Execution of the work of re-routing of the feeder wire currently installed on the exterior of Obra Dam Bridge No. 7 through the interior of the bridge structure
Tender Overview
Project Description
Tender for Execution Of The Work Of Re-Routing Of The Feeder Wire Currently Installed On The Exterior Of Obra Dam Bridge No. 7 Through The Interior Of The Bridge Structure , - Erection Of Feeder Wire In Bridge No. 7 Of Obra Dam In Midway Of Bridge Structure By Providing Structure Feeder Arrangement As Possible As 16Mtr To Maintain All Temperature Summer & Winter In Running Off Line & Dismantling Work Could Be Done Of Existing Feeder Wire Stringing Outside The Bridge Structure
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
TodayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender