Environment and Forests Government Departments Closing in 0 days TDR #57919880

Tender For Riverside Plantation At Akgyam, Rongdoo, Chainlink Fencing At Akgyam And Rongdoo , Crate Bund At Rongdoo And Plantation And Cement Concrete Khulsat Lakjung Of Forest Range Nubra Under C A

Issued by Government Departments · Leh, Ladakh
Tender Value
97.88 Lakhs
Estimated cost
Bid Submission
15 Oct 2026
0 days left
EMD
1.95 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Leh → Ladakh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Riverside Plantation At Akgyam, Rongdoo, Chainlink Fencing At Akgyam And Rongdoo , Crate Bund At Rongdoo And Plantation And Cement Concrete Khulsat Lakjung Of Forest Range Nubra Under C A

BOQ

Name of Work:- Riverside plantation at akgyam, rongdoo, chainlink fencing at akgyam and rongdoo , crate bund at rongdoo and Plantation and cement concrete khulsat lakjung of forest range nubra under C A
Sl. No. Item Description
1Plantation
2Survey , site selection , marking and other preparation work for plantation etc ( akgyam 15 nos , rongdoo 15 nos, lakjung 15 nos
3Earth work in excavation by manual means /hydraulic excavator) in trenches for foundation etc not exceeding 30m in depth in width or irrigational networks etc Mian Khul: Khul 2x 410Mx0.45Mx0.30m=110.7cum Channels : 1x 6000 x0.30Mx0.30m=540cum G.total= 650.7cum ( akgyam 650.7 cum , rongdoo 661.05 cum and lakjung 495.94 cum )
4Cost of FYM from a realible sources/Farmers for pitsplantation including the tranportation charges-12000 nos or 3000kgs ( akgyam 3000 kg , rongdoo 3500 kg , lakjung 1000 kg )
5b) Extraction and Pits Planting of willow /poplar green cutting/poly bag raised plant . this including excavation of pit 0.45mx0.45m x0.45m along the contour as well as on flat surface. This includes the formation of water harvesting structure etc. ( akgyam 2000 nos , rongdoo 2000 nos , lakjung 1000 nos )
6b) Pits Planting of sbt root shoot plant this including excavation of pit 0.30mx0.30m x0.30m along the contour as well as on flat surface. This includes the formation of water harvesting structure etc. ( akgyam 10000 nos , rongdoo 5000 nos , lakjung 1000 nos )
7Carriage of planting material from various sources /extraction site to planting site etc ( akgyam 12000 mt , rongdoo 7000 mt , lakjung 2000 mt )
82 Labour charge for four watch and ward and irrigation and maintenace work of raised plants for 8months in a year @Rs 13500/month ( akgyam 2 nos , rongdoo 2 nos , lakjung 2 nos )
9BUC 25%( willow) ( akgyam 500 nos, rongdoo 500 nos , lakjung 250 nos )
10BUC 25%( sbt) (akgyam 2500 nos , rongdoo 1250 nos , lakjung 250 nos )
11( 2nd year plantation / maintainance 2027-28 ) Cost and supply of willow plant from the reliable sources /progressive farmer including the transportation etc.( 20% Mortality rate expected during I year ( to be planted in the planting site during the 2nd year ) Willow) ( akgyam 400 nos , rongdoo 400 nos , lakjung 200 nos )
12SBT ( akgyam 2000 nos , rongdoo 1250 nos , lakjung 200 nos )
13Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed. All kind of soil Channels : 1x 2743 x0.15Mx0.15 m=61.71um ( Lakjung 61.71 cum )
142 Labour charge for four watch and ward and irrigation and maintenace work( minor protection work -desilting of khul et) of raised plants for 8months in a year @Rs 13500/month ( akgyam 1 nos , rongdoo 1 nos , lakjung 1 nos )
15( 3rd year maintainance 2028-2029) Cost of Selchang plant from the reliable sources /progressive farmer including the transportation etc(10% Mortality rate expected during 2 year ( to be planted in the planting site during the 3rd year ) (Willow) ( akgyam 200 nos , rongdoo 200 nos, lakjung 100 nos )
16SBT ( akgyam 1000 nos , rongdoo 500 nos , lakjung 100 nos )
17Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed. All kind of soil Channels : 1x 650x0.10Mx0.10 m=6.5cum ( 6.5 cum ) ( lakjung 6.5 cum )
18Labour charge for four watch and ward and irrigation and maintenace work( minor protection work -desilting of khul et) of raised plants for 8months in a year @Rs 13500/month ( akgyam for 7 month in a year, rongdoo 8 month in a year , lakjung 8 month in a year )
19( 4rd year maintenance 2029- 30 ) Weeding, light soil and pruning etc. 21lab @ Rs 595 /day ( akgyam 21 nos , rongdoo 21 nos , lakjung 13 nos )
201 Labour charge for four watch and ward and irrigation and maintenace work( minor protection work -desilting of khul et) of raised plants for 8months in a year @Rs 13500/month ( akgyam 1 nos , rongdoo 1 nos , lakjung 1 nos )
21( 5th year maintenance 2030 - 31 ) Pruning and trimming of branches of raised plantation etc 21 lab @ Rs595 /day ( akgyam 21 nos , rongdoo 21 nos, lakjung 13 nos )
221 Labour charge for four watch and ward and irrigation and maintenace work( minor protection work -desilting of khul et) of raised plants for 8 months in a year @Rs 13500/month ( akgyam 1 nos , rongdoo 1 nos , lakjung 1 nos )
23Earthwork in excavation by mechanical means ( hydraulic excavator) over areas ( Exceeding 30 cm in depth , 1.5 mtr in width as well as 10 sqm on plan ) including disposal of excavated earth , up to 50 m and lift upto 1.5 m . All kinds of soil 250x0.60cmx0.45cm =90.00 cum . 550x0.45cmx0.45=111.375cum = G total = 201.375 ( akgyam 201.375 cum , rongdoo 201.375 cum )
24Constructing muthu bunds, comprising boulders and woodbushes in alternate layers including working in water situations . A) Area -I 4x80'.00x(5'.00+4'.00\\") / 2 x4'.0\\" =5760.00cfts or 163.00 cum ( akgyam 163 cum , rongdoo 163 cum )
25Carriage of material by Mt. a) Stone and wood bushes etc by M. transport Avg. ( Lead 05 km ) ( akgyam 163 cum , rongdoo 163 cum )
26Fencing
27Survey , site selection , marking and other preparation workand removal of Bushes in the aligh of Fencing area fencing Work ( akgyam 25 nos , rongdoo 10 nos )
28Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed. All kind of soilFP -755×0.45cm x.0.45cm ×0.45cm= 68.79cum ( akgyam 68.79 cum , rongdoo 28.24 cum
29Providing and laying in cement concrete of specified grade include. Curing but excluding the cost of centering and shuttering. All work upto plinth level of 1:3:6 ( 1 cement, 3 coarse sand, stone aggregate of 20mm nominal size crushed stone aggregate) in blocks.755×0.45cm x.0.45cm ×0.45cm= 68.79cum ( akgyam 68.79 cum , rongdoo 28.24 cum )
30Providing and fixing of Angle Iron Fence Post made of MS angles (50 x 50 x 6mm) in built up sections and framed works including. Cutting housing single section 2.14 Mtr long with 15cm foot/ toe at the bottom with whole drilled and top bends.755x 2.14M x 4.50= 7270.65kgs ( akgyam 7270.65 kgs , rongdoo 2898.5 kgs )
31Centering and shuttering including strutting, propping etc removal of form for: Foundations, footings bases of columns etc for mass concrete.200x 4 nos x 0.45m x 0.45m =162.00sqm ( akgyam 162 sqm , rongdoo 40.5 sqm )
32Providing and fixing of G.I chain link fencing fabric 4mm dia fence cold dip galvanized of required mesh size 10cm x 10 cm wire of ( 4’’ x 4’’) mesh, including strengthening/ binding with 2mm dia wire or nut bolts and washer as required completely. 7550.00 rft x 5’ height= 37750sft x 0.215 or 8116.25Kgs ( akgyam 8116.25 kgs , rongdoo 3332.5 kgs )
33Providing and laying and strengthening of barbed wire at top of the fence post including all jobs.7550.00rft x(20.00rft=1kg) ( akgyam 377.5 rft , rongdoo 155 rft )
34Supply at site Angle iron post and strand of required size including bottom to be split and bend at triangular in opposite direction of 10 cm length and drill hook upto 10mm dia etc of complete job. Flat40mm x 6mm= 755nos x 2.85Kgs= 2151.75 Kgs ( akgyam 2151.75 kgs , rongdoo 883.5 kgs )
35Providing and installation of fabric iron Gates 6’ x 12’= Nos with angle iron Framed including. Master pillars (6’’ x 6’’) with cutting hoisting welding and all fitted and fixture and all lead completely. Total 320.00Kgs ( akgyam 320 kgs , rongdoo 160 kgs )
36Providing and installation of fabric iron Gates 4’ x 6’= 2 Nos with angle iron Framed including. Master pillars (6’’ x 6’’) with cutting hoisting welding and all fitted and fixture and all lead completely. =100Kgs ( akgyam 100 kgs , rongdoo 50 kgs )
37Painting Steel work with Deluxe Multi Surface Paint to give an even shade.Two or more coat applied @0.90ltr/10sqm over an under coat of primer applied @ 0.80 ltr/10 sqm of approved brand and manufactur- RFt-3000'.00\\"x5'.00\\" =15000.00sfts or 1393.5 sqm- D/d of void for mesh of 50%= 696.75 sqm ( akgyam 696.75 sqm, rongdoo 348.375 sqm )
38Carriage of sand and stone agg. by Mechanical Transport from source to working site for a distance of 10.00 Km.Sand and Stone agg. ( akgyam 84.61 cum, rongdoo 34.73 cum )
39Carriage of cement. By Mechanical Transport from sources to Akgyam by an average of 50.00 Km.Cement Qty. Vide item No:- 2 15133.8 kgs or 15.133MT ( akgyam 15.133 cum , rongdoo 6.21 cum )
40Carriage of Fencing Materials by mechanicals Transport from Leh to Akgyam for an average of 130.00 Km.Qty. Vide item No:- 3,5,6.7,8,9 and 10.18336.15 kgs or 18.337MT ( akgyam 18.33 cum , rongdoo 7.479 cum )
41Crate bund at Rongdoo a)Cost of readymade crate mesh made from 2.5mm, point wire as per IS280machine woven , both ends bent , with 23x42 =966.00 kgsb) crate binding wire of 3 kg x 23nos =69.00kgs T=900.00kg
42Earth work in excavation over area exceeding 30cm in depth as well as 10sqm on plane including disposal of excavated earth and lift up to 1.5 m disposal of earth to be leveled and neatly dressed23x4.87m×1.2m×0.15 m = 20.16cum.
43Constructing vertical bund of sloping faces by boulder filling /dry hand packed tightly including the cost but excluding cost of crate bund. 23x4.87m×1.2m×1.2 m = 161.29cum
44Making knitted crate of approved mesh size includes weaving, binding sides and binding top after filling, excluding cost of filling stone and binding material.Top 23x4.87m×0.30 m = 33.60sqm Side x16x1.2×0.3 m = 5.76sqm =T= 39.36sqm
45Carriage of crate material by M.T as under:-Carriage of 20crate mesh from sources to site on average distance 120 km including loading and unloading etc.
46Carriage charges by M. transport of 140.259cum stone from a distance of 10 kms including loading and unloading etc.
47Cement Concrete khul at Lakjung Survey , site selection , marking and other preparation workand removal of Bushes in the aligh of Fencing area fencing Work
48Earth work in excavation by mechanical means (hydraulic excavator) over areas (Exceeding 30cm in depth, 1.5mtr in width as well as 10sqm 0n plan)including disposal of excavated earth, lead up to 50m and lift upto 1.5m All kind of soil1x 1550'.00\\"x 4'0\\" x 1'.6\\"=6900.00cfts or 195.27cum
49Providing and lying-in position of cement concrete of specific grade including of centering and shuttering all work upto plinth level 1:3:6(1cement 3 fine sand 6 graded stone agg.20mm nominal size)1 crushedBase=1x1550’x3'6\\" x0.9’’=4068.75cftsSide=02x1550’x 0.9”x1'6”= 3487.5cfts Total = 7556.25 cft or 213.84cum
50Dry stone pitching 22.5 cm thick laid in courses and required profile with hammerdressed stones having no side less than 15 cm, with minimum depth of 20 cmincluding preparing the bedding surface etc. all complete. (Payment for Stone tobe made separately). Base = 01 x 1000' x 4'0\\" = 4000 sft or 371.6 sqm
51Centering and shuttering including strutting, propping etc. and removal of form work for Foundations, footings, bases for columns 2x600x1’.6’=1800.00sqf2x600 x1'0\\" = 1200.00 Total = 3000sft or 278.7 sqm
52Carriage of material by MTa) Carriage of cement 834 bag from store to site at a distance of 60 km one trip incl. loading and unloading
53c) Carriage of stone and agg 263.01 cum from a distance of 10 kms .
54c) Carriage of stone 83.6 cum from a distance of 10 kms . Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57919880
AUTHORITY Government Departments
TENDER VALUE 97.88 Lakhs
LAST DATE 15-10-2026
Authority
Authority Name Forest Department
Work Description Tender for Riverside Plantation At Akgyam, Rongdoo, Chainlink Fencing At Akgyam And Rongdoo , Crate Bund At Rongdoo And Plantation And Cement Concrete Khulsat Lakjung Of Forest Range Nubra Under C A
Basic Detail
Tender No E-Tender No 13 of FDL 2026-27
Bidding Type Tender
Location
City Leh
State Ladakh
Key Dates
Publish Date 08 Oct 2026
Submission Date 15 Oct 2026
Open Date 16 Oct 2026
Finance
Tender Value 97.88 Lakhs
Tender Fee 2000
EMD 1.95 Lakhs
Exemption Not Available
Document List
0a8b2e34-3681-44f6-bfde-4a1dfa281999.html
BOQ_46508.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 08, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 15, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Today
Oct 16, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
html

0a8b2e34-3681-44f6-bfde-4a1dfa281999.html

xls

BOQ_46508.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender