Tender For Strengthening Work On The Faizabad-Raebareli Road (From Km 7 To 13 Of The Nauva Kuan Route), Connecting Dhemwa Ghat To National Highway 27 In Ayodhya District
Tender Value
13.41 Crore
Estimated cost
Bid Submission
16 Oct 2026
8 days left
EMD
26.82 Lakhs
Bank guarantee accepted
Document Fee
2714
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Ayodhya → Uttar Pradesh
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Strengthening Work On The Faizabad-Raebareli Road (From Km 7 To 13 Of The Nauva Kuan Route), Connecting Dhemwa Ghat To National Highway 27 In Ayodhya District
BOQ
| Sl. No. | Item Description |
| 1 | Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness. |
| 2 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 |
| 3 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 |
| 4 | Providing, laying, spreading and compacting graded stone aggregate WMM) mixing with 4% portland cement with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform single layer with paver as cemented base on sub base/subgrade (modified soil) and compacting with vibratory roller to achieve unconfined strength as specified by Engineer-in-charge. |
| 5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. |
| 6 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 to 1.00 kg/sqm using mechanical means. |
| 7 | Providing and applying tack coat with bitumen VG-10 using pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom. |
| 8 | Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous [email protected] per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finesher with senser control to the required grade,level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the disiered compaction as per MoRT&H specifications clause 509 complete in all respects . As per Direction of E/I. |
| 9 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. |
| 10 | Providing and laying P.C.C M-15 grade Cement concrete Stone aggregate 40mm nominal size) and curing complete,including cost fo formwork in foundation and floors. |
| 11 | Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. RCC Grade M20 using batching plant transit mixer & Concrete pump |
| 12 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. |
| 13 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)By Mechanical Means Cement Concrete |
| 14 | Dismantling of Structures (Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres)For dismantling of brick work/ tiles/etc. By Mechanical Means |
| 15 | R.C.C. M30 grade in Foundation as per drawing and technical specification. |
| 16 | R.C.C. M35 grade in Wearing coat as per drawing and technical specification. |
| 17 | Supply and fixing of 10cm internal Dia Ac Down pipes required for proper completion of work in weep holes. |
| 18 | Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification |
| 19 | Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. |
| 20 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications |
| 21 | Providing and laying boulders apron on canal bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification. |
| 22 | Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2. For Diversion work |
| 23 | Brick masonry work in 1:3 in sub-structure complete excluding pointing and plastering, as per drawing and Technical Specifications |
| 24 | Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications |
| 25 | S/F KM Stone,Hecto-stone, etc complete work |
| 26 | Providing and laying of hot applied thermoplastic compound 2.50 mm thick in 100mm widh including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.50 mm is exclusive of surface applied glass beads as per IRC:35. The finished Surface to be level, uniform and free from streaks and holes. |
| 27 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 1st year maintenance cost @ 0.00%. |
| 28 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 2nd year maintenance cost @ 0.25%. |
| 29 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 3rd year maintenance cost @ 0.50%. |
| 30 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 4th year maintenance cost @ 0.75%. |
| 31 | The routine maintenance of above road work including earthen shoulder and bituminous pavement etc to the required standards and in the manner as defined in CB condition and keep the entire road surface and structure in Defect free condition during the entire maintenance period which begins from the actual completion date and ends after five years. (Including cost of material, T&P, labour but excluding GST) for 5th year maintenance cost @ 1.0%. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 08, 2026
11:30 IST
Tender Published
Tender notice published.
TodayOct 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysOct 16, 2026
Bid Opening Date
Technical bids will be opened and evaluated.