimated cost
Bid Submission
21 Oct 2026
11 days left
EMD
1330
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Dharmapuri → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Construction Of Community Soak Pits Head Of Arakasanahalli Panchayat. No Of Work -7 (1 Csp - Rs.19000/-)
BOQ
| Sl. No. | Item Description |
| 1 | Construction of Community Soak Pits H/o Arakasanahalli Panchayat. No Of Work -1(1 CSP - Rs.19000/-) |
| 2 | Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 3 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 4 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 5 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 6 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 7 | Filling the soak pit with 225 mm boulders as per specification |
| 8 | Filling the soak pit with 63/65mm metal as per specification |
| 9 | Filling the soak pit with 20mm metal as per specification |
| 10 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 11 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 12 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 13 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 14 | Provision for name board charges |
| 15 | No Of Work -2Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 16 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 17 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 18 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 19 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 20 | Filling the soak pit with 225 mm boulders as per specification |
| 21 | Filling the soak pit with 63/65mm metal as per specification |
| 22 | Filling the soak pit with 20mm metal as per specification |
| 23 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 24 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 25 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 26 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 27 | Provision for name board charges |
| 28 | No Of Work -3Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 29 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 30 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 31 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 32 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 33 | Filling the soak pit with 225 mm boulders as per specification |
| 34 | Filling the soak pit with 63/65mm metal as per specification |
| 35 | Filling the soak pit with 20mm metal as per specification |
| 36 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 37 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 38 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 39 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 40 | Provision for name board charges |
| 41 | No Of Work -4Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 42 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 43 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 44 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 45 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 46 | Filling the soak pit with 225 mm boulders as per specification |
| 47 | Filling the soak pit with 63/65mm metal as per specification |
| 48 | Filling the soak pit with 20mm metal as per specification |
| 49 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 50 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 51 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 52 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 53 | Provision for name board charges |
| 54 | No Of Work -5Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 55 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 56 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 57 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 58 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 59 | Filling the soak pit with 225 mm boulders as per specification |
| 60 | Filling the soak pit with 63/65mm metal as per specification |
| 61 | Filling the soak pit with 20mm metal as per specification |
| 62 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 63 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 64 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 65 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 66 | Provision for name board charges |
| 67 | No Of Work -6Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 68 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 69 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 70 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 71 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 72 | Filling the soak pit with 225 mm boulders as per specification |
| 73 | Filling the soak pit with 63/65mm metal as per specification |
| 74 | Filling the soak pit with 20mm metal as per specification |
| 75 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 76 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 77 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 78 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 79 | Provision for name board charges |
| 80 | No Of Work -7Earthwork Excavation in Hard Soil - Earthwork excavating and depositing with in initial lead of 10m and lift of 2m (For roads, supply channels, desilting of MI Tanks, Pond & Kulam) - upto 0.30m depth |
| 81 | Cement mortar 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying, and curing etc complete for 10 cum |
| 82 | Brick work in cement mortar 1:5 mix using country bricks 83/4\\"x41/4\\"x23/4\\" and conveyance of all materials to site and all labour charges etc complete |
| 83 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc |
| 84 | Colour washing two coats using approved colour pigments including cost and conveyance of all materials to site and all labour charges etc complete |
| 85 | Filling the soak pit with 225 mm boulders as per specification |
| 86 | Filling the soak pit with 63/65mm metal as per specification |
| 87 | Filling the soak pit with 20mm metal as per specification |
| 88 | Supply of 0.60m dia cement tank with top cover including cost etc., |
| 89 | Towards labour charges for filling metal into the pipe and fixing PVC pipe etc complete., |
| 90 | Supply of 0.45m x0.45m x 0.45m size cement tnak with Cover slab etc. |
| 91 | Supply of PVC pipes 50mm dia with all labour charges etc complete |
| 92 | Provision for name board charges |
| 93 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 21, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysOct 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 11 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender