Housing Urban and Rular Development Local Bodies Closing in 18 days TDR #57878621

Tender For Reconstruction Of Athletic Track -8 (400M) , Football Ground , Valley Ball Court , Basket Ball Ground , Open Kabadi Court And Long Jump Court In Existing Chief Ministers Mini Statium Kallidaikuruchi In Thirunelvlei District

Issued by Local Bodies · Tirunelveli, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Oct 2026
18 days left
EMD
21000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Tirunelveli → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Reconstruction Of Athletic Track -8 (400M) , Football Ground , Valley Ball Court , Basket Ball Ground , Open Kabadi Court And Long Jump Court In Existing Chief Ministers Mini Statium Kallidaikuruchi In Thirunelvlei District

BOQ

Name of Work:- ReConstruction Of Athletic Track -8 (400M) , Football Ground , Valley Ball Court , Basket Ball Ground , Open Kabadi Court and Long Jump Court in Existing Chief Ministers Mini Statium kallidaikuruchi in Thirunelvlei District
Sl. No. Item Description
11) ATHLETIC TRACK 400M
2Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
3Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete By power roller including hire charges
4Supplying and erecting centering for Kerb Wall
5Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the
6Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
72 ) FOOTBALL GROUND
8Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
9Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification. By power roller including hire charges
103 ) VOLLEY BALL COURT
11Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
12Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification.By power roller including hire charges
13Providing and Laying good quality grity gravel filling, including cost & conveyance of red earth from approved sources to work site including labour for spreading, watering and compacting to achieve the required Proctor density at 100% compaction.
14Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
15Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
16Supplying and erecting centering for Kerb Wall HW-W0143
17Supplying and MS pipe 63.5mm*63.5mm*3.5mm hollow section pipe
18Supply and Delivery of Chain Link - 2\\" x 2\\" using 10 Gauge Galvanised IronWire (of all sizes) including cost and conveyance all labour charges etc complete.
194) BASKET BALL
20Earth work excavation for foundation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2 mts. and clearing and levelling the site, etc., complete complying with standard specification.
21Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification.
22Brick work in Cement Mortar 1:5 ( One cement, Five sand) using COUNTRY bricks for foundation and basement including curing, etc., complete complying with standard specifiction.
23Providing vacuum de watered controlled cement concrete surfacing 100mm thick in required slope and chamber conforming ready mixed or site batched design mix cement concrete for M25 grade with 20mm size stone aggregate cast insitu, smooth finish and levelling with double framed screed vibrator, excess water to be removed through vacuum pump with bottom and top filter mat duly sealing the edges all- round including provisions of polythene sheet below the concrete layer before placing of concrete and finishing with power floated and power trowler to obtain the hard surface including provision of expansion joints at 6mtr. intervals across the platform by cutting 6mm wide and full depth of concrete by contractors own mechanical means and filling the gap with polysulphide sealant and adding admixture recon 3S for crack free construction at the rate of 125 gms pack per 50 kg of cement with all lead, lift and other incidental works etc., complete and as directed by the Engineer i/c (All labour, materials,tools and plants etc., including cement by the contractor only)
24Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
25Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
26Supplying and MS pipe 63.5mm*63.5mm*3.5mm hollow section pipe
275 )LONG JUMP
28Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
29Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification.
30Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete complying with standard specification.
31Brick work in Cement Mortar 1:5 ( One cement, Five sand) using best COUNTRY bricks for foundation and basement including curing, etc., complete complying with standard specifiction.
32In Foundation & Basement Level.
33Supplying and filling in foundation, basement, etc with filling sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers.
34Plastering with Cement Mortar 1:5 (One cement and Five sand), 12mm thick in all floors including curing etc. complete complying with standard specification and as directed by the departmental officers.
35Providing and Laying good quality grity gravel filling, including cost & conveyance of red earth from approved sources to work site including labour for spreading, watering and compacting to achieve the required Proctor density at 100% compaction.
36Supplying and erecting centering for Kerb Wall HW-W0143
37Plain Cement Concrete 1:2:4 (one cement, two sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.
386 ) OPEN KABADI COURT
39Earth work open excavation in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification.
40Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15 cm thick well rammed, watered and consolidated etc. complete complying with standard specification.By power roller including hire charges
41Providing and Laying good quality grity gravel filling, including cost & conveyance of red earth from approved sources to work site including labour for spreading, watering and compacting to achieve the required Proctor density at 100% compaction.
42GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column \\"BB\\" for all works in this package} Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57878621
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 28-10-2026
Authority
Authority Name Rural Development And Panchayats Department
Work Description Tender for Reconstruction Of Athletic Track -8 (400M) , Football Ground , Valley Ball Court , Basket Ball Ground , Open Kabadi Court And Long Jump Court In Existing Chief Ministers Mini Statium Kallidaikuruchi In Thirunelvlei District
Basic Detail
Tender No A2/467/2026
Bidding Type Tender
Location
City Tirunelveli
State Tamil Nadu
Key Dates
Publish Date 06 Oct 2026
Submission Date 28 Oct 2026
Open Date 29 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 21000
Exemption Not Available
Document List
4461d95a-afdf-4bc6-ae00-339a00478891.html
BOQ_854156.xls
pricebid.pdf
Techenicalbid.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 06, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Oct 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 19 days

Tender Documents

Download All (ZIP) ↓
html

4461d95a-afdf-4bc6-ae00-339a00478891.html

xls

BOQ_854156.xls

pdf

pricebid.pdf

pdf

Techenicalbid.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders