Tender For Construction Of Temporary 11 Kv, Lt Line, Installation Of Distribution Transformer, Street Light Fitting Connection And C Connection Etc. For Emergency Works/V.I.P. Visits In Magh Mela, Arail Area During Year 2026-27 Under Eucd-I, Prayagra
Tender Overview
Project Description
Tender for Construction Of Temporary 11 Kv, Lt Line, Installation Of Distribution Transformer, Street Light Fitting Connection And C Connection Etc. For Emergency Works/V.I.P. Visits In Magh Mela, Arail Area During Year 2026-27 Under Eucd-I, Prayagraj.
BOQ
| Sl. No. | Item Description |
| 1 | Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Superintending Engineer, E.U.D.C.-I, Prayagraj Name of Work: Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting Connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Magh Mela, Arail area during Year 2026-27 under EUCD-I, Prayagraj. Contract No : 67/SE/EUDC-I-Pra/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Work Description Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without Taxes inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 2 | Construction of Temporary 11 KV, LT Line, Installation of Distribution Transformer, Street Light fitting connection and Camp Connection etc. for Emergency works/V.I.P. Visits in Arail area during year 2026-27, which includes loading, carriage and unloading of materials from Naini store to work site and work site to Naini store, alongwith dismantling of line after work completion. |
| 3 | Construction of Temporary 11 KV overhead Line from nearest 11 kv tapping point on STP 11 Mtr. long after erection of pole by ACSR weasel/Dog conductor with proper guarding (min 6 No. latching per span) and its earthing. |
| 4 | Maintenance of 11 KV overhead line by providing maintenance gang round the clock at occasion. |
| 5 | Laying of 11 KV 3x185 mm2 XLPE Cable in Mela area. |
| 6 | Making of 11 Kv outdoor box 3x185 Sq mm(outdoor box will be provided by the contractor) |
| 7 | Dismantling of 11 KV overhead Line after completion of occasion and receive back complete line from work site to store Naini. |
| 8 | Construction of T/f plinth of size 1.5x1.5.x1.25 Mtr. with Ist class bricks of 0.95 meter height and 0.35 meter thick wall will be constructed. Rest wall should be 0.23 meter thickness. brick work will be in ratio of 1:4 Cement and sand. In the hollow portion the sand should be filled from ground level upto 15 cm. below from the top of plinth. The cement, sand and stone ballast should be placed in ratio 1:2:4 and 2 nos. channels be grouted in the concrete. The T/f plinth should be plastered on all sides by 12mm thick in 1:6 Cement, and mortar. |
| 9 | Construction of double pole structure on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/angles/G.O ,plinthing and earthing etc., as per requirement. |
| 10 | Construction of double pole for 100 KVA Substation on S.T.P. 11Mtr. long including cutting fabrication and fitting of channels/ angles,D.O.,G.O.,painting and earthing etc.Installation of 100 KVA Transformer on DP, earthing of transformer body and neutral. alongwith dismantling after completion of Mela period. |
| 11 | Installation of 400 KVA Transformer on plinth and making all HT/LT connections from transformer to L.T Tailless unit and earthing of transformer. |
| 12 | Installation of Tailless Unit by providing structure of channels with the help of 2/3 meter long M.S. Channel including mounting of 06 Nos. Tailless Unit 500/300 Amps. Also making of copper bus bar and its tapping, and earthing of structure by earth rod at two Point |
| 13 | Operation and maintenance of above 11/0.4 KV, 2x400 KVA substation, round the clock from the date of energisation with the help of skilled operating staff (Operating Staff will be provided by the contractor). Two skilled manpower must be in each shift and minimum 3 shifts must be performed everyday) |
| 14 | Fixing of Fire bucket stand with four nos. buckets including its grouting and two no fire extinguisher at various sub-station in Mela area. |
| 15 | Laying of L.T. PVC cable 3.5x400 sq mm or equivalent size which also include maintenance and dismantling of cable after Mela. |
| 16 | Laying of L.T. PVC Cable 3 ½ x240/150 sq. mm. or equivalent size inside sand, which also includes maintenance and dismantling of cable after Mela. |
| 17 | Laying/hanging of L.T. cable 3.5x70 Sq mm or equivalent size cable from transformer to L.T. line in Mela area. |
| 18 | Laying/hanging of L.T. cable 4X16sqmm/4X25 Sq mm or equivalent size cable from transformer to L.T. line in Mela area. |
| 19 | Laying of LT Cable 2X4/2X10 Sq mm. for 24 Hrs connection. |
| 20 | Construction of L.T. line single phase 4 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 No. latching per span on main roads and 4 No. latching per span in other area) & earthing of poles. |
| 21 | Maintenance of L.T. Line single phase, 4 wire by providing maintenance gang round the clock at occasion. |
| 22 | Dismantling of L.T. line single phase, 4 wire after completion of Mela period or As per instruction of mela administration and carriage back complete line material to Mela store. |
| 23 | Construction of L.T. line Threee phase 6 wire by ACSR weasel/Dog conductor after erection of 9 Mtr. long S.T.P. alongwith guarding with the help of 6/8 SWG G.I. wire (minimum 6 nos latching per span ) & earthing of every tenth poles. |
| 24 | Maintenance of L.T. Line Three phase, 6 wire by providing maintenance gang for complete Mela Period or As per instruction of mela administration (Contractor will provide minimum 6 persons round the clock for maintanance) |
| 25 | Dismantling of L.T. line Three phase 6 wire after completion of Mela period or As per instruction of mela administration and carriage back complete line material to Mela store. |
| 26 | Mounting & fixing of LED 250 W/160W/110 W/70 Watt Street light fitting or equivalent L.E.D. fitting, on erected S.T.P. in proper position with bracket and clamps and making electrical connection. This also includes maintenance of street light fitting and replacement of fittings during the Mela period, dismantling of the fittings after Mela. (Street light fitting, Bracket and Clamps will be provided by the department). |
| 27 | Carriag & installation of 63/125 KVA DG Set in Mela Area (D.G. Set will be provided by the department and diesel, operation and maintenance will be provided by the contractor at his own cost). |
| 28 | Providing camp connection with M.C.B. and conduit in camp. (All material provide by contractors). |
| 29 | 14 watt led with conduit wiring |
| 30 | 20 watt tube rod fitting with conduit wiring |
| 31 | 20Watt rechargable LED light with conduit wiring |
| 32 | Providing 5 Amp Socket with switch Point connection (Standard make ISI approved) For Charging Mobile/ Battery for communication on rental basis. |
| 33 | Installation of Distribution board of size 2.5'x2' on wooden board with cutout of 200/100/63 amp as per requirement of site for three phase along with neutral link on rental basis. The distribution board should be fixed on iron angle frame at the height of 5' from ground level. |
| 34 | Installation of Single Phase/Three Phase (as per requirement) Distribution board having capacity of 32/16/5 amp on wooden/PVC board on rental basis. |
| 35 | Painting of ST pole in Mela area. (Existing & New erected) |
| 36 | Operation & mainantance of High mast mobile generator during mela period (i.e 01.08.26 to 30.11.26) with its carriage from naini store to entire mela area as per requirement/ instruction by department.(Diesel will be provided by the contractor) |
| 37 | Electrification of mela area (chhat puja & dev dipawali) on 12Ft Bamboo and Balli in proper span in mela area by providing and installation of LED Bulb/Tube Rod on Balli and its wiring and connection with nearest LT line for proper illumination in mela area on rental basis.(All materials will provided by Contractor on rental basis) |
| 38 | Providing and fixing of electrically insulated flex sheet in sangam area on Rental Basis (as per design provided by department). Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender