Petroleum and Natural Gas Boards / Undertakings / PSU Closing in 12 days TDR #57908789

Bids Are invited for Custom Bid For Services - Part- A: Dupl-Belapur Region , Custom Bid For Services - Part- B: Tarapur Region , Custom Bid For Services - Part-C: Trombay Region , Custom Bid For Services - Part- D: Dppl- Belapur Region , Custom Bid

Issued by Boards / Undertakings / PSU · Thane, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Oct 2026
12 days left
EMD
92800
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thane → Maharashtra
EMD Exemption
Not Available
Quantity
7

Project Description

Bids Are invited for Custom Bid For Services - Part- A: Dupl-Belapur Region , Custom Bid For Services - Part- B: Tarapur Region , Custom Bid For Services - Part-C: Trombay Region , Custom Bid For Services - Part- D: Dppl- Belapur Region , Custom Bid For Services - Part- E: Thal Mangaon Region , Custom Bid For Services - Part- F: Pune Region , Custom Bid For Services - Part- G: Dabhol Region - Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations.

BOQ

Sl. No. Item TitleItem Description
1PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
2PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
3PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
4PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
5PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
6PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
7PAINTING OF ELECTRIC POLESPAINTING OF ELECTRIC POLES
8PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
9PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
10PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
11PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
12PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
13PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
14PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
15PAINTING OF ELECTRIC POLESPAINTING OF ELECTRIC POLES
16PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
17PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
18PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1A Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
19PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering, flow direction marking as per Painting System-1B Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
20PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON NON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF FINISH PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including application of finish paint, stenciling, numbering, flow direction marking as per Painting System-1C specification of annexure-B of Scope of Work with all supply of required materials such as paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
21PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEELPAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL
22PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING ON SWEATING SURFACE OF PIPING & STRUCTURAL STEEL INCLUDING SUPPLY & APLICATION OF PAINT ON ABOVE GROUND STATION PIPING & FACILITIES (Piping, Valves, Pipe Fitting, Vessels, Support Structures etc.) at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of primer and paint, stenciling, numbering, flow direction marking as per Painting System-2 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.
23PAINTING OF ELECTRIC POLESPAINTING OF ELECTRIC POLES
24PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.PAINTING OF ELECTRIC POLES INCLUDING SUPPLY & APLICATION OF PAINT at different pipeline installations (SV & IP stations, TOP, Dispatch (Supplier) & Recieving (Customer) terminals etc.) including surface preparation, application of paint, stenciling, numbering as per Painting System-4 Specification of annexure-B of Scope of Work with all supply of required materials such as primers, paints, solvents, thinners, consumables, service crew, scaffolding, tools & tackles, machinery, quality assurance, test instruments, DFT meter, PPEs required to complete the work in all aspects, terms and conditions as mentioned in Scope of Work & other parts of Contract document at the mentioned installations.

AI Tender Summary

OUR REF NO 57908789
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 28-10-2026
Authority
Authority Name Gas Authority Of India Limited
Work Description Bids Are invited for Custom Bid For Services - Part- A: Dupl-Belapur Region , Custom Bid For Services - Part- B: Tarapur Region , Custom Bid For Services - Part-C: Trombay Region , Custom Bid For Services - Part- D: Dppl- Belapur Region , Custom Bid For Services - Part- E: Thal Mangaon Region , Custom Bid For Services - Part- F: Pune Region , Custom Bid For Services - Part- G: Dabhol Region - Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1A Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1B Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Non Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Finish Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Application Of Finish Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-1C Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting On Sweating Surface Of Piping & Structural Steel , Painting On Sweating Surface Of Piping & Structural Steel Including Supply & Aplication Of Paint On Above Ground Station Piping & Facilities (Piping, Valves, Pipe Fitting, Vessels, Support Structures Etc.) At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Primer And Paint, Stenciling, Numbering, Flow Direction Marking As Per Painting System-2 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations. , Painting Of Electric Poles , Painting Of Electric Poles Including Supply & Aplication Of Paint At Different Pipeline Installations (Sv & Ip Stations, Top, Dispatch (Supplier) & Recieving (Customer) Terminals Etc.) Including Surface Preparation, Application Of Paint, Stenciling, Numbering As Per Painting System-4 Specification Of Annexure-B Of Scope Of Work With All Supply Of Required Materials Such As Primers, Paints, Solvents, Thinners, Consumables, Service Crew, Scaffolding, Tools & Tackles, Machinery, Quality Assurance, Test Instruments, Dft Meter, Ppes Required To Complete The Work In All Aspects, Terms And Conditions As Mentioned In Scope Of Work & Other Parts Of Contract Document At The Mentioned Installations.
Basic Detail
Tender No GEM/2026/B/8116296
Bidding Type Tender
Location
City Thane
State Maharashtra
Key Dates
Publish Date 07 Oct 2026
Submission Date 28 Oct 2026
Open Date 29 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 92800
Exemption Not Available
Document List
6a394e8c-5e0b-458a-902f-dfa0eb72f139.pdf
1791368660.xlsx
1791369247.pdf
1791181972.pdf
1791347098.pdf
1791347103.pdf
ITBC52_d06e459c-29da-4ab5-8b421791348495731_vishnukant.docx

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 07, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 12 days
Oct 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
pdf

6a394e8c-5e0b-458a-902f-dfa0eb72f139.pdf

xlsx

1791368660.xlsx

pdf

1791369247.pdf

pdf

1791181972.pdf

pdf

1791347098.pdf

pdf

1791347103.pdf

docx

ITBC52_d06e459c-29da-4ab5-8b421791348495731_vishnukant.docx