| Sl. No. | Item Description |
| 1 | ERECTION PART of New 11 kV HT line |
| 2 | Erection of PCC Single Pole 9 Mtr. Long:- Digging of Pit fixing of insulator and drilling of holes in X-Arm , Bracing Set, Top Clamp, errection of pole, fixing of barbed wire and danger plate, filling of Pit and ramming, painting of poles complete in all respect. |
| 3 | Erection of Earthing Set HT:- Fixing of earthing pipe of pit for coal earthing, fixing of G.I wire to system filling of pit and remaning work complete in all respect. |
| 4 | Erection of Stay Set HT:- Digging of Pit fixing of Stay Rod, filling of Pit, Nozeiling & Tightning complete in all respect. |
| 5 | Stringing and sagging conductor:- Laying of conductor stringing and sagging, binding with insulator complete in all respect. |
| 6 | Laying of G.I Wire, Stringing, Sagging and binding complete in all respect.(Duble wire) |
| 7 | Fixing jumper complete in all respect. |
| 8 | Add Inspection Charges of HT/LT /DTR. |
| 9 | Mannual carriage of material at destination site. |
| 10 | HT Line |
| 11 | Prov. STP Pole 9 mtr long. ( Qty.:- 2 , Unit :- No. Provided by HPSEBL) |
| 12 | Prov, RCC Muffs (2000mm) with concerete filling. Qty.:- 2 , Unit :- No. Provided by HPSEBL). |
| 13 | Prov. ACSR 6/1/2.59 (30 mm²) i/c 3% cutting,wastage & sagging ( Qty. - 0.587 Km, Provided by HPSEBL ) |
| 14 | Prov. G.I.Wire No.8 SWG for earth ( 1.01 kms ). |
| 15 | Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm |
| 16 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
| 17 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
| 18 | X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No. |
| 19 | X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length: 2340 mm x 2 No.] Δ Formation |
| 20 | Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No. |
| 21 | Stay set complete in all respect (4No. / Dead Structure & 2 No./Run Thro.) |
| 22 | Stay Wire (7/3.15 mm) (10 kg Per Stay Set) . |
| 23 | HT Earthing set complete. ( Provided by HPSEBL Qty. - 1 No ) . |
| 24 | Eye Hook for earth wire |
| 25 | Half clamps |
| 26 | Full clamps: |
| 27 | 11 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure . |
| 28 | Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps,straight stapples & Bend Stapples etc.) x (3 No. conductors ) x (2 No. sides) |
| 29 | MS Angle Iron 50x50x6, Length: 2800 mm |
| 30 | Danger Plate (250X200X1.6 mm). |
| 31 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ |
| 32 | Barbed Wire |
| 33 | Aluminium Paint. |
| 34 | ERECTION PART of New 3-Ph LT line |
| 35 | Erection of LT line. Digging of pit, errection of PCC pole 8 mtr.long, errection of C.I X-arm, Shakle insulators, D-iron and filling of pit and remming etc complete in all respect. |
| 36 | Erection of stay Set.:- Digging of pit of stay, fixing of stay rod, noziling and tightening and filling of pit ramming etc.complete in all respect. |
| 37 | Earthing:- Digging of pit, fixing of G.I wire to the earthing system and filling of pit and raiming etc.complete in all respect. |
| 38 | Laying of conductor:- Laying of conductor, striging, sagging and biding with insulator with 7/3.15 mm Conductor line length =0.258 kms .complete in all respect., |
| 39 | G.I Wire:- Laying of GI wire stringing and sagging and biding with hock etc. complete in all respect. |
| 40 | LT Line |
| 41 | Prov. STP Pole 8 mtr long ( Qty.:- 2, Unit :- No. Provided by HPSEBL) |
| 42 | Prov. RCC Muffs (2000mm) with concerete filling. ( Qty.:- 2, Unit :- No. Provided by HPSEBL) |
| 43 | Prov. AAAC Conductor 7/3.15 mm i/c 3% cutting, wastage & sagging. ( Qty.:- 0.258, Unit :- Kms Provided by HPSEBL) |
| 44 | Prov. G.I.Wire No.8 SWG for earth ( 1.02 kms ). |
| 45 | Prov.M S C.I- X-Arm ( 75X40X 6) 1.50 Mtr. long |
| 46 | Prov.MS Half Clamp (M.S FLATE 50X6mm) |
| 47 | Prov.MS Full Clamp (M.S FLATE 50X6mm) |
| 48 | Prov.Nut-Bolts in kg. |
| 49 | Prov.Shackle Insulators 16 kn with M.S.D-Iron |
| 50 | Prov. Egg. Insulator. |
| 51 | Prov.Earth Knob. |
| 52 | Prov.L.T. Stay Set complete in all respect |
| 53 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
| 54 | Prov.L.T. Earthing set complete in all respect. |
| 55 | Prov.PVC Spacer |
| 56 | Prov. Aluminium Paint |
| 57 | ERECTION PART (Sub-Station).1 Nos |
| 58 | Erection of 11/0.4 KV , 100 KVA S/Stn. Str.:-Digging of Pit for S/T Pole and earthing, drilling of holes in X-arm, preparation of plate form str. Member CI, AI i.e X-arml, Knee bracing set, errection of D-pole,errection of plate form, errcetion of x-Arm, drop out, fuse unit, linghting arrestor, MCCB Switch of LT Box, Energy Meter, Errection of T/F, and earthing conn. to T/F G.O Switch lightning etc. errection of Stay Set, Errection of Jumper, Pipe earthing 3 Nos., Errection of LT cable, brabed wire and painting, 3 Nos. earthing to S/Stn. by prov. 50Kg Salt charcole in each earthing i/c construction of trench for earthing as per REC Board Standard complete in all respect , complete in all respect. |
| 59 | Sub-Station Supply Material |
| 60 | Prov. Distribution Transformer (Ordinary), 11/0.4 kV, 100 KVA ( Qty.:- 1 , Unit :- No. Provided by HPSEBL) |
| 61 | Prov. Steel Tubular Poles (9 m, Working Load > 200 kgf/m²) ( Qty.:- 2 , Unit :- No. Provided by HPSEBL) |
| 62 | Prov. RCC Muffs (2000mm) with concerete filling . ( Qty.:- 2 , Unit :- No. Provided by HPSEBL) |
| 63 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] |
| 64 | MS Angle Iron (50X50x6 mm), Length: 2800 x1 Nos for LA's |
| 65 | X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
| 66 | Transformer Bed, Belting & Knee Bracing |
| 67 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed . ( Provided By HPSEBL. Qty.- 2 Nos ). |
| 68 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] ( Provided By HPSEBL. Qty.- 2 Nos ). |
| 69 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos ( Provided By HPSEBL. Qty.- 2 Nos ). |
| 70 | MS Angle Iron (35X35x5 mm), Length : 460 x 2 Nos ( Provided By HPSEBL. Qty.- 2 Nos ). |
| 71 | MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing ( Provided By HPSEBL. Qty.- 2 Nos ). |
| 72 | Transformer LT Dist Box and GO Switch fixing Assembly |
| 73 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
| 74 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
| 75 | GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm |
| 76 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type |
| 77 | D.O Fuse Unit |
| 78 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
| 79 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.) |
| 80 | Stay set complete |
| 81 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) |
| 82 | Pipe Earthing Set |
| 83 | 6 SWG GI wire For Earthing |
| 84 | LT Distribution Panel Box with MCCB(100A, 3P, 35 Ka, ICS = 100 % ICUfsu type) |
| 85 | Half Clamp (M.S. Flat 50X6 mm) |
| 86 | Full Clamps (M.S. Flat 50X6 mm) |
| 87 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)] |
| 88 | Aluminium Thimble |
| 89 | Copper Thimble 35 mm2 |
| 90 | Danger Plate |
| 91 | Barbed Wire |
| 92 | LT Cable (3.5 Core) 95 mm² |
| 93 | LT Cable (3.5 Core) 70 mm² |
| 94 | Red Oxide |
| 95 | Aluminium Paint. |
| 96 | Prov. Chain Link Fencing Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender