Rural Development Local Bodies Closing in 2 days TDR #57877870

Tender For Operation & Maintenance Of 11 Nos Portable Stationary Compactors & 4 Nos. Hook Loader For Five Years

Issued by Local Bodies · Howrah, West Bengal
Tender Value
Ref. Documents
Estimated cost
Bid Submission
20 Oct 2026
2 days left
EMD
30 Lakhs
Bank guarantee accepted
Document Fee
5500
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Howrah → West Bengal
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Operation & Maintenance Of 11 Nos Portable Stationary Compactors & 4 Nos. Hook Loader For Five Years

BOQ

Name of Work:- Operation & maintenance of 11 nos Portable Stationary Compactors & 4 nos. Hook Loader for five years
Sl. No. Item Description
1Daily wages of Station Staff for 1st year
2Daily wages of Guards for 1st year
3Daily wages of Mechanics for 1st year
4Daily wages of Electric Mechanics for 1st year
5Daily wages of Hook Loader Helpers for 1st year
6Daily wages of Hook Loader Drivers for 1st year
7Monthly routine and preventive maintenance of the Portable Stationary Compactor for 1st year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational.
8Hook Loader monthly Routine and Preventive maintenance cost of all components for 1st year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools.
9Insurance, PUC, Fitness & Statutory Compliance of all machinery for 1st year
10Sweeping & Cleaning of Compactor Stations for 1st year
11Shutter Maintenance/Overhauling of Compactor Stations for 1st year
12Water Pump Maintenance for 1st year
13Compactor Breakdown Repair for 1st year
14Hook Loader Breakdown Repair for 1st year
15Repair and Replacement of damaged components of all machineries and equipments, excluding damages or repairs covered under insurance or the manufacturer’s warranty and other miscellaneous costs for 1st year – LS
16Daily wages of Station Staff for 2nd year
17Daily wages of Guards for 2nd year
18Daily wages of Mechanics for 2nd year
19Daily wages of Electric Mechanics for 2nd year
20Daily wages of Hook Loader Helpers for 2nd year
21Daily wages of Hook Loader Drivers for 2nd year
22Monthly routine and preventive maintenance of the Portable Stationary Compactor for 2nd year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational.
23Hook Loader monthly Routine and Preventive maintenance cost of all components for 2nd year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools.
24Insurance, PUC, Fitness & Statutory Compliance of all machinery for 2nd year
25Sweeping & Cleaning of Compactor Stations for 2nd year
26Shutter Maintenance/Overhauling of Compactor Stations for 2nd year
27Water Pump Maintenance for 2nd year
28Compactor Breakdown Repair for 2nd year
29Hook Loader Breakdown Repair for 2nd year
30Repair and Replacement of damaged components of all machineries and equipments, excluding damages or repairs covered under insurance or the manufacturer’s warranty and other miscellaneous costs for 2nd year – LS
31Daily wages of Station Staff for 3rd year
32Daily wages of Guards for 3rd year
33Daily wages of Mechanics for 3rd year
34Daily wages of Electric Mechanics for 3rd year
35Daily wages of Hook Loader Helpers for 3rd year
36Daily wages of Hook Loader Drivers for 3rd year
37Monthly routine and preventive maintenance of the Portable Stationary Compactor for 3rd year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational.
38Hook Loader monthly Routine and Preventive maintenance cost of all components for 3rd year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools.
39Insurance, PUC, Fitness & Statutory Compliance of all machinery for 3rd year
40Sweeping & Cleaning of Compactor Stations for 3rd year
41Shutter Maintenance/Overhauling of Compactor Stations for 3rd year
42Water Pump Maintenance for 3rd year
43Compactor Breakdown Repair for 3rd year
44Hook Loader Breakdown Repair for 3rd year
45Repair and Replacement of damaged components of all machineries and equipments, excluding damages or repairs covered under insurance or the manufacturer’s warranty and other miscellaneous costs for 3rd year– LS
46Daily wages of Station Staff for 4th year
47Daily wages of Guards for 4th year
48Daily wages of Mechanics for 4th year
49Daily wages of Electric Mechanics for 4th year
50Daily wages of Hook Loader Helpers for 4th year
51Daily wages of Hook Loader Drivers for 4th year
52Monthly routine and preventive maintenance of the Portable Stationary Compactor for 4th year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational.
53Hook Loader monthly Routine and Preventive maintenance cost of all components for 4th year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools.
54Insurance, PUC, Fitness & Statutory Compliance of all machinery for 4th year
55Sweeping & Cleaning of Compactor Stations for 4th year
56Shutter Maintenance/Overhauling of Compactor Stations for 4th year
57Water Pump Maintenance for 4th year
58Compactor Breakdown Repair for 4th year
59Hook Loader Breakdown Repair for 4th year
60Repair and Replacement of damaged components of all machineries and equipments, excluding damages or repairs covered under insurance or the manufacturer’s warranty and other miscellaneous costs for 4th year– LS
61Daily wages of Station Staff for 5th year
62Daily wages of Guards for 5th year
63Daily wages of Mechanics for 5th year
64Daily wages of Electric Mechanics for 5th year
65Daily wages of Hook Loader Helpers for 5th year
66Daily wages of Hook Loader Drivers for 5th year
67Monthly routine and preventive maintenance of the Portable Stationary Compactor for 5th year,which shall include complete inspection, servicing and repair of the compactor body, frame, hopper, doors, hinges, locking system and structural components. Maintenance shall cover the complete hydraulic system, including pump, motor, cylinders, valves, hoses, fittings, seals and hydraulic oil. All mechanical and compaction components, including ram/platen, bearings, bushes, pins, rollers and moving parts, shall be inspected, lubricated and serviced. The electrical, control and safety systems, including control panel, sensors, switches, limit switches, wiring and emergency stop, shall be checked and tested. The scope shall include all necessary spare parts, lubricants, grease, consumables, welding, fabrication and minor repair works. All required labour, tools, tackles, cleaning, testing, transportation and associated costs shall be included to ensure the compactor remains safe, reliable and operational.
68Hook Loader monthly Routine and Preventive maintenance cost of all components for 5th year,which include cost of all frequently used spare parts, overall spare parts in servicing, all types of lubricant consumable and all necessary welding and fabrication works relating to the all components of body, engine, axle and chassis, including labour charges and all associated costs, including washing ,painting and supply of tools.
69Insurance, PUC, Fitness & Statutory Compliance of all machinery for 5th year
70Sweeping & Cleaning of Compactor Stations for 5th year
71Shutter Maintenance/Overhauling of Compactor Stations for 5th year
72Water Pump Maintenance for 5th year
73Compactor Breakdown Repair for 5th year
74Hook Loader Breakdown Repair for 5th year
75Repair and Replacement of damaged components of all machineries and equipments, excluding damages or repairs covered under insurance or the manufacturer’s warranty and other miscellaneous costs for 5th year– LS GRAND TOTAL Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57877870
AUTHORITY Local Bodies
TENDER VALUE Ref. Documents
LAST DATE 20-10-2026
Authority
Authority Name Urban Local Bodies
Work Description Tender for Operation & Maintenance Of 11 Nos Portable Stationary Compactors & 4 Nos. Hook Loader For Five Years
Basic Detail
Tender No 48/Cons/26-27
Bidding Type Tender
Location
City Howrah
State West Bengal
Key Dates
Publish Date 05 Oct 2026
Submission Date 20 Oct 2026
Open Date 23 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee 5500
EMD 30 Lakhs
Exemption Not Available
Document List
11compctor.pdf
5accd812-d89e-4780-8446-8d69d52bf2ff.html
BOQ_2561486.xls
TENDERBOOK.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 05, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Oct 20, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Oct 23, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 5 days

Tender Documents

Download All (ZIP) ↓
pdf

11compctor.pdf

html

5accd812-d89e-4780-8446-8d69d52bf2ff.html

xls

BOQ_2561486.xls

pdf

TENDERBOOK.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender