Housing Urban and Rular Development Government Departments Closing in 7 days TDR #57908903

Tender For Development Of Landscaping Work Of New Bus Stand (6 Bays) At Tohana In Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply Of Material}

Issued by Government Departments · Gurgaon, Haryana
Tender Value
2.04 Lakhs
Estimated cost
Bid Submission
21 Oct 2026
7 days left
EMD
4080
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Gurgaon → Haryana
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Development Of Landscaping Work Of New Bus Stand (6 Bays) At Tohana In Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply Of Material} , [Hsr 4.16.1.1] [Through Work] - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc. And Disposing Of Surplus Excavated Soil As Irected, Within A Lead Of 50 M:All Kinds Of Soil Pipes, Cables Etc, Not Exceeding 80 Mm Dia. , [Ns Item] [Through Work] - Supply And Laying Hdpe Pipe Of 50 Mm Internal Dia With 6 Kg/Cm2 Pressure (As Per Analysis) , [Hsr 26.2] [Through Work] - Supplying And Stacking Of Good Quality Top Layer Garden Earth Free From Debris And Weeds At Site Including Royalty And Carriage With 5 Km Lead (Good Earth Measured In Stacks Will Be Reduced By 20 % For Payment) Only For Filling Of Pots And Flower Beds. , [Hsr 26.10] [Through Work] - Maintenance Of Fine Grass Lawn (Including Flower/Ground Cover Beds) For 03 Months Including Fertilizer Application, Dap @ 20 Gm/Sqm, Urea @ 40 Gm/Sqm, Watering, Weeding, Top Dressing With Good Earth And Manure Mixture 2:1 @ 0.01 Cum Per Sqm, Maintaining Fine Level, Regular Mowing And Removal Of Rubbish With All Lifts And Leads. , [Hsr 26.15.1] [Through Work] - Maintenance Of Tree Plants For 03 Months For The 1St Three Years Of Age Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source, Application Of 10 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 G Dap Twice ,Replacement Of Casualty ,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.21] [Through Work] - Maintenance Of Specimen Tree For 03 Months Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source , Application Of 20 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 Gm Dap Twice, Replacement Of Casualty,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.19.1] [Through Work] - Maintenance Of Shrub Plants For 03 Months Including Weeding, Hoeing, Plant Protection, Watering From Deptt. Source, Application Of 4 Ml Chloropyriphos Four Times In A Year, 0.0289 Cum Fym, 20 Gm Urea And 20 Gm Dap Twice, Replacement Of Casualty Etc. Individual Shrubs , [Hsr 26.35] [Through Work] - Maintaining The Hedges For 03 Months Including Watering, Hoeing Weeding Trimming And Shaping, Replacement Of Casualty As And When Noticed, Application Of Farm Yard Manure @ 0.0127 M Layer Over Surface, Application Of Insecticide Chloropyriphos @ 2 Ml Per Sqm Twice, Urea @ 40 Gm And Dap @ 10 Gm Per Sqm Once In A Year. , [Hsr 26.49] [Through Work] - Maintenance Of Outdoor Potted Plants For 03 Months Including Watering, Application Of Fertilizer Npk 20:20:20 @ 20 Gm, And Vermicompost 50 Gm, Manure, Snowcem/Apex Every Month, Replacement Of Pot Plate, Broken Pot, Dead Plant With Same Species Of Plant Etc. , [Hsr 26.1] [Through Work] - Supplying And Stacking At Site Of Work Well Decayed Farm Yard Manure From Any Available Source Approved By The Engineer-In-Charge Including Screening Through Sieve Of I.S. Designation 16 Mm With 5 Km Lead. , Supply Of Drusban 20% E.C In Ltr. Packing (Ns) , Supply Of Imidachloprid (Media) 17.8% E.C. In Ltr. Packing (Ns) , Supply Of Bavistin Fungicide (Carbendazim 50% Wp) (Ns) , Supply At Site Vermi Compost Manure. (Hsr Ho030) , Supply Of Well Grinded In Powder Form De-Oiled Neem Cake In Packed Gunny Bags. (Hsr 26.77) , Providing And Stacking Winter Seasonal F1-Hybrid Seedlings/Cuttings At Site Of Work Well Developed And Healthy Free From Disease In Per Tray And Each Tray Having 70 Nos. Plants As Per Direction Of The Officer-In-Charge.[Hsr Item 26.524.5] [Through Work] - Calendula Double , [Hsr Item 26.524.14] [Through Work] - Dahlia Double , [Hsr Item 26.524.15] [Through Work] - Daisy Hybrid , [Hsr Item 26.524.16] [Through Work] - Dianthus Hybrid , [Hsr Item 26.524.17] [Through Work] - Gazania Hybrid , [Hsr Item 26.524.20] [Through Work] - Marigold French Hybrid Dwarf , [Hsr Item 26.524.21] [Through Work] - Marigold Inca Hybrid , [Hsr Item 26.524.26] [Through Work] - Phlox Mix Colour Hybrid , [Hsr Item 26.524.28] [Through Work] - Salvia

BOQ

Name of Work:- Development of landscaping work of New Bus Stand (6 Bays) at Tohana in Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply of Material}
Sl. No. Item Description
1[HSR 4.16.1.1] [Through Work] - Excavating trenches of required width for pipes, cables, etc including excavation for sockets, and dressing of sides, ramming of bottoms, depth up to 1.5 m, including getting out the excavated soil, and then returning the soil as required, in layers not exceeding 20 cm in depth, including consolidating each deposited layer by ramming, watering, etc. and disposing of surplus excavated soil as irected, within a lead of 50 m:All kinds of soil Pipes, cables etc, not exceeding 80 mm dia.
2[NS Item] [Through Work] - Supply and Laying HDPE pipe of 50 mm internal Dia with 6 kg/cm2 pressure (as per analysis)
3[HSR 26.2] [Through Work] - Supplying and stacking of good quality top layer garden earth free from debris and weeds at site including royalty and carriage with 5 km lead (good earth measured in stacks will be reduced by 20 % for payment) only for filling of pots and flower beds.
4[HSR 26.10] [Through Work] - Maintenance of fine grass lawn (including Flower/Ground Cover beds) for 03 Months including fertilizer application, DAP @ 20 gm/sqm, urea @ 40 gm/sqm, watering, weeding, top dressing with good earth and manure mixture 2:1 @ 0.01 cum per sqm, maintaining fine level, regular mowing and removal of rubbish with all lifts and leads.
5[HSR 26.15.1] [Through Work] - Maintenance of tree plants for 03 Months for the 1st three years of age including weeding, hoeing , plant protection , watering from Deptt. source, application of 10 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 g DAP twice ,replacement of casualty ,disposal of debris and other activities.etc.
6[HSR 26.21] [Through Work] - Maintenance of specimen tree for 03 Months including weeding, hoeing , plant protection , watering from Deptt. source , application of 20 ml chlorpyriphos four times, 0.0289 cum FYM each,50 gm urea and 50 gm DAP twice, replacement of casualty,disposal of debris and other activities.etc.
7[HSR 26.19.1] [Through Work] - Maintenance of shrub plants for 03 Months including weeding, hoeing, plant protection, watering from Deptt. source, application of 4 ml chloropyriphos four times in a year, 0.0289 cum FYM, 20 gm urea and 20 gm DAP twice, replacement of casualty etc.Individual shrubs
8[HSR 26.35] [Through Work] - Maintaining the hedges for 03 Months including watering, hoeing weeding trimming and shaping, replacement of casualty as and when noticed, application of Farm yard manure @ 0.0127 m layer over surface, application of insecticide chloropyriphos @ 2 ml per sqm twice, urea @ 40 gm and DAP @ 10 gm per sqm once in a year.
9[HSR 26.49] [Through Work] - Maintenance of outdoor potted plants for 03 Months including watering, application of fertilizer NPK 20:20:20 @ 20 gm, and vermicompost 50 gm, manure, snowcem/apex every month, replacement of pot plate, broken pot, dead plant with same species of plant etc.
10[HSR 26.1] [Through Work] - Supplying and stacking at site of work well decayed farm yard manure from any available source approved by the Engineer-in-charge including screening through sieve of I.S. designation 16 mm with 5 km lead.
11Supply of Drusban 20% E.C in Ltr. Packing (NS)
12Supply of Imidachloprid (MEDIA) 17.8% E.C. in Ltr. Packing (NS)
13Supply of Bavistin Fungicide (Carbendazim 50% WP) (NS)
14Supply at site Vermi Compost manure. (HSR HO030)
15Supply of well grinded in powder form De-oiled Neem cake in packed gunny bags. (HSR 26.77)
16Providing and stacking winter seasonal F1-Hybrid seedlings/cuttings at site of work well developed and healthy free from disease in per tray and each tray having 70 Nos. plants as per direction of the officer-in-charge.[HSR Item 26.524.5] [Through Work] - Calendula double
17[HSR Item 26.524.14] [Through Work] - Dahlia double
18[HSR Item 26.524.15] [Through Work] - Daisy hybrid
19[HSR Item 26.524.16] [Through Work] - Dianthus hybrid
20[HSR Item 26.524.17] [Through Work] - Gazania hybrid
21[HSR Item 26.524.20] [Through Work] - Marigold French Hybrid dwarf
22[HSR Item 26.524.21] [Through Work] - Marigold Inca hybrid
23[HSR Item 26.524.26] [Through Work] - Phlox mix colour hybrid
24[HSR Item 26.524.28] [Through Work] - Salvia Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57908903
AUTHORITY Government Departments
TENDER VALUE 2.04 Lakhs
LAST DATE 21-10-2026
Authority
Authority Name Public Works Department
Work Description Tender for Development Of Landscaping Work Of New Bus Stand (6 Bays) At Tohana In Fatehabad Distt. {Mtc. For 03 Months (Labour Work Only) & Supply Of Material} , [Hsr 4.16.1.1] [Through Work] - Excavating Trenches Of Required Width For Pipes, Cables, Etc Including Excavation For Sockets, And Dressing Of Sides, Ramming Of Bottoms, Depth Up To 1.5 M, Including Getting Out The Excavated Soil, And Then Returning The Soil As Required, In Layers Not Exceeding 20 Cm In Depth, Including Consolidating Each Deposited Layer By Ramming, Watering, Etc. And Disposing Of Surplus Excavated Soil As Irected, Within A Lead Of 50 M:All Kinds Of Soil Pipes, Cables Etc, Not Exceeding 80 Mm Dia. , [Ns Item] [Through Work] - Supply And Laying Hdpe Pipe Of 50 Mm Internal Dia With 6 Kg/Cm2 Pressure (As Per Analysis) , [Hsr 26.2] [Through Work] - Supplying And Stacking Of Good Quality Top Layer Garden Earth Free From Debris And Weeds At Site Including Royalty And Carriage With 5 Km Lead (Good Earth Measured In Stacks Will Be Reduced By 20 % For Payment) Only For Filling Of Pots And Flower Beds. , [Hsr 26.10] [Through Work] - Maintenance Of Fine Grass Lawn (Including Flower/Ground Cover Beds) For 03 Months Including Fertilizer Application, Dap @ 20 Gm/Sqm, Urea @ 40 Gm/Sqm, Watering, Weeding, Top Dressing With Good Earth And Manure Mixture 2:1 @ 0.01 Cum Per Sqm, Maintaining Fine Level, Regular Mowing And Removal Of Rubbish With All Lifts And Leads. , [Hsr 26.15.1] [Through Work] - Maintenance Of Tree Plants For 03 Months For The 1St Three Years Of Age Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source, Application Of 10 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 G Dap Twice ,Replacement Of Casualty ,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.21] [Through Work] - Maintenance Of Specimen Tree For 03 Months Including Weeding, Hoeing , Plant Protection , Watering From Deptt. Source , Application Of 20 Ml Chlorpyriphos Four Times, 0.0289 Cum Fym Each,50 Gm Urea And 50 Gm Dap Twice, Replacement Of Casualty,Disposal Of Debris And Other Activities.Etc. , [Hsr 26.19.1] [Through Work] - Maintenance Of Shrub Plants For 03 Months Including Weeding, Hoeing, Plant Protection, Watering From Deptt. Source, Application Of 4 Ml Chloropyriphos Four Times In A Year, 0.0289 Cum Fym, 20 Gm Urea And 20 Gm Dap Twice, Replacement Of Casualty Etc. Individual Shrubs , [Hsr 26.35] [Through Work] - Maintaining The Hedges For 03 Months Including Watering, Hoeing Weeding Trimming And Shaping, Replacement Of Casualty As And When Noticed, Application Of Farm Yard Manure @ 0.0127 M Layer Over Surface, Application Of Insecticide Chloropyriphos @ 2 Ml Per Sqm Twice, Urea @ 40 Gm And Dap @ 10 Gm Per Sqm Once In A Year. , [Hsr 26.49] [Through Work] - Maintenance Of Outdoor Potted Plants For 03 Months Including Watering, Application Of Fertilizer Npk 20:20:20 @ 20 Gm, And Vermicompost 50 Gm, Manure, Snowcem/Apex Every Month, Replacement Of Pot Plate, Broken Pot, Dead Plant With Same Species Of Plant Etc. , [Hsr 26.1] [Through Work] - Supplying And Stacking At Site Of Work Well Decayed Farm Yard Manure From Any Available Source Approved By The Engineer-In-Charge Including Screening Through Sieve Of I.S. Designation 16 Mm With 5 Km Lead. , Supply Of Drusban 20% E.C In Ltr. Packing (Ns) , Supply Of Imidachloprid (Media) 17.8% E.C. In Ltr. Packing (Ns) , Supply Of Bavistin Fungicide (Carbendazim 50% Wp) (Ns) , Supply At Site Vermi Compost Manure. (Hsr Ho030) , Supply Of Well Grinded In Powder Form De-Oiled Neem Cake In Packed Gunny Bags. (Hsr 26.77) , Providing And Stacking Winter Seasonal F1-Hybrid Seedlings/Cuttings At Site Of Work Well Developed And Healthy Free From Disease In Per Tray And Each Tray Having 70 Nos. Plants As Per Direction Of The Officer-In-Charge.[Hsr Item 26.524.5] [Through Work] - Calendula Double , [Hsr Item 26.524.14] [Through Work] - Dahlia Double , [Hsr Item 26.524.15] [Through Work] - Daisy Hybrid , [Hsr Item 26.524.16] [Through Work] - Dianthus Hybrid , [Hsr Item 26.524.17] [Through Work] - Gazania Hybrid , [Hsr Item 26.524.20] [Through Work] - Marigold French Hybrid Dwarf , [Hsr Item 26.524.21] [Through Work] - Marigold Inca Hybrid , [Hsr Item 26.524.26] [Through Work] - Phlox Mix Colour Hybrid , [Hsr Item 26.524.28] [Through Work] - Salvia
Basic Detail
Tender No EE/HORT/PWD/Gurugram
Bidding Type Tender
Location
City Gurgaon
State Haryana
Key Dates
Publish Date 07 Oct 2026
Submission Date 21 Oct 2026
Open Date 22 Oct 2026
Finance
Tender Value 2.04 Lakhs
Tender Fee 1000
EMD 4080
Exemption Available
Document List
4d528f08-decc-4ea7-8557-3344d3f452ea.html
BOQ_632596.xls
Tendernotice_1.pdf
TohanaBusStand.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 21, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Oct 22, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 8 days

Tender Documents

Download All (ZIP) ↓
html

4d528f08-decc-4ea7-8557-3344d3f452ea.html

xls

BOQ_632596.xls

pdf

Tendernotice_1.pdf

pdf

TohanaBusStand.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender