Tender For Development Of Landscaping Work Of New Bus Stand (6 Bays) At Tohana In Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply Of Material}
Tender Overview
Project Description
Tender for Development Of Landscaping Work Of New Bus Stand (6 Bays) At Tohana In Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply Of Material} , [Hsr 4.16.1.1] [Through Work] - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc. And Disposing Of Surplus Excavated Soil As Irected, Within A Lead Of 50 M:All Kinds Of Soil Pipes, Cables Etc, Not Exceeding 80 Mm Dia. , [Ns Item] [Through Work] - Supply And Laying Hdpe Pipe Of 50 Mm Internal Dia With 6 Kg/Cm2 Pressure (As Per Analysis) , [Hsr 26.2] [Through Work] - Supplying And Stacking Of Good Quality Top Layer Garden Earth Free From Debris And Weeds At Site Including Royalty And Carriage With 5 Km Lead (Good Earth Measured In Stacks Will Be Reduced By 20 % For Payment) Only For Filling Of Pots And Flower Beds. , [Hsr 26.10] [Through Work] - Maintenance Of Fine Grass Lawn (Including Flower/Ground Cover Beds) For 03 Months Including Fertilizer Application, Dap @ 20 Gm/Sqm, Urea @ 40 Gm/Sqm, Watering, Weeding, Top Dressing With Good Earth And Manure Mixture 2:1 @ 0.01 Cum Per Sqm, Maintaining Fine Level, Regular Mowing And Removal Of Rubbish With All Lifts And Leads. , [Hsr 26.15.1] [Through Work] - Maintenance Of Tree Plants For 03 Months For The 1St Three Years Of Age Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source, Application Of 10 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 G Dap Twice ,Replacement Of Casualty ,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.21] [Through Work] - Maintenance Of Specimen Tree For 03 Months Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source , Application Of 20 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 Gm Dap Twice, Replacement Of Casualty,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.19.1] [Through Work] - Maintenance Of Shrub Plants For 03 Months Including Weeding, Hoeing, Plant Protection, Watering From Deptt. Source, Application Of 4 Ml Chloropyriphos Four Times In A Year, 0.0289 Cum Fym, 20 Gm Urea And 20 Gm Dap Twice, Replacement Of Casualty Etc. Individual Shrubs , [Hsr 26.35] [Through Work] - Maintaining The Hedges For 03 Months Including Watering, Hoeing Weeding Trimming And Shaping, Replacement Of Casualty As And When Noticed, Application Of Farm Yard Manure @ 0.0127 M Layer Over Surface, Application Of Insecticide Chloropyriphos @ 2 Ml Per Sqm Twice, Urea @ 40 Gm And Dap @ 10 Gm Per Sqm Once In A Year. , [Hsr 26.49] [Through Work] - Maintenance Of Outdoor Potted Plants For 03 Months Including Watering, Application Of Fertilizer Npk 20:20:20 @ 20 Gm, And Vermicompost 50 Gm, Manure, Snowcem/Apex Every Month, Replacement Of Pot Plate, Broken Pot, Dead Plant With Same Species Of Plant Etc. , [Hsr 26.1] [Through Work] - Supplying And Stacking At Site Of Work Well Decayed Farm Yard Manure From Any Available Source Approved By The Engineer-In-Charge Including Screening Through Sieve Of I.S. Designation 16 Mm With 5 Km Lead. , Supply Of Drusban 20% E.C In Ltr. Packing (Ns) , Supply Of Imidachloprid (Media) 17.8% E.C. In Ltr. Packing (Ns) , Supply Of Bavistin Fungicide (Carbendazim 50% Wp) (Ns) , Supply At Site Vermi Compost Manure. (Hsr Ho030) , Supply Of Well Grinded In Powder Form De-Oiled Neem Cake In Packed Gunny Bags. (Hsr 26.77) , Providing And Stacking Winter Seasonal F1-Hybrid Seedlings/Cuttings At Site Of Work Well Developed And Healthy Free From Disease In Per Tray And Each Tray Having 70 Nos. Plants As Per Direction Of The Officer-In-Charge.[Hsr Item 26.524.5] [Through Work] - Calendula Double , [Hsr Item 26.524.14] [Through Work] - Dahlia Double , [Hsr Item 26.524.15] [Through Work] - Daisy Hybrid , [Hsr Item 26.524.16] [Through Work] - Dianthus Hybrid , [Hsr Item 26.524.17] [Through Work] - Gazania Hybrid , [Hsr Item 26.524.20] [Through Work] - Marigold French Hybrid Dwarf , [Hsr Item 26.524.21] [Through Work] - Marigold Inca Hybrid , [Hsr Item 26.524.26] [Through Work] - Phlox Mix Colour Hybrid , [Hsr Item 26.524.28] [Through Work] - Salvia
BOQ
| Sl. No. | Item Description |
| 1 | [HSR 4.16.1.1] [Through Work] - Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as irected, within a lead of 50 m:All kinds of soil Pipes, cables etc, not exceeding 80 mm dia. |
| 2 | [NS Item] [Through Work] - Supply and Laying HDPE pipe of 50 mm internal Dia with 6 kg/cm2 pressure (as per analysis) |
| 3 | [HSR 26.2] [Through Work] - Supplying and stacking of good quality top layer garden earth free from debris and weeds at site including royalty and carriage with 5 km lead (good earth measured in stacks will be reduced by 20 % for payment) only for filling of pots and flower beds. |
| 4 | [HSR 26.10] [Through Work] - Maintenance of fine grass lawn (including Flower/Ground Cover beds) for 03 Months including fertilizer application, DAP @ 20 gm/sqm, urea @ 40 gm/sqm, watering, weeding, top dressing with good earth and manure mixture 2:1 @ 0.01 cum per sqm, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads. |
| 5 | [HSR 26.15.1] [Through Work] - Maintenance of tree plants for 03 Months for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source, application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc. |
| 6 | [HSR 26.21] [Through Work] - Maintenance of specimen tree for 03 Months including weeding, hoeing , plant protection , watering from Deptt. source , application of 20 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 gm DAP twice, replacement of casualty,disposal of debris and other activities.etc. |
| 7 | [HSR 26.19.1] [Through Work] - Maintenance of shrub plants for 03 Months including weeding, hoeing, plant protection, watering from Deptt. source, application of 4 ml chloropyriphos four times in a year, 0.0289 cum FYM, 20 gm urea and 20 gm DAP twice, replacement of casualty etc.Individual shrubs |
| 8 | [HSR 26.35] [Through Work] - Maintaining the hedges for 03 Months including watering, hoeing weeding trimming and shaping, replacement of casualty as and when noticed, application of Farm yard manure @ 0.0127 m layer over surface, application of insecticide chloropyriphos @ 2 ml per sqm twice, urea @ 40 gm and DAP @ 10 gm per sqm once in a year. |
| 9 | [HSR 26.49] [Through Work] - Maintenance of outdoor potted plants for 03 Months including watering, application of fertilizer NPK 20:20:20 @ 20 gm, and vermicompost 50 gm, manure, snowcem/apex every month, replacement of pot plate, broken pot, dead plant with same species of plant etc. |
| 10 | [HSR 26.1] [Through Work] - Supplying and stacking at site of work well decayed farm yard manure from any available source approved by the Engineer-in-charge including screening through sieve of I.S. designation 16 mm with 5 km lead. |
| 11 | Supply of Drusban 20% E.C in Ltr. Packing (NS) |
| 12 | Supply of Imidachloprid (MEDIA) 17.8% E.C. in Ltr. Packing (NS) |
| 13 | Supply of Bavistin Fungicide (Carbendazim 50% WP) (NS) |
| 14 | Supply at site Vermi Compost manure. (HSR HO030) |
| 15 | Supply of well grinded in powder form De-oiled Neem cake in packed gunny bags. (HSR 26.77) |
| 16 | Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 70 Nos. plants as per direction of the officer-in-charge.[HSR Item 26.524.5] [Through Work] - Calendula double |
| 17 | [HSR Item 26.524.14] [Through Work] - Dahlia double |
| 18 | [HSR Item 26.524.15] [Through Work] - Daisy hybrid |
| 19 | [HSR Item 26.524.16] [Through Work] - Dianthus hybrid |
| 20 | [HSR Item 26.524.17] [Through Work] - Gazania hybrid |
| 21 | [HSR Item 26.524.20] [Through Work] - Marigold French Hybrid dwarf |
| 22 | [HSR Item 26.524.21] [Through Work] - Marigold Inca hybrid |
| 23 | [HSR Item 26.524.26] [Through Work] - Phlox mix colour hybrid |
| 24 | [HSR Item 26.524.28] [Through Work] - Salvia Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 8 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender