Tender For Upkeeping Of Building Cooling And Ventilation System Of New Town Convention Centre In New Town, Kolkata.
Tender Value
Ref. Documents
Estimated cost
Bid Submission
26 Oct 2026
0 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
24 Paraganas North → West Bengal
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Upkeeping Of Building Cooling And Ventilation System Of New Town Convention Centre In New Town, Kolkata.
BOQ
| Sl. No. | Item Description |
| 1 | Supply and replacement of air filters for all Air Handling Units (AHU) and Cassette/Ceiling Handling Units (CHU) installed at the Convention Centre, comprising removal of existing choked/damaged filter media (pre-filters of washable/synthetic non-woven fabric, 10-micron average efficiency, and fine filters as applicable) from the filter section of each unit, and supply and fixing of new filters of matching size, micron rating and efficiency class (EU3/G3 for pre-filter and EU5/F5 for fine filter, or as existing), duly fitted in the filter frame/track with proper gasket sealing to prevent bypass air leakage. The work includes cleaning of filter housing, frame and mounting channel prior to fixing the new filter, checking of the filter clamping arrangement, and visual/manometric verification of pressure drop across the filter after installation. Old and discarded filters shall be removed from site and disposed of as per site instructions. The work shall be carried out AHU-wise and CHU-wise strictly as per the direction and schedule of the Engineer-in-Charge (EIC), without disrupting HVAC operation of unaffected areas. Rate shall be inclusive of all material, labour, tools, tackles, scaffolding/ladder, transportation, loading-unloading and disposal of waste, complete in all respects as directed. |
| 2 | Chemical cleaning and washing of the Air Handling Unit (AHU) cooling coil (fins) using an approved alkaline foaming coil cleaner to remove accumulated dust, grease, biological growth and scaling from the fin surface and coil tubes, thereby restoring heat transfer efficiency and airflow. The work comprises isolation and safe shutdown of the AHU, removal of access panels, protection of the surrounding motor, VFD, electricals and insulation from the cleaning chemical using polythene sheeting, application of the foaming cleaner uniformly over both faces of the coil, allowing the prescribed dwell/reaction time, followed by thorough rinsing with clean water using a low-pressure jet/spray without damaging the fins, and combing/straightening of any bent fins to restore fin spacing. The drain pan shall be cleaned of sludge and biological deposits, the drain trap and drain line checked for free flow, and the casing interior wiped clean and disinfected. After cleaning, the AHU shall be run and checked for leak-free operation, correct condensate drainage and improved delta-T across the coil. Rate to include all chemicals, consumables, protective sheeting, labour, tools, testing and making good, complete per AHU as required, all complete as directed by the Engineer-in-Charge. |
| 3 | Checking, correction and re-alignment of the AHU motor-blower drive assembly (pulley and coupling alignment) to eliminate belt wear, vibration, noise and bearing overload caused by misalignment. The work comprises isolation of the AHU, opening of the motor/blower access panel, visual inspection of motor and blower pulley faces, checking of parallel and angular alignment using a dial gauge/laser alignment tool or straight-edge and feeler gauge as applicable, and correction by loosening motor mounting bolts, repositioning/shimming the motor base with precision shims, and re-tightening to achieve correct pulley alignment within permissible tolerance. Belt tension shall be checked and adjusted to the manufacturer's recommended deflection, and motor base rails/slide rails greased for smooth future adjustment. Bearings of the motor and blower shall be checked for play/noise and lubricated as required. After alignment, the unit shall be run and checked for vibration levels, noise and current draw within rated limits. The work is applicable for all AHU capacities and drive configurations. Rate shall be inclusive of alignment tools/instruments, shims, consumables, lubricants, labour and testing, complete per AHU as required, all complete in all respects as directed by the Engineer-in-Charge. |
| 4 | Supply and replacement of standard section V-belt for the AHU blower drive, matching the size, section (A/B/C type as applicable) and length of the existing belt, to restore correct power transmission between motor and blower. The work comprises isolation and lock-out of the AHU, removal of the belt guard, slackening of the motor base/tensioner to relieve belt tension, removal of the old, worn, cracked or slipping belt, cleaning of pulley grooves of dust, grease and glazing, fixing of the new matching-specification V-belt (of reputed make, oil and heat resistant, anti-static as applicable), and setting of correct belt tension as per the manufacturer's recommended deflection using a tension gauge or standard deflection method. Where the drive uses matched multiple belts, all belts of the set shall be replaced together to ensure equal tension and load sharing. Pulley alignment shall be verified/corrected simultaneously if found disturbed. The belt guard shall be refitted securely after completion. The unit shall then be run and checked for smooth, vibration-free operation and correct blower RPM/airflow. Rate to include belt, labour, tools, consumables and testing, complete per set as required, all complete as directed by the Engineer-in-Charge. |
| 5 | Supply and replacement of V-belt Type B-84 (Section B, nominal length 84 inches, or equivalent metric designation) for the AHU blower drive at locations where the belt is reported missing, rendering the blower/AHU non-functional. The work comprises isolation and lock-out of the AHU, removal of the belt guard/access panel, inspection of pulley grooves and cleaning of dust, rust and foreign deposits, supply and fitting of the new Type B-84 V-belt of reputed make conforming to relevant IS/ISO standards for oil, heat and wear resistance, correct positioning on the motor and blower pulley grooves, and adjustment of the motor base/tensioner to achieve the manufacturer-recommended belt tension and deflection. Pulley alignment (parallel and angular) shall be checked and corrected if required prior to fitting the belt to prevent premature wear. The belt guard shall be refitted and secured after completion. The AHU shall then be started and run-tested to confirm smooth power transmission, correct blower speed, adequate airflow and absence of belt slip, squeal or excessive vibration. Rate shall be inclusive of belt, labour, tools, consumables, alignment check and testing, complete per each unit as required, all complete in all respects as directed by the Engineer-in-Charge. |
| 6 | Repair, servicing and restoration to automatic operation of motorised 2-way/3-way chilled water actuator control valves currently found stuck/faulty and running under manual (bypass) operation, to restore automatic temperature control of the AHU. The work comprises isolation of the chilled water line, dismantling of the actuator from the valve body, inspection and repair/replacement of internal gears, limit switches, spring-return mechanism, actuator coupling and wiring terminals as found defective, cleaning and lubrication of the valve stem and gland packing to prevent leakage, and re-assembly of the actuator onto the valve ensuring correct stroke and fail-safe position setting. Control wiring from the AHU/BMS controller to the actuator shall be checked, re-terminated and tested for correct open/close and modulating signal response. After repair, the valve shall be functionally tested through its full travel, flow balancing carried out to achieve the designed chilled water flow, and the supply air temperature verified against the set-point to confirm proper closed-loop control. Rate to include spares, labour, testing instruments, flow balancing and commissioning, complete per valve as required, all complete as directed by the Engineer-in-Charge. |
| 7 | Repair and re-commissioning of the Variable Frequency Drive (VFD) panel controlling the AHU blower motor, including supply of a new VFD card/power module where found burnt or defective, and transportation of the same to site. The work comprises isolation of the VFD panel, diagnosis of the fault (power module, control card, display unit, cooling fan, input/output terminals, etc.), removal of the defective card/component, supply and fitting of a compatible replacement card/module of matching make, rating and firmware version, re-wiring/re-termination of power and control cables, and re-configuration of drive parameters (motor rated current, voltage, frequency, acceleration/deceleration ramp, minimum/maximum frequency, protection settings) to match the connected motor and AHU duty. After repair, the VFD shall be energised and load-tested with the AHU motor running through its full speed range, checking output current, voltage, temperature rise and absence of fault trips. Panel indications, meters and the cooling fan shall be verified functional. Rate shall be inclusive of new VFD card/spares, transportation, labour, parameter setting, load testing and commissioning, complete per unit as required, all complete as directed by the Engineer-in-Charge. |
| 8 | Repairing and/or calibration of pressure gauges, thermostats and temperature sensors installed on the AHU/chilled water system, to restore accurate monitoring and control of system parameters. The work comprises isolation of the instrument, removal from its tapping/mounting point, inspection for physical damage, dial/needle malfunction, bourdon tube leakage (for pressure gauges), sensor drift or broken capillary (for thermostats/temperature sensors), repair using genuine/compatible spare parts including glass, needle, bourdon element, sensing bulb, capillary tubing and terminal connectors as applicable, and calibration against a certified reference standard to verify accuracy across the operating range. Where repair is not feasible, the instrument shall be replaced with a new unit of identical range, accuracy class and connection size, and specification of the repairing material/spares used shall be furnished to the Engineer-in-Charge for approval prior to fixing. After calibration/replacement, the instrument shall be refitted at its original location with proper isolation valve/pocket, leak-tested (for pressure gauges) and functionally verified against actual system reading. Rate to include spares, calibration charges, labour and testing, complete per instrument as required, all complete as directed by the Engineer-in-Charge. |
| 9 | Supply and installation of dial-type thermometer (0-100 degree C range, 6-inch dial size, bottom/back connected as per location) in the AHU supply air duct, in place of the existing damaged/non-functional unit, complete with stainless steel (SS) ball valve and SS syphon/pocket for isolation and protection of the sensing element. The work comprises removal of the damaged thermometer and its fittings, preparation of the duct/pipe tapping point, supply and fixing of the new SS ball valve and SS syphon of appropriate size and pressure rating, threading/welding as required to ensure a leak-proof connection, and mounting of the new dial thermometer with correct stem length for accurate immersion/sensing depth in the air stream. The thermometer shall be of a reputed make, with a clear white dial, black numerals, stainless steel case and accuracy within +/-1% of full scale. After installation, the assembly shall be checked for leak-tightness (where connected to a wet system) and the reading cross-verified against a reference thermometer. Rate shall be inclusive of thermometer, SS ball valve, SS syphon, fixing accessories, labour and testing, complete per unit as required, all complete in all respects as directed by the Engineer-in-Charge. |
| 10 | Supply and repair of Nitrile rubber pipe insulation of 32 mm total thickness (19 mm + 13 mm, two-layer application) with GC (glass cloth)/aluminium cladding finish, for chilled water/condenser water piping within the AHU room where the existing insulation is found damaged, torn, water-logged or missing, causing condensation and heat loss/gain. The work comprises removal of the damaged insulation and cladding without disturbing the pipe (insulation only, pipe not included in this item), cleaning of the pipe surface of old adhesive, rust and moisture, application of a suitable Nitrile rubber adhesive, and fixing of new closed-cell Nitrile rubber insulation of specified thickness in matching pipe-diameter sleeves/sheets, with all joints, seams and pipe fittings (bends, tees, valves, flanges) fully sealed using self-adhesive Nitrile rubber tape to prevent moisture ingress. The GC cloth/aluminium cladding shall be neatly wrapped and secured over the insulation for mechanical protection. The work is applicable for all pipe sizes as encountered at site. Rate shall be inclusive of insulation material, adhesive, sealing tape, cladding, labour and tools, measured per square metre of insulated surface, complete as required, all complete as directed by the Engineer-in-Charge. |
| 11 | Supply, Installation, Testing and Commissioning (SITC) of 38 mm thick (19 mm + 19 mm, two-layer) Nitrile rubber pipe insulation for chilled water/condenser water piping in the plant room, complete with vapour barrier coating and 26-gauge aluminium sheet cladding, for pipe sizes ranging from 150 mm to 300 mm nominal diameter. The work comprises cleaning and preparation of the bare/existing pipe surface, application of the first 19 mm layer of closed-cell Nitrile rubber insulation with suitable adhesive, followed by the second 19 mm layer staggered at the joints to avoid thermal bridging, sealing of all longitudinal and circumferential joints with self-adhesive Nitrile tape, application of a vapour barrier mastic/coating over the insulation to prevent moisture ingress and condensation, and cladding with 26 G plain/embossed aluminium sheet fixed with self-tapping screws/aluminium bands, neatly finished at pipe fittings, valves, flanges, bends and supports. All work shall conform to good engineering practice for cold insulation in plant rooms. Rate shall be inclusive of insulation material, adhesive, vapour barrier, aluminium cladding, fixing accessories, labour, tools and testing for condensation-free performance, measured per square metre, complete as required, all complete as directed by the Engineer-in-Charge. |
| 12 | Supply, Installation, Testing and Commissioning (SITC) of butterfly valve(s) of the specified sizes, without insulation, for isolation/control of chilled water (CHW) and condenser water (CW) pump suction/discharge lines, in replacement of the existing damaged/leaking/seized valves. The work comprises draining down the affected pipeline section, removal of the old butterfly valve along with its gaskets, supply of a new wafer/lug-type butterfly valve of cast iron/ductile iron body, EPDM/nitrile rubber liner, stainless steel/aluminium bronze disc, suitable for the working pressure and temperature of the chilled/condenser water system, and conforming to relevant IS/international standards, complete with hand lever or gear operator as per size, matching the existing pipe flange rating (PN10/PN16 as applicable). Installation shall include fixing of new gaskets, nuts, bolts and washers, correct alignment between flanges to avoid stress on the valve body, and tightening in proper sequence to ensure leak-tight joints. After installation, the valve shall be hydraulically tested for leak-tightness and operated through open-close cycles to confirm smooth functioning, and the pump line re-commissioned. Rate shall be inclusive of valve, gaskets, fasteners, labour, tools, testing, complete per each size as specified, all complete as directed by the Engineer-in-Charge.200 mm dia |
| 13 | 250 mm dia |
| 14 | 300 mm dia |
| 15 | 350 mm dia |
| 16 | Supply and installation for repair/replacement of damaged chilled water (CHW) or condenser water (CW) pipe of the specified diameters (200 mm to 350 mm), at locations where the existing MS/GI pipe is found corroded, leaking, cracked or perforated, to restore leak-free water circulation. The work comprises isolation and draining of the affected pipe section, cutting out and removal of the damaged length of pipe, supply of new mild steel (MS) 'C'/'B' class pipe (or as per existing specification) of matching diameter and schedule, cutting, bevelling and welding/flanged jointing of the new pipe length true to line and level with the existing pipeline, fixing of necessary couplings, flanges, gaskets and fasteners at joints, and provision of pipe supports/hangers as required to maintain proper alignment and prevent sagging. All welded joints shall be visually inspected and, where specified, radiography/dye-penetrant tested for soundness. After installation, the repaired section shall be hydrostatically tested to 1.5 times working pressure for leak-tightness before re-insulation and re-commissioning. Rate shall be inclusive of pipe material, welding consumables, fittings, supports, labour, tools, testing, measured per running metre for the specified diameter, complete as required, all complete as directed by the Engineer-in-Charge.200 mm dia |
| 17 | 250 mm dia |
| 18 | 300 mm dia |
| 19 | 350 mm dia |
| 20 | Supply, Installation, Testing and Commissioning (SITC) or repair of the Variable Frequency Drive (VFD) panel, in all respects, for the faulty AHU blower motor of the specified rating (3.7 kW / 5.5 kW), making the drive fully functional with an automatic ON/OFF control system interlocked with the AHU/BMS schedule. The work comprises removal of the existing non-functional VFD (or repair of the existing unit where economically feasible), supply and installation of a new VFD of matching motor rating, voltage and current class, housed in a dust/vermin-proof panel with door interlock, MCB/MCCB incomer, output contactor and indicating lamps/meters, wiring of power and control cabling from the existing motor and control source, and programming of drive parameters including acceleration/deceleration ramps, motor overload protection, minimum/maximum frequency limits and auto start/stop logic based on time schedule or BMS signal. After installation, the VFD shall be load-tested with the connected AHU motor through its full speed range and the auto ON/OFF sequence verified for correct operation. Rate shall be inclusive of VFD/spares, panel, wiring, programming, labour, testing and commissioning, complete per unit of specified rating, all complete as directed by the Engineer-in-Charge.3.7 kW |
| 21 | 5.5 kW |
| 22 | Supply and replacement of the Air Handling Unit (AHU) chilled water cooling coil with a new coil, custom-fabricated/selected to suit the available casing space, coil connection size and cooling capacity of the AHU, in place of the existing coil found leaking, corroded or beyond economical repair. The work comprises isolation and draining of the chilled water circuit connected to the AHU, disconnection of the inlet/outlet piping and removal of the old coil from the casing, supply of a new coil with copper tubes and aluminium fins (or as per existing specification), hot-dip galvanised/painted MS casing frame, header and connection stubs matching the existing pipe size, careful fixing of the new coil into the AHU casing ensuring proper sealing against air bypass around the coil periphery using foam/gasket strips, and reconnection of the chilled water inlet/outlet piping with new gaskets and fasteners. After installation, the chilled water circuit shall be filled, vented and pressure-tested for leak-tightness, and the AHU run-tested to verify supply air temperature drop and cooling performance against design parameters. Rate shall be inclusive of the new coil, gaskets, fasteners, labour, tools and testing, complete per AHU as required, all complete as directed by the Engineer-in-Charge. |
| 23 | Supplying, fabrication at site, installation, testing, balancing and commissioning of rectangular/round ducting fabricated from Galvanised Steel Sheet (GSS) of the specified gauge (24G/22G/20G as per size and pressure class), complete with neoprene rubber gaskets at flanged joints, elbows, splitter dampers, turning vanes, hangers, supports, bends, transitions, reducers, end caps, collars and all other accessories necessary for a complete and functional ducting system. Fabrication shall be carried out strictly in conformity with IS: 655 for the specified gauge and duct dimensions, with cross-broken/beaded panels for stiffening on larger ducts, Pittsburgh lock or button-punch snap lock longitudinal seams, and flanged (angle/companion) or slide-on joints at transverse connections with neoprene gasket and nut-bolts for air-tight assembly. Ducting shall be suspended/supported at specified intervals using MS hangers, threaded rods and clamps fixed to the structural slab/beam. After installation, the ducting shall be tested for air leakage, and airflow balanced at each outlet/branch to achieve the designed distribution, in conformity with approved drawings and specifications. Rate shall be inclusive of GSS sheet, gasket, hardware, supports, fabrication, erection, testing and balancing, measured per square metre of duct surface for the specified gauge, complete as required, all complete as directed by the Engineer-in-Charge.24 G |
| 24 | Supplying and fixing of the specified thickness (25 mm) of duly laminated aluminium foil-faced, mat-finish, closed-cell Nitrile rubber (Class 'O', fire-retardant) insulation on the exterior surface of existing/new GSS ductwork, to prevent heat gain/loss and condensation on the duct surface. The work comprises cleaning of the duct surface of dust, grease and loose scale, application of a suitable Nitrile rubber-compatible adhesive uniformly over the duct surface and the insulation sheet, fixing of the insulation sheet firmly without air gaps or wrinkles, ensuring full contact for effective adhesion, and butting all edges and joints tightly together. All joints, seams, corners and overlaps shall be sealed with 50 mm wide, 3 mm thick self-adhesive Nitrile rubber tape to provide a continuous, vapour-sealed and neat finished surface, and to prevent moisture ingress causing condensation and insulation degradation. Insulation shall be Class 'O' fire-rated and free from CFC, with the aluminium foil facing outward. Rate shall be inclusive of insulation material, adhesive, sealing tape, labour and tools, measured per square metre of duct surface insulated, complete as per specifications and as required, all complete as directed by the Engineer-in-Charge.25 mm |
| 25 | Supplying, Installation, Testing and Commissioning (SITC) of Galvanised Iron (GI) volume control duct damper of the required size, for regulating and balancing airflow within the ductwork, complete with neoprene rubber gaskets at the flanged connection, nuts, bolts, screws, operating linkage/quadrant lever and locking arrangement, in conformity with SMACNA/IS standards and as per specifications. The work comprises fabrication or supply of the damper frame and multi-blade/single-blade louvre assembly from GI sheet of adequate gauge, fitting of the damper within a cut-out section of the ductwork with a flanged and gasketed connection to ensure air-tight fixing, provision of an external operating quadrant/lever with a locking screw for setting and holding the desired blade angle, and sealing of the surrounding duct joint. After installation, the damper shall be tested through its full range of movement (fully open to fully closed) for smooth, stiction-free operation, and airflow through the duct branch balanced and locked at the required setting using an anemometer/balancing instrument. Rate shall be inclusive of damper, gaskets, hardware, fabrication/supply, fixing, labour, tools, testing and air balancing, measured per square metre of damper face area, complete as required, all complete as directed by the Engineer-in-Charge. |
| 26 | Supply, Installation, Testing and Commissioning (SITC) of electronic, self-balancing, pressure-independent type Dynamic Balancing Valve (DBV) with an integrated 2-way modulating electronic control valve combined in a single valve body, of the specified sizes, for automatic flow control and balancing of the chilled water circuit independent of system pressure fluctuations. The valve actuator shall be electric, capable of accepting a control signal of up to 10V DC and up to 20 mA, and shall provide a proportional transduced feedback output signal to the Building Management/control system for flow status monitoring. The valve shall have a maximum close-off pressure rating of not less than 6 bar for sizes up to 50 mm and 7 bar for sizes 65 mm and above, and an overall pressure rating of 25 bar (PN25) minimum. The work comprises isolation and draining of the pipeline, removal of the existing valve/spool piece, installation of the new DBV with a flanged/threaded connection matching the pipe size, actuator wiring to the control panel, flow setpoint calibration, and functional testing of automatic flow balancing. Rate shall be inclusive of valve, actuator, wiring, labour, testing and commissioning, complete per size as specified, all complete as directed by the Engineer-in-Charge.125 mm dia |
| 27 | 100 mm dia |
| 28 | Add GST @18% of total amount of Sl No-1 to 29 |
| 29 | Add Construction Cess @1% of total amount of Sl No-1 to 29 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 26, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
TodayOct 28, 2026
Bid Opening Date
Technical bids will be opened and evaluated.