Environment and Forests Statutory Bodies & Commissions/Committees Closing in 9 days TDR #57886071

Bids Are invited for Sitc Of Two (2) Nos. Ups Output Distribution Boards And Two (2) Nos. Static Transfer Switches - Part A: Equipment (Supply, Installation, Testing, Commissioning And Five-Year On-Site Warranty), Ups Output Distribution Board (New U

Issued by Statutory Bodies & Commissions/Committees · Medchal Malkajgiri, Telangana
Tender Value
Ref. Documents
Estimated cost
Bid Submission
27 Oct 2026
9 days left
EMD
70000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Medchal Malkajgiri → Telangana
EMD Exemption
Available
Quantity
1

Project Description

Bids Are invited for Sitc Of Two (2) Nos. Ups Output Distribution Boards And Two (2) Nos. Static Transfer Switches - Part A: Equipment (Supply, Installation, Testing, Commissioning And Five-Year On-Site Warranty), Ups Output Distribution Board (New Ups Db-A And New Ups Db-B): Floor-Standing Psc Panel To Is/Iec 61439-1 And -2, Oem Design-Verified, Form 4B Type 2, Ip42, Icw 50 Ka 1 S, 630 A E-Cu Busbar 3P + 100% N + E. Incomer 400 A 4P Mccb, Lsig, Icu = Ics = 50 Ka, Modbus, In A Compartment Suitable For A 630 A Frame. Eight Outgoing Units All Suitable For 250 A Frame Mccbs, Fitted With 4 X 160 A, 2 X 125 A And 2 X 63 A 4P Mccbs (Icu 36 Ka Or More, In Oem-Verified Cascade). Modular, Extendable. Class 0.5S Mfm On Incomer And Class 1.0 Mfm On Each 160 A Unit, With Provision For Meters On The Other Units. Bms On/Off/Trip Contacts And Modbus To Terminal Block. Type 2 Spd, Space Heater, Internal Light, Labels, Danger Boards. Complete As Per Section 4A, With Factory Inspection, Installation, Testing And Commissioning By The Oem Or Its Authorised Partner. , Static Transfer Switch Sts-1, Not Less Than 200 A, Scr Type To Iec 62310-1 And -2, 415 V 3 Ph 4 W, 4 Pole, Transfer 6 Ms Or Less, Break-Before-Make, Integral Maintenance Bypass, Redundant Controls, Snmp / Modbus, As Per Section 4B. Installed In The Ups Room, Tested And Commissioned By The Oem Or Its Authorised Partner. , Static Transfer Switch Sts-2, Not Less Than 100 A, As Per Item 2 And Section 4B, Installed Near The Data Centre Server Racks. , Mounting Of Sts As Per Section 4C: Grouted Ms Base Channel (Or Matching Cubicle) For Sts-1; Floor-Standing Rack Of At Least 800 Mm Depth With Shelf Or Rails (Or Plinth) For Sts-2. , Part B: Site Works: Relocation Of Existing Ups Panels To The Stores Area In The Old Car Park, As Per Section 6. , Disconnection, Re-Routing, Re-Laying On Existing Trays And Re-Termination Of Existing Power Cables To Suit The New Positions, Including Ir Test Of Every Re-Used Cable; Earthing And Bonding Of The Boards, Sts And Mountings To The Existing Earth Grid (Two Connections Each, With Measurement, As Per Is 3043); And All Lugs, Glands, Sleeves, Ferrules, Fasteners, Hardware And Consumables Needed To Complete The Installation, As Per Section 5. , Part C: Contingency And Miscellaneous: Supply And Laying Of 1.1 Kv Xlpe Armoured Copper Cable, 4C X 95 Sq Mm, To Is 7098 (Part 1), On Existing Tray, With Glands, Lugs And Termination At Both Ends. Provisional Quantity, Only In Case Of Contingency, With The Written Approval Of The Engineer-In-Charge. Paid As Per Actual Measurement. , Any Other Item Required For Satisfactory Completion Of The Work, Covering Contingencies And Miscellaneous Site Related Works Not Specifically Listed In Items 1 To 7, As Per Section 3. Lump Sum.

BOQ

Sl. No. Item TitleItem Description
1PART A: EQUIPMENT (supply, installation, testing, commissioning and five-year on-site warranty), UPS output distribution board (New UPS DB-A and New UPS DB-B): floor-standing PSC panel to IS/IEC 61439-1 and -2, OEM design-verified, Form 4b Type 2, IP42, Icw 50 kA 1 s, 630 A E-Cu busbar 3P + 100% N + E. Incomer 400 A 4P MCCB, LSIG, Icu = Ics = 50 kA, Modbus, in a compartment suitable for a 630 A frame. Eight outgoing units all suitable for 250 A frame MCCBs, fitted with 4 x 160 A, 2 x 125 A and 2 x 63 A 4P MCCBs (Icu 36 kA or more, in OEM-verified cascade). Modular, extendable. Class 0.5S MFM on incomer and Class 1.0 MFM on each 160 A unit, with provision for meters on the other units. BMS ON/OFF/TRIP contacts and Modbus to terminal block. Type 2 SPD, space heater, internal light, labels, danger boards. Complete as per Section 4A, with factory inspection, installation, testing and commissioning by the OEM or its authorised partner.PART A: EQUIPMENT (supply, installation, testing, commissioning and five-year on-site warranty), UPS output distribution board (New UPS DB-A and New UPS DB-B): floor-standing PSC panel to IS/IEC 61439-1 and -2, OEM design-verified, Form 4b Type 2, IP42, Icw 50 kA 1 s, 630 A E-Cu busbar 3P + 100% N + E. Incomer 400 A 4P MCCB, LSIG, Icu = Ics = 50 kA, Modbus, in a compartment suitable for a 630 A frame. Eight outgoing units all suitable for 250 A frame MCCBs, fitted with 4 x 160 A, 2 x 125 A and 2 x 63 A 4P MCCBs (Icu 36 kA or more, in OEM-verified cascade). Modular, extendable. Class 0.5S MFM on incomer and Class 1.0 MFM on each 160 A unit, with provision for meters on the other units. BMS ON/OFF/TRIP contacts and Modbus to terminal block. Type 2 SPD, space heater, internal light, labels, danger boards. Complete as per Section 4A, with factory inspection, installation, testing and commissioning by the OEM or its authorised partner.
2Static transfer switch STS-1, not less than 200 A, SCR type to IEC 62310-1 and -2, 415 V 3 ph 4 W, 4 pole, transfer 6 ms or less, break-before-make, integral maintenance bypass, redundant controls, SNMP / Modbus, as per Section 4B. Installed in the UPS room, tested and commissioned by the OEM or its authorised partner.Static transfer switch STS-1, not less than 200 A, SCR type to IEC 62310-1 and -2, 415 V 3 ph 4 W, 4 pole, transfer 6 ms or less, break-before-make, integral maintenance bypass, redundant controls, SNMP / Modbus, as per Section 4B. Installed in the UPS room, tested and commissioned by the OEM or its authorised partner.
3Static transfer switch STS-2, not less than 100 A, as per Item 2 and Section 4B, installed near the data centre server racks.Static transfer switch STS-2, not less than 100 A, as per Item 2 and Section 4B, installed near the data centre server racks.
4Mounting of STS as per Section 4C: grouted MS base channel (or matching cubicle) for STS-1; floor-standing rack of at least 800 mm depth with shelf or rails (or plinth) for STS-2.Mounting of STS as per Section 4C: grouted MS base channel (or matching cubicle) for STS-1; floor-standing rack of at least 800 mm depth with shelf or rails (or plinth) for STS-2.
5PART B: SITE WORKS: Relocation of existing UPS panels to the stores area in the old car park, as per Section 6.PART B: SITE WORKS: Relocation of existing UPS panels to the stores area in the old car park, as per Section 6.
6Disconnection, re-routing, re-laying on existing trays and re-termination of existing power cables to suit the new positions, including IR test of every re-used cable; earthing and bonding of the boards, STS and mountings to the existing earth grid (two connections each, with measurement, as per IS 3043); and all lugs, glands, sleeves, ferrules, fasteners, hardware and consumables needed to complete the installation, as per Section 5.Disconnection, re-routing, re-laying on existing trays and re-termination of existing power cables to suit the new positions, including IR test of every re-used cable; earthing and bonding of the boards, STS and mountings to the existing earth grid (two connections each, with measurement, as per IS 3043); and all lugs, glands, sleeves, ferrules, fasteners, hardware and consumables needed to complete the installation, as per Section 5.
7PART C: CONTINGENCY AND MISCELLANEOUS: Supply and laying of 1.1 kV XLPE armoured copper cable, 4C x 95 sq mm, to IS 7098 (Part 1), on existing tray, with glands, lugs and termination at both ends. Provisional quantity, only in case of contingency, with the written approval of the Engineer-in-Charge. Paid as per actual measurement.PART C: CONTINGENCY AND MISCELLANEOUS: Supply and laying of 1.1 kV XLPE armoured copper cable, 4C x 95 sq mm, to IS 7098 (Part 1), on existing tray, with glands, lugs and termination at both ends. Provisional quantity, only in case of contingency, with the written approval of the Engineer-in-Charge. Paid as per actual measurement.
8Any other item required for satisfactory completion of the work, covering contingencies and miscellaneous site related works not specifically listed in Items 1 to 7, as per Section 3. Lump sum.Any other item required for satisfactory completion of the work, covering contingencies and miscellaneous site related works not specifically listed in Items 1 to 7, as per Section 3. Lump sum.

AI Tender Summary

OUR REF NO 57886071
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE Ref. Documents
LAST DATE 27-10-2026
Authority
Authority Name Department Of Earth Sciences
Work Description Bids Are invited for Sitc Of Two (2) Nos. Ups Output Distribution Boards And Two (2) Nos. Static Transfer Switches - Part A: Equipment (Supply, Installation, Testing, Commissioning And Five-Year On-Site Warranty), Ups Output Distribution Board (New Ups Db-A And New Ups Db-B): Floor-Standing Psc Panel To Is/Iec 61439-1 And -2, Oem Design-Verified, Form 4B Type 2, Ip42, Icw 50 Ka 1 S, 630 A E-Cu Busbar 3P + 100% N + E. Incomer 400 A 4P Mccb, Lsig, Icu = Ics = 50 Ka, Modbus, In A Compartment Suitable For A 630 A Frame. Eight Outgoing Units All Suitable For 250 A Frame Mccbs, Fitted With 4 X 160 A, 2 X 125 A And 2 X 63 A 4P Mccbs (Icu 36 Ka Or More, In Oem-Verified Cascade). Modular, Extendable. Class 0.5S Mfm On Incomer And Class 1.0 Mfm On Each 160 A Unit, With Provision For Meters On The Other Units. Bms On/Off/Trip Contacts And Modbus To Terminal Block. Type 2 Spd, Space Heater, Internal Light, Labels, Danger Boards. Complete As Per Section 4A, With Factory Inspection, Installation, Testing And Commissioning By The Oem Or Its Authorised Partner. , Static Transfer Switch Sts-1, Not Less Than 200 A, Scr Type To Iec 62310-1 And -2, 415 V 3 Ph 4 W, 4 Pole, Transfer 6 Ms Or Less, Break-Before-Make, Integral Maintenance Bypass, Redundant Controls, Snmp / Modbus, As Per Section 4B. Installed In The Ups Room, Tested And Commissioned By The Oem Or Its Authorised Partner. , Static Transfer Switch Sts-2, Not Less Than 100 A, As Per Item 2 And Section 4B, Installed Near The Data Centre Server Racks. , Mounting Of Sts As Per Section 4C: Grouted Ms Base Channel (Or Matching Cubicle) For Sts-1; Floor-Standing Rack Of At Least 800 Mm Depth With Shelf Or Rails (Or Plinth) For Sts-2. , Part B: Site Works: Relocation Of Existing Ups Panels To The Stores Area In The Old Car Park, As Per Section 6. , Disconnection, Re-Routing, Re-Laying On Existing Trays And Re-Termination Of Existing Power Cables To Suit The New Positions, Including Ir Test Of Every Re-Used Cable; Earthing And Bonding Of The Boards, Sts And Mountings To The Existing Earth Grid (Two Connections Each, With Measurement, As Per Is 3043); And All Lugs, Glands, Sleeves, Ferrules, Fasteners, Hardware And Consumables Needed To Complete The Installation, As Per Section 5. , Part C: Contingency And Miscellaneous: Supply And Laying Of 1.1 Kv Xlpe Armoured Copper Cable, 4C X 95 Sq Mm, To Is 7098 (Part 1), On Existing Tray, With Glands, Lugs And Termination At Both Ends. Provisional Quantity, Only In Case Of Contingency, With The Written Approval Of The Engineer-In-Charge. Paid As Per Actual Measurement. , Any Other Item Required For Satisfactory Completion Of The Work, Covering Contingencies And Miscellaneous Site Related Works Not Specifically Listed In Items 1 To 7, As Per Section 3. Lump Sum.
Basic Detail
Tender No GEM/2026/B/8121782
Bidding Type Tender
Location
City Medchal Malkajgiri
State Telangana
Key Dates
Publish Date 06 Oct 2026
Submission Date 27 Oct 2026
Open Date 28 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 70000
Exemption Available
Document List
88cda1af-51cc-4c7d-8844-3db3eaf21444.pdf
1791277036.xlsx
tendoc_2026-10-06-14-20-15_b347e575ce807af596f04b9c64cce659.pdf
1791276756.pdf
finltendoc_e5c736e7-4e88-4aac-b9871791277354129_SKINCOIS.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 27, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Oct 28, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

88cda1af-51cc-4c7d-8844-3db3eaf21444.pdf

xlsx

1791277036.xlsx

pdf

tendoc_2026-10-06-14-20-15_b347e575ce807af596f04b9c64cce659.pdf

pdf

1791276756.pdf

pdf

finltendoc_e5c736e7-4e88-4aac-b9871791277354129_SKINCOIS.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender