Tender For Annual Maintenance Contract (Amc) For Rewinding/ Repairing Of Electrical Motors (Ac/ Dc Motors) In Various Plants And Support Services At Skims Soura.
Tender Value
7 Lakhs
Estimated cost
Bid Submission
14 Oct 2026
0 days left
EMD
14000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Srinagar → Jammu and Kashmir
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Annual Maintenance Contract (Amc) For Rewinding/ Repairing Of Electrical Motors (Ac/ Dc Motors) In Various Plants And Support Services At Skims Soura.
BOQ
| Sl. No. | Item Description |
| 1 | Complete rewinding of Horizontal motor after removing the motor pump assembly and then dismantling of damaged 3 phase Horizontal motor and loading/unloading for transportation to workshop for conducting necessary repairs and back. The job includes extraction of damaged Copper wire and rewinding by way of using new Copper wire of proper gauge and turns.The job includes applying two coats of varnish and providing and fitting of crimpling sheet, cotton rolls, PVC sleeves etc as required. All sundry items including greasing, nuts, bolts, keys, gaskets, cleaning clothes, safety items, tools, tackles etc are to be arranged by the firm. The job also includes reinstallation of motor at the requisite site and re-connecting to power and testing on no load and full load. The rates are inclusive of old copper scrap and will be retained by the contractor/firm. |
| 2 | 02 HP, 980 rpm,440 V, 50 Hz Three phase |
| 3 | 02 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 4 | 02 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 5 | 03 HP, 980 rpm,440 V, 50 Hz Three phase |
| 6 | 03 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 7 | 03 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 8 | 05 HP, 980 rpm,440 V, 50 Hz Three phase |
| 9 | 05 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 10 | 05 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 11 | 7.5 HP, 980 rpm,440 V, 50 Hz Three phase |
| 12 | 7.5 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 13 | 7.5 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 14 | 10 HP, 980 rpm,440 V, 50 Hz Three phase |
| 15 | 10 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 16 | 10 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 17 | 12.5 HP, 980 rpm,440 V, 50 Hz Three phase |
| 18 | 12.5 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 19 | 12.5 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 20 | 15 HP, 980 rpm,440 V, 50 Hz Three phase |
| 21 | 15 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 22 | 15 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 23 | 17.5 HP, 980 rpm,440 V, 50 Hz Three phase |
| 24 | 17.5 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 25 | 17.5 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 26 | 20 HP, 980 rpm,440 V, 50 Hz Three phase |
| 27 | 20 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 28 | 20 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 29 | 100 HP, 980 rpm,440 V, 50 Hz Three phase |
| 30 | 100 HP, 1440 rpm,440 V, 50 Hz Three phase |
| 31 | 100 HP, 2800 rpm,440 V, 50 Hz Three phase |
| 32 | Providing and fitting of PVC/Plastic motor cooling fan.The job includes dismantling and removal of existing damaged fan and fitting of new fan (compatible with the existing motor). The job also includes shifting of damaged fan to store against proper receipt. |
| 33 | 02 HP |
| 34 | 03 HP |
| 35 | 05 HP |
| 36 | 7.5 HP |
| 37 | 10 HP |
| 38 | 12.5 HP |
| 39 | 15 HP |
| 40 | 17.5 HP |
| 41 | 20 HP |
| 42 | 100 HP |
| 43 | Rebuilding of worn or damaged Bearing Seat of the Horizontal motor.The job includes machining/rebuilt of bearing seat surface with improved surface finish and accuracy .The job further includes reassembly and alignment of bearing seats. |
| 44 | 02 HP |
| 45 | 03 HP |
| 46 | 05 HP |
| 47 | 7.5 HP |
| 48 | 10 HP |
| 49 | 12.5 HP |
| 50 | 15 HP |
| 51 | 17.5 HP |
| 52 | 20 HP |
| 53 | 100 HP |
| 54 | Providing and fitting of Ball Bearing of following bearing Numbers. The job includes dismantling and removal of existing damaged bearing and fitting of new ball bearing along with application of lubricant/greasing . The job also includes shifting of damaged bearing to store against proper receipt. |
| 55 | bearing 6205 |
| 56 | bearing6206 |
| 57 | bearing6207 |
| 58 | bearing6208 |
| 59 | bearing6209 |
| 60 | bearing6305 |
| 61 | bearing6306 |
| 62 | bearing6307 |
| 63 | bearing6308 |
| 64 | bearing6309 |
| 65 | bearing6310 |
| 66 | bearing6311 |
| 67 | bearing 6317 |
| 68 | Providing, fitting of below mentioned item for repairs to 05KVA single Phase Automatic Voltage Stabilizer including extraction of damaged items, transportation, loading, unloading, shifting back and then fitting and successful testing on no and full load at site.The job also includes shifting of damaged item to store against proper receipt. |
| 69 | Aluminium coil of specific gauge and size as per requirement |
| 70 | Control card with display complete (relay range 30 A.) |
| 71 | Control card with display complete (relay range 40 A.) |
| 72 | Complete rewinding of one of the Phase Coil of 3-phase AVR/ servo stabilizer of below mentioned ratings by required rating copper wiring/strip in place of damaged/burnt one. The strip (winding) of the Phase coil shall be carried out as per existing pitch. The job includes Disconnecting of all the electrical connections of the 3-phase AVR/ servo stabilizer and disassembling of the servo with the help of tools and tackles. The job further includes lifting of the core assembly of the servo with the help of chain pulley block. The job further includes inspection of the moving parts of the servo stabilizer and to ensure balancing of the moving parts, replacement of the damaged bushes with the new ones after replacement all the damaged wiring . The job includes testing of the same on no load and full load.The rates are inclusive of old copper scrap and will be retained by the contractor/firm. |
| 73 | 10 KVA |
| 74 | 15 KVA |
| 75 | 20 KVA |
| 76 | 25 KVA |
| 77 | 30 KVA |
| 78 | Complete rewinding of 10KVA single phase AVR/ servo stabilizer by required rating copper wiring/strip in place of damaged/burnt one. The strip (winding) shall be carried out as per existing pitch. The job includes Disconnecting of all the electrical connections of the single phase AVR/ servo stabilizer capacity and disassembling of the servo with the help of tools and tackles. The job further includes lifting of the core assembly of the single phase AVR/servo with the help of chain pulley block. The job further includes inspection of the moving parts of the servo stabilizer and to ensure balancing of the moving parts, replacement of the damaged bushes with the new ones after replacement all the damaged wiring . The job includes testing of the same on no load and full load.The rates are inclusive of old copper scrap and will be retained by the contractor/firm. |
| 79 | Microprocessor Control card for 10 KVA single phase AVR/ servo stablizer complete .The job also includes shifting of damaged card to store against proper receipt. |
| 80 | Digital control card for servo stablizer for the following mentioned ratings.The job also includes shifting of damaged card to store against proper receipt. |
| 81 | 10 KVA |
| 82 | 15 KVA |
| 83 | 20 KVA |
| 84 | 25 KVA |
| 85 | 30 KVA |
| 86 | Control card complete for Automatic voltage Stablizer (AVS) for the below mentioned capacities.The job also includes shifting of damaged card to store against proper receipt. |
| 87 | 10 KVA |
| 88 | 15 KVA |
| 89 | 20 KVA |
| 90 | Providing and fitting of new dimmerstat in place of damaged dimmer for the servo voltage stablizer of the following amperage along with copper wire .The job also includes shifting of damaged dimmerstat to store against proper receipt. |
| 91 | 20 Ampere |
| 92 | 28 Ampere |
| 93 | 32 Ampere |
| 94 | 40 Ampere |
| 95 | 60 Ampere |
| 96 | Electro magnetic Relay of the below mentioned capacities.The job also includes shifting of damaged relay to store against proper receipt. |
| 97 | 60 Ampere |
| 98 | 100 Ampere |
| 99 | 150 Ampere |
| 100 | Providing and filling of T-oil of specific grade to AVR/ voltage stablizer upto required level. |
| 101 | Complete rewinding of Submersible motor after removing the motor-pump assembly and dismantling of the damaged 3-phase Submersible motor, including loading/unloading for transportation to the workshop for carrying out necessary repairs and back. The job includes extraction of the damaged copper wire and complete rewinding using new copper wire of proper gauge, size and requisite number of turns. The job also includes application of two coats of suitable insulating varnish and providing and fitting of crimping sheet, cotton rolls, PVC sleeves etc. as required. All sundry items including greasing, nuts, bolts, keys, gaskets, cleaning cloth, safety items, tools, tackles etc. shall be arranged by the firm. The job also includes coupling of the pump-motor assembly, lowering back at the requisite site, reconnection to power supply and testing on no-load and full-load conditions. The rates are inclusive of old copper scrap and the same shall be retained by the contractor/firm. |
| 102 | 7.5 HP |
| 103 | 10 HP |
| 104 | 12.5 HP |
| 105 | 15 HP |
| 106 | P/F of Thrust Bearing (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 107 | 1 HP (Submersible) |
| 108 | 2 HP (Submersible) |
| 109 | 3 HP (Submersible) |
| 110 | 5 HP (Submersible) |
| 111 | 7.5 HP (Submersible) |
| 112 | 10 HP (Submersible) |
| 113 | 12.5 HP (Submersible) |
| 114 | 15 HP (Submersible) |
| 115 | P/F of Radial Bearing (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 116 | 1 HP (Submersible) |
| 117 | 2 HP (Submersible) |
| 118 | 3 HP (Submersible) |
| 119 | 5 HP (Submersible) |
| 120 | 7.5 HP (Submersible) |
| 121 | 10 HP (Submersible) |
| 122 | 12.5 HP (Submersible) |
| 123 | 15 HP (Submersible) |
| 124 | P/F of Seal and Allied Items (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 125 | 1 HP (Submersible) |
| 126 | 2 HP (Submersible) |
| 127 | 3 HP (Submersible) |
| 128 | 5 HP (Submersible) |
| 129 | 7.5 HP (Submersible) |
| 130 | 10 HP (Submersible) |
| 131 | 12.5 HP (Submersible) |
| 132 | 15 HP (Submersible) |
| 133 | P/F of Rotor Shaft SS (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 134 | 1 HP (Submersible) |
| 135 | 2 HP (Submersible) |
| 136 | 3 HP (Submersible) |
| 137 | 5 HP (Submersible) |
| 138 | 7.5 HP (Submersible) |
| 139 | 10 HP (Submersible) |
| 140 | 12.5 HP (Submersible) |
| 141 | 15 HP (Submersible) |
| 142 | P/F of Connection Plate (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 143 | 1 HP (Submersible) |
| 144 | 2 HP (Submersible) |
| 145 | 3 HP (Submersible) |
| 146 | 5 HP (Submersible) |
| 147 | 7.5 HP (Submersible) |
| 148 | 10 HP (Submersible) |
| 149 | 12.5 HP (Submersible) |
| 150 | 15 HP (Submersible) |
| 151 | P/F of GM bush (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 152 | 1 HP (Submersible) |
| 153 | 2 HP (Submersible) |
| 154 | 3 HP (Submersible) |
| 155 | 5 HP (Submersible) |
| 156 | 7.5 HP (Submersible) |
| 157 | 10 HP (Submersible) |
| 158 | 12.5 HP (Submersible) |
| 159 | 15 HP (Submersible) |
| 160 | P/F of Ratchet Plate (as per sample) after removal of the damaged part. The extracted part shall be returned to the SKIMS Stores. |
| 161 | 1 HP (Submersible) |
| 162 | 2 HP (Submersible) |
| 163 | 3 HP (Submersible) |
| 164 | 5 HP (Submersible) |
| 165 | 7.5 HP (Submersible) |
| 166 | 10 HP (Submersible) |
| 167 | 12.5 HP (Submersible) |
| 168 | 15 HP (Submersible) |
| 169 | Complete rewinding of the single-phase Submersible motor after removing and extracting the complete motor-pump assembly from the well, including removal of column pipes and all connected accessories, dismantling of the damaged single-phase Submersible motor, and loading/unloading and transportation of the motor to the workshop and back for carrying out necessary repairs. The job includes extraction of damaged copper wire and complete rewinding using new copper wire of proper gauge, size and requisite number of turns, application of two coats of suitable insulating varnish, and providing and fitting of crimping sheet, cotton rolls, PVC sleeves, etc., as required. All sundry items including greasing, nuts, bolts, keys, gaskets, cleaning cloth, safety items, tools, tackles, etc., shall be arranged by the firm. After completion of rewinding and repairs, the motor shall be properly assembled and coupled with the pump and tested on no-load conditions; after successful no-load testing, the complete pump-motor assembly shall be lowered back into the well along with column pipes, submersible cable, nuts, bolts, rubber insertion, cable clamps, PVC strings, etc., and all necessary accessories, followed by testing on full-load conditions and successful commissioning of the submersible pump set. The rates shall be inclusive of all labour, transportation, loading/unloading, dismantling, rewinding, testing, lowering, installation, commissioning and all incidental/sundry items required for completion of the work, and shall also be inclusive of the value of old copper scrap, which shall be retained by the contractor/firm. |
| 170 | 1 HP (Submersible) |
| 171 | 1.5 HP (Submersible) |
| 172 | 2 HP (Submersible) |
| 173 | Disassembling and extraction of submersible pumping units of 3 HP to 12.5 HP, including removal of 10 feet long column pipes each, along with disassembling of all accessories, connections, fittings, etc. at the discharge head. |
| 174 | Lowering and installation of submersible pump sets of 3 HP to 12.5 HP, including pump, motor, 10 feet long column pipes, submersible cable, nuts, bolts, rubber insertion, cable clamps, PVC strings (03 Nos. to each pipe length), filling of coolant in the motor, testing and coupling of pump and motor, reassembling of all disassembled accessories and fittings at the discharge head, along with testing and successful commissioning of the complete submersible pump set. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 08, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 14, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
CompletedOct 14, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender