Tender For Maintenance Of Electrical Installation In Govt. Residential Building At Chandigarh. (Rewinding/ Repair Of Ceiling Fans & Exhaust Fans Etc. In Various Blocks Of Gmch-32 & 48, Mhi, Residential Area Sector-32 & 48 And Griid Building Sector-31
Tender Overview
Project Description
Tender for Maintenance Of Electrical Installation In Govt. Residential Building At Chandigarh. (Rewinding/ Repair Of Ceiling Fans & Exhaust Fans Etc. In Various Blocks Of Gmch-32 & 48, Mhi, Residential Area Sector-32 & 48 And Griid Building Sector-31, Group Home & Ncc Building Sector-31, Chandigarh Under The Jurisdiction Of Sde, E-4, Chandigarh).
BOQ
| Sl. No. | Item Description |
| 1 | Full stator rewinding of ceiling fan (condenser type) of 1400 mm sweep with new copper winding wires including cleaning and insulating the stator slots, sleeving, soldering, wrapping of cotton tape, reassembling, varnishing and testing etc. complete. |
| 2 | Full stator rewinding of ceiling fan (condenser type) of 1200 mm sweep with new copper winding wires including cleaning and insulating the stator slots, sleeving, soldering, wrapping of cotton tape, reassembling, varnishing and testing etc. complete. |
| 3 | Providing split pin, check nuts, hanger nuts and bolts etc. including hanger if required to be replaced after removing the old. The rates includes re-erection of ceiling fan after repair and other petty material such a screws pin, bolts nuts etc. as per requirement at site. |
| 4 | Fabrication of shaft after removing the shaft from the stator body safely and then labour works for welding and turning of the same to give the original shape from workshop and other petty material required to complete the job to the entire satisfaction of Engineer-in-charge. |
| 5 | Replacement of ball bearing of ceiling fan including greasing, re-assembling and testing etc. |
| 6 | Supply and erection of fan condenser (paper condenser) for ceiling fan of following rating: The condenser is to be installed in existing ceiling fan after dismantling the defective condenser including connection and testing etc. The fan condenser should be of Epcos make. |
| 7 | Condenser 3.15 µ fd. |
| 8 | Full stator rewinding of Exhaust fan (condenser type) of 900/ 1400 RPM with new copper winding wires including cleaning and insulating the stator slots, sleeving soldering wrapping of cotton tape, varnishing re-assembling and testing etc. complete. |
| 9 | 12\\" Sweep |
| 10 | 15\\" Sweep |
| 11 | 18\\" Sweep |
| 12 | Supply and erection of rubber reel after dismantling the defective real including connection and testing etc. |
| 13 | S/E of ceiling fan/ exhaust fan aluminum Blades set of matching colour of existing ceiling fan/exhaust fan. The job includes the cost of fixing of new blades at site after dismantling the existing blades. |
| 14 | Full stator copper rewinding of Air Circulator fan 450 mm sweep with new copper winding wires including cleaning & insulating the stator slots, sleeving, soldering, wrapping of cotton tape, varnishing, re-assembling, testing etc. The job includes the cost of all the petty material require to complete the job to the entire satisfaction of Engineer in-charge. |
| 15 | Full stator copper rewinding of Air Circulator fan 600 mm sweep with new copper winding wires including cleaning & insulating the stator slots, sleeving, soldering, wrapping of cotton tape, varnishing, re-assembling, testing etc. The job includes the cost of all the petty material require to complete the job to the entire satisfaction of Engineer in-charge. |
| 16 | Replacement of existing defective control PCB kit of BLDC ceiling fan of different size and make. The job include cost of labour required for dismantling of existing PCB and erection the new PCB kit in existing fan at a suitable height of fan as per site requirement. The job also include cost of making incoming/ outgoing connections, labour and other petty material required to complete the job to the entire satisfaction of Engineer-in-charge of the work. The PCB kit should be compatible with existing BLDC fan, make and model as per requirement at site. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender