Tender For Consultancy Services For Feasibility Study, Preparation Of Detailed Project Report (Dpr), And Providing Of Pre-Construction Activity For Construction Of Highway Tunnel (Toong Tunnel) In Epc Mode Having Starting Portal At Chainage Km 79.60 Of Ga
Tender Overview
Project Description
Tender For Consultancy Services For Feasibility Study, Preparation Of Detailed Project Report (Dpr), And Providing Of Pre-Construction Activity For Construction Of Highway Tunnel (Toong Tunnel) In Epc Mode Having Starting Portal At Chainage Km 79.60 Of Gantok-Chungthang Road And End Potal Near Km 7.50 Of Naga-Toong Road For A Tentative Tunnel Length Of 5.00 Km Including Approach Roads Of 0.400 Km From Naga Side Potal And 0.500 Km On Toong Side Portal On Mangan-Kudyong-Chungthang- Lachung Road Along Nh-310A In The State Of Sikkim Undr Project Swastik Of Bro.
BOQ
| Sl. No. | Item Description |
| 1 | Schedule-A |
| 2 | Estimate of Local Currency CostsI. Remuneration for Local Staff (Including per diem allowance)Professional Staff |
| 3 | Team Leader cum Tunnel Expert |
| 4 | Tunnel Design Expert |
| 5 | Geophysicist |
| 6 | Geotechnical Engineer |
| 7 | E&M Expert |
| 8 | Senior Geologist |
| 9 | Senior Survey Engineer |
| 10 | Environmental Specialist |
| 11 | Tunnel Engineer |
| 12 | Material Engineer |
| 13 | Highway cum Pavement Engineer |
| 14 | Quantity Surveyor/Documentation Expert |
| 15 | Land Auquisiton/Forast clearance Expert |
| 16 | Utility Exoert |
| 17 | Sub-Total-1 |
| 18 | SUB-PROFESSIONAL STAFF :(To be assessed by consultant as per requirement of assignment and one sub professional be a fresh graduate) |
| 19 | Sub-Professional-1 |
| 20 | Sub-Professional-2 |
| 21 | Sub-Professional-3 |
| 22 | Sub-Professional-4 |
| 23 | Sub-Professional-5 |
| 24 | Sub-Professional-6 |
| 25 | Sub-Professional-7 |
| 26 | Sub-Professional-8 |
| 27 | Sub-Professional-9 |
| 28 | Sub-Professional-10 |
| 29 | Sub-Total-2 |
| 30 | Total(Sub Total 1 + Sub Total 2) |
| 31 | SUPPORT STAFF |
| 32 | Office Manager |
| 33 | Typist |
| 34 | Office Boy |
| 35 | Night Watch ment |
| 36 | Total: |
| 37 | Transportation (Fixed Costs) Rate/Month |
| 38 | The vehicles provided by the consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc.A. For use of consultants(2x12) |
| 39 | Total: |
| 40 | Duty Travel to Site(Fixed Costs):Note: Rate quoted includes Hotel charges, travel cost etc. complete. |
| 41 | Duty Travel to Site (LS) |
| 42 | Total: |
| 43 | Office Rent (Fixed Costs)The rent cost includes maintenance, cleaning, repairing etc. (Rate per Month) |
| 44 | Office Rent (Fixed Costs) |
| 45 | Total: |
| 46 | OFFICE SUPPLIES, UTILITIES AND COMMUNICATIONS (Fixed Costs)Rate/Month |
| 47 | Office Supplies |
| 48 | Drafting Supplies |
| 49 | Computer Running Costs |
| 50 | Domestic and International Communication |
| 51 | Total: |
| 52 | OFFICE FURNITURE AND EQUIPMENT (Rental) |
| 53 | Office Furniture and Ecquipment (LS) |
| 54 | Total: |
| 55 | REPORTS & DOCUMENTS PRINTING |
| 56 | Monthly report (3 copies per Month) |
| 57 | Inception report & QAP |
| 58 | Environment and Social Impact Screening Report |
| 59 | Draft Feasibility Report |
| 60 | Final Feasibility Report |
| 61 | Strip Plan with LA Reports |
| 62 | Draft LA and Clearances I Report |
| 63 | Final LA and Clearances I Report |
| 64 | Draft Environmental Assessment Report & RAP |
| 65 | Final Environmental Assessment Report and RAP |
| 66 | Draft Detailed Design Report & Drawings etc. |
| 67 | Draft EMP |
| 68 | Draft Bidding Documents |
| 69 | Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. |
| 70 | Final EMP. |
| 71 | Final Bidding Documents |
| 72 | Draft notification for land acquisition (3 copies each)3(a), 3(b), 3(c) |
| 73 | LA & Clearances II Report |
| 74 | Total: |
| 75 | Survey and Investigation:A. Topographical Survey (Fixed Rate) |
| 76 | Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer. |
| 77 | Detailed topographic surveys using mobile / aerial LiDAR or better Technology |
| 78 | B. Investigation (Fixed Cost) |
| 79 | Road and Bridge Inventory |
| 80 | FWD Test and Pavement Evaluation |
| 81 | Roughness Survey |
| 82 | Axle Load Survey |
| 83 | Material Survey and Investigation |
| 84 | Sub-grade Investigation |
| 85 | Traffice Survey |
| 86 | Socio-economic & Census Survey/Studies |
| 87 | Land Acquisition Studies |
| 88 | Total: |
| 89 | C. Network Survey and GPR |
| 90 | Network Survey of the existing Highways as a repository for civil works as per directions from Authority. |
| 91 | GPR Survey for detection of under ground utilities |
| 92 | Total: |
| 93 | Cost of Supply and Fixing Boundary pillars |
| 94 | Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed atan interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/ or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum ) |
| 95 | Total: |
| 96 | Land Acquisition and Clearances Team including support staff and logistics/ transportation.A. Land Acquisition and Clearances team Team including support staff : |
| 97 | Ex-Land Revenue Inspector/ Officer or equivalent (1*8) |
| 98 | Ex-Kanoogo/Girdwar (1*8) |
| 99 | Ex-Patwari (1*8) |
| 100 | Ttypist (2*8) |
| 101 | Peon (1*8) |
| 102 | Number of Land acquisition Teams (One Only) |
| 103 | Grand Total for All Land acquisition Teams(A) |
| 104 | B. Logistics for Land Acquisition Team |
| 105 | Computer including necessary peripherals (2*8) |
| 106 | Printers (2*8) |
| 107 | Vehicles (Bolero or Equivalent) with monthly running limit of 4000 km (1*8) |
| 108 | Number of Land acquisition Teams (One Only) |
| 109 | Grand Total (B) |
| 110 | Grand Total for All Land acquisition Teams and Logistics (A) + (B) |
| 111 | Note: (i) The consultant shall provide one land acquisition expert along with allied team and supporting logistic as envisaged in clause 5.1.5.1 of TOR for each CALA for stretches proposed for DPR preparation.(ii) Details of land acquisition teams including support staff, logistics support for land acquisition teams to be deployed by the consultant for each CALA as detailed above is minimum. However, the consultant has to ensure adequate manpower given to CALA in terms of area under acquisition in the jurisdiction of each CALA in consultation with MORT&H/BRO, to ensure completion of land acquisition proceedings in time frame stipulated in contract agreement. Cost variation in this regard is not admissible. |
| 112 | Estimate of costs for Expatriate consultants (in Indian Rupees)REMUNERATION OF EXPATRIATE STAFF including per diem allowances. |
| 113 | Staff |
| 114 | Sub-Professional-1 |
| 115 | Sub-Professional-2 |
| 116 | Sub-Professional-3 |
| 117 | Sub-Professional-4 |
| 118 | Sub-Professional-5 |
| 119 | Sub-Professional-6 |
| 120 | Sub-Total-I |
| 121 | Mobiliation and Demobilization |
| 122 | A. International Airfares (Fixed costs) |
| 123 | B. Inland Travel in Home Country (Fixed costs) |
| 124 | C. Other Missc expenses (like DA, internal travel expenses other incidentals) |
| 125 | Sub-Total-II |
| 126 | Total (I+II) |
| 127 | Sch-A total |
| 128 | Schedule-B |
| 129 | AEM Survey & Report |
| 130 | Total |
| 131 | Geophysical Survey |
| 132 | Seismic Refraction Tomography (SRT) |
| 133 | Electrical Refraction Tomography (ERT) |
| 134 | Total |
| 135 | Any other Investigations/Surveys |
| 136 | Total |
| 137 | Sub-Surface Investigation (Boring) |
| 138 | a) Boring in all type of soils (other than bed rock) |
| 139 | b) Boring in bed rock |
| 140 | Total |
| 141 | Sch-B Total |
| 142 | Taxes and Duties |
| 143 | A. Income Tax (Expatriate) |
| 144 | B. Other Taxes/Duties (if any) Specify clearly |
| 145 | Total |
| 146 | Total cost (inclusive of all the taxes) but net of Goods and service Tax**Total cost net of Goods and Service Tax shall be considered for financial evaluation. |
| 147 | Goods and service Tax |
| 148 | TOTAL COSTS (Including GST) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 26 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 28 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender