Railways Government Departments Closing in 5 days TDR #57882626

Supply Of Front part complete LHB type coach.

Issued by Government Departments · Rae Bareli, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Oct 2026
5 days left
EMD
54190
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Rae Bareli → Uttar Pradesh
EMD Exemption
Not Available
Quantity
14

Project Description

Supply Of front part complete lhb type coach. , front part complete [schedule of infrastructural requirements to specification no mdts 21261 rev. 03 dated: 20.03.2020] to be masked as per drawing number mi005396 alt. hm for lhb ty pe coach. as per drawing no : 1 11012.0.03.131.001 anx-1 note : (a) 8 mm thick additional stiffening members are required for the front part of under frame for the lhb type coaches as per drawing no. rdso/cg/drg/26009. (b) the dimension of hub flange shall be 136mm (after machining, ref. drawin g number: 1 10113.1.03.121.002 alt. r1). (c) the dimension of center of cbc center ensures 146mm & 163 mm (ref. drawing number: le11460 alt. nil, sheet 1). (d) dimension 309mm, 82.5mm and 75 mm from buffer plate (ref. drawing number: 2 10113.0.03.130.112 alt. er2). special condition : to m aintain the limit of straightness and twist in front part of the under frame, inspection fixture to drawin g no xj003601 alt. a is to be followed to improve the quality of front part & under frame of lhb coac hes. [ warranty period: 84 months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 57882626
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 28-10-2026
Authority
Authority Name Modern Coach Factory
Work Description Supply Of front part complete lhb type coach. , front part complete [schedule of infrastructural requirements to specification no mdts 21261 rev. 03 dated: 20.03.2020] to be masked as per drawing number mi005396 alt. hm for lhb ty pe coach. as per drawing no : 1 11012.0.03.131.001 anx-1 note : (a) 8 mm thick additional stiffening members are required for the front part of under frame for the lhb type coaches as per drawing no. rdso/cg/drg/26009. (b) the dimension of hub flange shall be 136mm (after machining, ref. drawin g number: 1 10113.1.03.121.002 alt. r1). (c) the dimension of center of cbc center ensures 146mm & 163 mm (ref. drawing number: le11460 alt. nil, sheet 1). (d) dimension 309mm, 82.5mm and 75 mm from buffer plate (ref. drawing number: 2 10113.0.03.130.112 alt. er2). special condition : to m aintain the limit of straightness and twist in front part of the under frame, inspection fixture to drawin g no xj003601 alt. a is to be followed to improve the quality of front part & under frame of lhb coac hes. [ warranty period: 84 months after the date of delivery ] ]
Basic Detail
Tender No 11261125
Bidding Type Tender
Location
City Rae Bareli
State Uttar Pradesh
Key Dates
Publish Date 06 Oct 2026
Submission Date 28 Oct 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 54190
Exemption Not Available
Document List
586d819f-bab2-4c3b-9b6d-0c59e5cc3d6a.pdf
5920823.pdf
5924658.pdf
5924943.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
pdf

586d819f-bab2-4c3b-9b6d-0c59e5cc3d6a.pdf

pdf

5920823.pdf

pdf

5924658.pdf

pdf

5924943.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender