Tender For Shfting Constn.Of R And B Road Sai Temple To Chatratota Via Khairpur,Dharapuar,Raghunathpur,Usuma,Salara,Patakula,Malipur Road Under Mmsy-Trip Deposited By Serw Kataka Vide Lr.No.9102.Dt.3.9.2026
Tender Value
64.70 Lakhs
Estimated cost
Bid Submission
20 Oct 2026
3 days left
EMD
64709
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Shfting Constn.Of R And B Road Sai Temple To Chatratota Via Khairpur,Dharapuar,Raghunathpur,Usuma,Salara,Patakula,Malipur Road Under Mmsy-Trip Deposited By Serw Kataka Vide Lr.No.9102.Dt.3.9.2026
BOQ
| Sl. No. | Item Description |
| 1 | 11 KV Cut Point with 90 Degree AnglePSC POLE 10 METER LONG 330 KG. |
| 2 | PSC Pole Clamp(GI) |
| 3 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no's Channel(GI) required = (4x9.56x1.2) |
| 4 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr., length, 15 no's required = (16x2.36x0.280) |
| 5 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr., 4 no's Channel(GI) required = (4x9.56x0.306) |
| 6 | Danger Plate, 1 no's. |
| 7 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 8 | GI barbed wire anticlimbing device 3 Kg, Per support |
| 9 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 10 | 11 KV pin insulator polymer |
| 11 | H W fitting(B&S) 70KN, 3Bolt |
| 12 | Disc insulator (B&S) 70 KN polymer |
| 13 | Earthing of Support ( Coil Type ) |
| 14 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr., For connecting pole with Coil earthing |
| 15 | WEDGE CONNECTOR FOR 80 SQMM.CONDUCTOR |
| 16 | POLYCARBONATE BIRD GUARD |
| 17 | H.T. Stay clamp. 50x5 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required (1 Pair) |
| 18 | H.T. Stay set (Complete) |
| 19 | H.T. Stay Insulator Type-C |
| 20 | 7/10 SWG Stay Wire 15kg /stay |
| 21 | GI Nut, Bolt & Washer of different sizes (7.433 Kg each Cut Pole) |
| 22 | Black Paint(GIS Numbering & Zebra Stripping) |
| 23 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 24 | Civil & ServiceFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5) Stay clamps with Nuts & bolts BA will do the excavation including excavation, supply of0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mmBHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 25 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1600mm) = 0.42Cu.mtr(Per Pole) |
| 26 | 11 KV Pin Points With WPBPSC POLE 10 METER LONG 330 KG. |
| 27 | PSC Pole Clamp(GI) |
| 28 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 29 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 30 | Danger Plate, 1 no's, for each pole |
| 31 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 32 | GI barbed wire anticlimbing device 3 Kg, Per support |
| 33 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 34 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 35 | Earthing of Support ( Coil Type ) |
| 36 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr., For connecting pole with Coil earthing |
| 37 | GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 38 | 80 sq.mm AAA conductor |
| 39 | Black Paint(GIS Numbering & Zebra Stripping) |
| 40 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 41 | POLYCARBONATE BIRD GUARD |
| 42 | Civil & ServiceConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1600mm) = 0.42Cu.mtr(Per Pole) |
| 43 | DP With AB SwitchPSC POLE 10 METER LONG 330 KG. |
| 44 | PSC Pole Clamp(GI) |
| 45 | Top Channel(GI) 100X50X6mm, 9.50 KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required = (2x9.56x3) |
| 46 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 47 | AB switch Mounting Channel(GI) 75X40X4.8mm, 7.14KG/Mtr., each Channel(GI) length 3 mtr., 2 no's Channel(GI) required = (7.14x3x2) |
| 48 | AB Switch Side Support Channel(GI) 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required = (9.56x2x0.35) |
| 49 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 0.8 Mtr., 1 no's Channel(GI) required = (7.14x0.8x1) |
| 50 | Double Pole Belting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3 Mtr., 2 no's Channel(GI) required = (7.14x3x2) |
| 51 | 50x50x6mm,GI Bracing Angle(GI), 4.5Kg/mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 52 | Danger Plate, 2 no's. |
| 53 | Back Clamp for danger Plate 25X3 mm, Flat(GI), 0.59Kg/Mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 54 | H.T. Stay clamp, 50X3 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 55 | H.T. Stay set (Complete) |
| 56 | H.T. Stay Insulator Type-C |
| 57 | 7/10 SWG Stay Wire 15kg /slay |
| 58 | GI Pipe Earthing 40mm. 3 Mtr. Long |
| 59 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (12.5 Mtr. For L.A, 3 Mtr for AB Switch Body, 2.5 mtr. For mesh formation and 2.5 mtr. for raising)= 20.5x2.35 |
| 60 | GI barbed wire anticlimbing device 3 Kg. Per support, 2 no's qty. required =(2x3kg) |
| 61 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr, Flat(CI) of 0.510mtr length 8 no's = (6x0.59x0.510) |
| 62 | Lightning Arrester(12KV,10KA) (Station Class,class-2) |
| 63 | AB Switch (11KV,400A,3pole,50Hz) |
| 64 | 11 KV pin insulator polymer |
| 65 | H W fitting(B&S) 70KN, 3Bolt |
| 66 | Disc insulator (B&S) 70 KN polymer |
| 67 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 68 | POLYCARBONATE BIRD GUARD |
| 69 | GI Nut, Ball & Washer of different sizes (13.718 Kg each DP with AB Switch) |
| 70 | Black Paint(GIS Numbering & Zebra Stripping) |
| 71 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 72 | Civil & ServiceFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5) Stay clamps with Nuts & bolts (BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 73 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1067mm) = 0.42Cu.mtr(Per Pole) |
| 74 | Provide necessary civil material for construction of Earthling chamber, excavation &Installation of incuding earthingpipe dia up to 100mm dia for length of 3Mtr.Scope also includes necessary nutbolt, 25 Kg. Bentonite Power, connection & welding with incoming earth Flat(GI). The work to be executed as per TPCODL drawing & design |
| 75 | Cut Point with 180 Degree AnglePSC POLE 10 METER LONG 330 KG. |
| 76 | PSC Pole Clamp(GI) |
| 77 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 2 no's Channel(GI) required = (2x9.56x1.2) |
| 78 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mtr., each 0.280 mtr. length, 8 no's required = (8x2.36x0.280) |
| 79 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 0.306 mtr, 2 no's Channel(GI) required = (2x9.56x0.306) |
| 80 | Danger Plate, 1 no's. |
| 81 | Back Clamp for danger Plate 25X3 mm, Flat(GI), 0.59Kg/Mtr, Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 82 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 83 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr, Flat(CI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 84 | 11 KV pin insulator polymer |
| 85 | H W fitting(B&S) 70KN, 3Bolt |
| 86 | Disc insulator (B&S) 70 KN polymer |
| 87 | Earthing of Support ( Coil Type ) |
| 88 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 89 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 90 | POLYCARBONATE BIRD GUARD |
| 91 | GI Nut, Ball & Washer of different sizes (3.55 Kg each Cut Pole) |
| 92 | Black Paint(GIS Numbering & Zebra Stripping) |
| 93 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 94 | Civil & ServiceConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1067mm) = 0.42Cu.mtr(Per Pole) |
| 95 | 11 KV Cut Point with 90 Degree AnglePSC POLE 10 METER LONG 330 KG. |
| 96 | PSC Pole Clamp(GI) |
| 97 | Straight Cross Arm 100X50X6mm, 9.56 KG/Mtr., each Channel(GI) length 1.2 mtr., 4 no'sChannel(GI) required =(4x9.56x1.2) |
| 98 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mir., each 0.280 mtr, length, 16 no's required = (16x2.36x0.200)(1x0.59x0.510) |
| 99 | Straight Cross Arm 100X50X6 mm, 9.56 KG/Mtr., each Channel(GI) length 0.300 mtr., 4 no'sChannel(GI) required =(4x9.56x0.306) |
| 100 | Danger Plate, 1 no's |
| 101 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr, Flat(GI) of 0.510mtr length 1 no's =(1x0.59x0.510) |
| 102 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 103 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's= (4x0.59x0.510) |
| 104 | 11 KV pin insulator polymer |
| 105 | H W fitting(B&S) 70KN, 3Bolt |
| 106 | Disc insulator (B&S) 70 KN polymer |
| 107 | Earthing of Support ( Coil Type ) |
| 108 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr., For connecting pole with Coil earthing |
| 109 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 110 | POLYCARBONATE BIRD GUARD |
| 111 | H.T. Stay clamp. 50x5 mm. Flat(GI), 3.14Kg/Mtr., 0.551 Mtr. Length, 2 no's qty. required ( 1 Pair) |
| 112 | H.T. Stay set (Complete ) |
| 113 | H.T. Stay Insulator Type-C |
| 114 | 7/10 SWG Stay Wire 15kg /stay |
| 115 | GI Nut, Bolt & Washer of different sizes (7,433 Kg each Cut Pole) |
| 116 | Black Paint(GIS Numbering & Zebra Stripping) |
| 117 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 118 | Civil & ServiceFixing of complete 11KV line Complete stay set includes1) Turn Buckle Assembly2) Stay Rod & Stay plate3) Stay Insulator4) Stay Wire.5) Stay clamps with Nuts & bolts (BA will do the excvation including excvation, supply of 0.5Cum cement concrete foundation 1:2:4 size ( 500mmx500mmx800mm) using 20mm BHG metal with all labour and material as per TPCODL Drawing & Standard. |
| 119 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1067mm) = 0.42Cu.mtr(Per Pole) |
| 120 | 11 KV Pin Points With WPBPSC POLE 10 METER LONG 330 KG. |
| 121 | PSC Pole Clamp(GI) |
| 122 | 11 KV V cross Arm(GI) (10.2 K.g. each ) |
| 123 | Top bracket 100x50X6 mm GI Channel(GI) (2kg each) |
| 124 | Danger Plate, 1 no's, for each pole |
| 125 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 126 | GI barbed wire anticlimbing device 3 Kg, Per support |
| 127 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 4 no's = (4x0.59x0.510) |
| 128 | 11 KV pin insulator polymer, 3 Nos. required for each support |
| 129 | Earthing of Support ( Coil Type ) |
| 130 | No-8 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr., For connecting pole with Coil earthing |
| 131 | GI Nut, Bolt & Washer of different sizes (1.45 Kg/ Pin Point) |
| 132 | 55 sq.mm AAA conductor |
| 133 | Black Paint(GIS Numbering & Zebra Stripping) |
| 134 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 135 | POLYCARBONATE BIRD GUARD |
| 136 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1067mm) = 0.42Cu.mtr(Per Pole) |
| 137 | Part - iii: Construction of 2 no's of 11KV Line Protecting Guarding on Single Pole for Road Crossing.Guarding Channel(GI) 75x40x4.8 mm, 7.14 KG/Mtr., each Channel(GI) length 2.2 mtr., 4 no's Channel(GI) required =(4x7.14x2.2) (For Single Pole) |
| 138 | No-6 GI wire (0.192 kg/mtr.) for Main String |
| 139 | No-S GI wire (0.131 kg/mtr.) for lacing |
| 140 | Eye Bolt (236mm, 16mm dia, 1.577kg/mtr.) |
| 141 | Gi Pipe Earthing 40mm, 3 Mtr. Long |
| 142 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (10.7 mtr For raising)= 10.7x2.36 |
| 143 | Civil & ServiceConstruction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonite powder, calculation of earth resistance, including installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 144 | PART- iv : Shifting & Construction of one number of plinth for existing 11/0.43 KV, 250 KVA DSS.Plinth Mounted DSSPSC POLE 10 METER LONG 330 KG |
| 145 | 9 Mtr. long 300 Kg. PSC Pole |
| 146 | Pole clamp for EYE hook for (XLPE aerial bunched Cable) |
| 147 | EYE hook for XLPE Aerial bunched Cable |
| 148 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 149 | Pole Clamp |
| 150 | LT Cable raising Channel(GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg./Mir., 6 No's.) (Each 6x1.000x7.14= 42.84 Kg) |
| 151 | Top Channel(GI) GI 100 X 50 X 6 MM (3000 mm long) (9.56Kg./Mir., 2 No's.) (Each 2x3.000x9.56= 57.36 Kg) |
| 152 | Fish Plate(GI) 50x6 mm., 2.36 kg/Mir., each 0.280 mtr. length, 6 no's required = (6x2.36x0.280) |
| 153 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mir., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 154 | AB Switch Side Support Channel(GI) 100X50X6mm,9.56 Kg/Mtr., each Channel(GI) longth 0.35 mtr., 2 no's Channel(GI) required = (9.56x2x0.35) |
| 155 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14Kg/Mtr., each Channel(GI) longth 0.8 Mtr., 1 no's Channel(GI) required = (7.14x0.8x1) |
| 156 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg./Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 157 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long, 2 No's.) (7.14Kg./Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 158 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg./Mtr., 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 159 | Double Pole Bolting Channel(GI) 75X40X 4.8mm., 7.14KG/Mtr., each Channel(GI) length 3.0 Mtr., 2 no's Channel(GI) required = (7.14x3x2) |
| 160 | 50x50x6mm.GI Bracing Angle(GI), 4.5Kg./mtr., each Angle(GI) length 3.512 mtr., 2 nos Angle(GI) required = (4.5x3.512x2) |
| 161 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. For mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.8 mtr for HG Fuse, 5x2 mtr. for DTR Nutral, (1.3+4.5) Mtr. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) (Each 65.6x 2.36= 154.81 Kg) |
| 162 | LT Distribution Box with MCCB, Aluminium Busbar for 3 Bay with kit kat fuse for 250 KVA S/S |
| 163 | 50 SQ.MM, AAAC XLPE Covered Conductor |
| 164 | 1Cx 400 mm2 LT XLPE Cable(Un-Armoured) |
| 165 | LT Cable Supporting Channel(GI) 50 X 50 X 6 MM GI Channel(GI) (2000 mm long)(9.56 Kg/Mtr., 2 No's.) (Each 2x2.0x9.56 = 38.24 Kg) |
| 166 | LT Cable Supproting Angle(GI), 50x50x6mm.GI 4.5Kg./Mtr., each Angle(GI) length 2 mtr., 4 nos Angle(GI) required = (4.5x4x2) |
| 167 | Supply of 1.1kV, 4Core, 150 sqmm, XLPE insulation armoured -Aluminium UG cable from LTDB to Pole |
| 168 | AB Switch(11KV,200A,3pole,50HZ) |
| 169 | H.G.Fuse( 11KV,200A,3Pole) |
| 170 | WEDGE CONNECTOR for 55 SQ.MM.CONDUCTOR |
| 171 | POLYCARBONATE BIRD GUARD |
| 172 | Disc insulator (B&S)70 KN polymer |
| 173 | HW fitting (B&S)70KN(3boted) |
| 174 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 175 | 11KV pin insulator polymer |
| 176 | HT stay set complete |
| 177 | HT stay Clamp (1.9Kg/pair) |
| 178 | HT stay insulator TYPE-C |
| 179 | 7/10 SWG GI stay wire, Grade -2 (15Kg./Set) |
| 180 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 mir .Long |
| 181 | Gl Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 182 | GI barbed wire/Anticlimbing device (3Kg /Pole) |
| 183 | Back Clamp for anticlimbing device 25X3 mm, Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 184 | Danger plate 11kv |
| 185 | Back Clamp for danger Plate 25X3 mm, Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 1 no's = (1x0.59x0.510) |
| 186 | Name plate |
| 187 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 188 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 189 | Civil & ServiceConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1700mm) = 0.425Cu.m(Per Pole) (For 10 Mtr |
| 190 | PCC ratio 1:3:6(M-10 Grade) for DSS Area (3.5X2.5X0.1) = 0.875 Cu. mtr. |
| 191 | Fixing of stay set with 0.5Cum. cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay insulator. |
| 192 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonite powder , calculation of earth resistance, including installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 193 | LTDB Plinth |
| 194 | DTR Plinth |
| 195 | Laying of 4 Cx 150 mm2 LT XLPE Cable |
| 196 | Laying of 1.1kV cable from 400 to 1000sqmm |
| 197 | SITC and Erection of GI Fencing with Gate |
| 198 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.m(Per Pole) (For PSC Pole) |
| 199 | Supply of AL Lugs suitable for 400 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 200 | Supply of AL Lugs suitable for 150 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 201 | Supp. and erection of double Compression Flameproof Type Glanding for armored Cable 1C 300-1000 sqmm including making hole in Base plate and dressing of cable along with vermin proofing property. Supply to be done as per TPCODL Spec and approved make dowells. |
| 202 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 120-185sqmm including making hole in Base plate and dressing of cable along with vermin proofing property Supply to be done as per TPCODL Spec and approved make dowells. |
| 203 | PART v : Shifting & Construction of 3 no's of plinth for existing 11/0.43 KV, 63 KVA DSS.Plinth Mounted DSSWPB (GI) Pole 160x152 (11Mtr Long, 30.44KG/Mtr) - (Total Pole Weight with Base Plate & Stiffner =331.04 KG+10.74 KG= 341.58 KG) |
| 204 | 9 Mtr. long 300 Kg. PSC Pole |
| 205 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 206 | EYE hook for XLPE Aerial bunched Cable |
| 207 | Dead End Clamp suitable for messenger XLPE Aerial bunched Cable |
| 208 | LT Cable resting Channel (GI) 75x40x4.8 mm GI Channel(GI) (1000 mm long)(7.14Kg/Mtr., 3 No's.) (Each 3x1.000x7.14= 21.42 Kg) |
| 209 | Top Channel (GI) GI 100 X 50 X 6 MM (3000 mm long)(9.56Kg/Mtr, 2 Nos.) (Each 2x3.000x9.56= 57.36 Kg) |
| 210 | Fish Plate(GI) 50x6 mm, 2.36 kg/Mtr., each 0.200 mtr. length, 8 no's required = (6x2.36x0.280) |
| 211 | AB Switch Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long)(7.14Kg/Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 212 | AB Switch Side Support Channel(GI) 100x50x6imm,9.56 KG/Mtr., each Channel(GI) length 0.35 mtr., 2 no's Channel(GI) required=(9.56x2x0.35) |
| 213 | Channel(GI) Support for down Pipe 75X40X 4.8mm., 7.14Kg/Mtr., each Channel(GI) length 0.8 mtr., 1 no's Channel(GI) required=(7.14x0.8x1) |
| 214 | HG/ DO Fuse Mounting Channel(GI) 75x40x4.8 mm GI Channel(GI) (3000 mm long) (7.14Kg/Mtr., 2 No's.) (Each 2x3.000x7.14= 42.84 Kg) |
| 215 | Cantilever Support Channel(GI) 75x40x4.8 mm GI Channel(GI) (810 mm long, 2 No's.) (7.14Kg/Mtr., 2 No's.) (Each 2x0.810x7.14= 11.57 Kg) |
| 216 | Cantilever Support Angle(GI) 50 X 50 X 6MM GI (1282 mm long) (4.5Kg/Mtr, 2 No's.) (Each 2x1.282x4.5= 11.54Kg) |
| 217 | Transformer Base GI Channel(GI) 100 X 50 X 6 MM (3000 mm long) (9.56Kg/Mtr.) (Each 2x3.000x9.56= 57.36 Kg) |
| 218 | Transformer Base Support GI Channel(GI) 100 X 50 X 6 MM (515 mm long) (9.56Kg/Mtr.) (2x0.515x9.56= 9.85Kg) |
| 219 | Transformer Belting Angle(GI) 50 X 50 X 6MM GI (3000 mm long)(4.5Kg/Mtr.) (Each 2x3.0x4.5 Kg) |
| 220 | Transformer Belting Support Angle(GI) 50 X 50 X 6MM GI (580 mm long)(4.5Kg/Mtr.) (Each 2x0.580x4.5= Kg) |
| 221 | LTDB Mounting Angle(GI) 50 X 50 X 6MM GI (1000 mm long)(4.5Kg/Mtr.) (Each 2x1x4.5 Kg) |
| 222 | 50x6mm Flat(GI) for earthing, 2.36kg/mtr., (2.5x7 mtr. for mesh formation, 12 Mtr. For LA and 2.5 mtr. For raising, 11 mtr for AB switch, 2.6 mtr for HG Fuse, 5x2 mtr. for DTR Nuiral. (1.3+4.5) mir. For DTR Body, 0.500 mtr for LTDB & AB Switch operating handle, 3 mtr. for Fencing) (Each 65.6x 2.36= 154.81 Kg) |
| 223 | LT Distribution Box with MCCB, Aluminium Busbar of single Bay with kit kat fuse for 63 KVA S/S |
| 224 | 50 SQ.MM. AAAC XLPE Covered Conductor |
| 225 | 14 Cx 95 mm2 LT XLPE Cable(Armoured) - FOR 63 KVA Trf. |
| 226 | 14 Cx 95 mm2 LT XLPE CABLE (Armoured) - FROM LTDB to Pole |
| 227 | AB Switch 11KV, 200A, 3pole, 50Hz |
| 228 | HG/FUSE 11KV,200A,3POLE |
| 229 | WEDGE CONNECTOR FOR 55 SQMM.CONDUCTOR |
| 230 | POLYCARBONATE BIRD GUARD |
| 231 | Disc insulator (G&S) 70 KN POLYMER |
| 232 | H W fitting (G&S)70KN(3bolled) |
| 233 | Lightning Arrester(12KV, 10KA) Station Class 2 |
| 234 | 11KV pin insulator polymer |
| 235 | HT stay set complete |
| 236 | HT stay Clamp (1.9kg/pair) |
| 237 | HT stay insulator TYPE-C |
| 238 | 7/10 SWG GI stay wire, Grade -2 (15Kg / Set) |
| 239 | 40 mm Nominal bore Gl pipe (medium gauge) earthing device with 3 mtr.Long |
| 240 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 241 | GI Barbed wire/Anticlimbing device (3kg/Pole) |
| 242 | Back Clamp for anticlimbing device 25X3 mm. Flat(Gl), 0.59Kg/Mtr, Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 243 | Danger plate 11kv |
| 244 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr, Flat(GI) of 0.510mtr length 2 no's = (2x0.59x0.510) |
| 245 | Name plate |
| 246 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 247 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 248 | Civil & ServiceConcreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1000mm) = 0.450Cu.mtr (Per Pole) (For WPB Pole) |
| 249 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX450mm) = 0.113Cu.mtr (Per Pole) |
| 250 | PCC ratio 1:3:6(M-10 Grade) For OSS Area (5X3X0.1) = 1.5 Cu. mtr. |
| 251 | Fixing of stay set with 0.5Cum. cement concrete foundation 1:3:6(M-10 Grade) size ( 900mmx600mmx900mm) using 40mm BHG metal with all labor and material except stay set, stay wire, stay insulator. |
| 252 | Construction Earthing chamber including Installation of earthing pipe.Making earthing chamber including excavation, soil treatment with bentonite powder, calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm Including welding of Flat(GI) around pipe. |
| 253 | Laying of 4 Cx 95 mm2 LT XLPE Cable |
| 254 | SITC and Erection of GI Fencing with Gate |
| 255 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr (Per Pole) (For PSC Pole) |
| 256 | Supply of AL Lugs suitable for 95 sq mm cable/conductor, Crimping with cable and Fixing/connecting include supply and erection of PVC Tape as per voltage requirement. |
| 257 | Supply and erection of double Compression Flameproof Type Glanding for armored Cable 3.5/4C 50-95sqmm including making hole in Base plate and dressing of cable along with vermin proofing properly. Supply to be done as per TPCODL Spec and approved make dowells. |
| 258 | PART VI : Construction of LT OH line for 4.670 CKM by using 1.1 KV 4CX50 mm² + 1CX50 mm² +1CX16 mm² AB CablePlinth Mounted DSS9 Mtr. long 300 Kg. PSC Pole |
| 259 | LT Stay set Complete |
| 260 | 7/12 SWG GI stay wire, Grade -2 |
| 261 | LT stay Clamp (1.40Kg/pair) |
| 262 | LT Stay insulator |
| 263 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 264 | EYE hook for XLPE Aerial bunched Cable |
| 265 | Dead End clamp suitable for messenger XLPE Aerial bunched Cable |
| 266 | Suspension Clamp with EYE hook for ABC |
| 267 | 4CX50 mm² (P)+1CX50 mm²(M)+1CX16 mm²(Street Light) (LT AB Cable) |
| 268 | Insulated piercing connector.Type-A-main 50 to 150 sq.mm & Tap-50 to 150 sq.mm |
| 269 | GI Pipe Earthing (each 5th pole to earth) |
| 270 | Coil Earthing |
| 271 | No-6 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 272 | Danger plate (LT) |
| 273 | Back Clamp for danger plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.51mlr length 1 no's = (1x0.59x0.51) |
| 274 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 275 | Back Clamp for anticlimbing device 25X3 mm, Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.510mtr length 8 no's = (8x0.59x0.510) |
| 276 | GI Nuts & Bolts of Assorted size (25 Kg/ DSS DP) |
| 277 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 278 | Black Colour Paint(GIS Numbering & Zebra Stripping) for numbering |
| 279 | Fixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 280 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 281 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 282 | PART VII : Construction of LT OH line for 0.390 CKM by using 2C×35 mm² (P)+1C×25 mm²(M) AB Cable9 Mtr. long 300 Kg. PSC Pole |
| 283 | LT Stay set Complete |
| 284 | 7/12 SWG GI stay wire, Grade -2 |
| 285 | LT stay Clamp (1.40Kg/pair) |
| 286 | LT Stay insulator |
| 287 | Pole clamp for EYE hook for (XLPE Aerial bunched Cable) |
| 288 | EYE hook for XLPE Aerial bunched Cable |
| 289 | Dead End clamp suitable for messenger XLPE Aerial bunched Cable |
| 290 | Suspension Clamp with EYE hook for ABC |
| 291 | 2CX35 + 1X25 (LT AB Cable) |
| 292 | Insulated piercing connector.Type-B-main 25 to 150 sq.mm & Tap-6 to 35 sq.mm |
| 293 | GI Pipe Earthing (each 5th pole to earth) |
| 294 | Coil Earthing |
| 295 | No-6 GI wire (Dia 4.6mm) 0.131 KG/ Mtr.- 2 Mtr. For connecting pole with Coil earthing |
| 296 | Danger plate (LT) |
| 297 | Back Clamp for danger Plate 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.51mlr length 1 no's = (1x0.59x0.51) |
| 298 | GI barbed wire anticlimbing device 3 Kg. Per support |
| 299 | Back Clamp for anticlimbing device 25X3 mm. Flat(GI), 0.59Kg/Mtr. Flat(GI) of 0.51mlr length 4 no's = (4x0.59x0.51) |
| 300 | GI Nut, Bolt & Washer of different sizes (0.5 Kg/ Pole) |
| 301 | Black Paint(GIS Numbering & Zebra Stripping) |
| 302 | Yellow Colour Paint(GIS Numbering & Zebra Stripping) for Background |
| 303 | Civil & ServiceFixing of LT Complete stay set includes 1) Turn Buckle Assembly 2) Stay Rod & Stay plate 3) Stay Insulator 4) Stay Wire. 5)Stay clamps with Nuts & bolts, including excavation, supply of 0.5Cum cement concrete foundation 1:2:4 size (500mmx500mmx800mm) using 20mm BHG metal with all labour and material (Excavation of earth will be done of size 500X500X1500 mm.) |
| 304 | Concreting ratio 1:1.5:3(M-20 Grade) (500mmX500mmX1500mm) = 0.375Cu.mtr(Per Pole) |
| 305 | Construction Earthing chamber including installation of earthing pipe.Making earthing chamber including excavation , soil treatment with bentonide powder , calculation of earth resistance, including Installation of 3Mtr GI Pipe 40mm/50mm including welding of Flat(GI) around pipe. |
| 306 | Dismantalling MaterialsDismantling of 9/8 Mtr. PCC/Joist Pole |
| 307 | Dismantling / Removal of MS Channel from Double Pole Structure /pole |
| 308 | Dismantling of existing 11/0.4kV, 33/0.4kV, Three Phase Distribution Transformer 63KVA including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 309 | Dismantling of existing 11/0.4kV, 33/0.4kV, 250kVA Three Phase Distribution Transformer including removal of HT/LT leads, earth connections and unloading by crane if required. |
| 310 | Dismantling of ACSR/AAAC 34/ 55mm2 from overhead line |
| 311 | Dismantling of ACSR/AAAC 80/100 mm2 from overhead line |
| 312 | Dismantling of varous size of LT AB Cable Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 07, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 20, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysOct 21, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender