Power Boards / Undertakings / PSU Closing in 4 days TDR #57876886

Tender For Construction Of 8 Km 110Kv Double Circuit Lilo Line From 110Kv Kizhissery Malappuram Feeder (1Kiml-1) To The Proposed 110Kv Substation Vengara. - Labour Part.

Issued by Boards / Undertakings / PSU · Malappuram, Kerala
Tender Value
6.14 Crore
Estimated cost
Bid Submission
05 Nov 2026
4 days left
EMD
2 Lakhs
Bank guarantee accepted
Document Fee
11800
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Malappuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Of 8 Km 110Kv Double Circuit Lilo Line From 110Kv Kizhissery Malappuram Feeder (1Kiml-1) To The Proposed 110Kv Substation Vengara. - Labour Part.

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 26-Oct-2026 Date Extension Date 05-Nov-2026

BOQ

Name of Work:- Construction of 8 km 110kV Double Circuit LILO line from 110kV Kizhissery Malappuram feeder (1KIML-1) to the proposed 110kV Substation Vengara. - Labour Part.
Sl. No. Item Description
1Conducting Check Survey,setting out tower positions on ground, pit marking, all confirming to the approved profile and tower schedule using Digital Theodolites/Total Station etc.as directedby Board staff
2Clearing jungle including uprooting of rank vegetation, grass, brushwood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
3Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared.
4Formation of temporary access road of 3 m width, wherever required, for transportation of materials to tower foundation, tower erection, and line stringing sites
5Providing weep holes using 75mm dia. PVC pipesworking pressure 4kg /sq.cm including cost of materials, conveyance, labour chargesetc. complete.
6Earth work in excavation by mechanical means (Hydraulicexcavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal ofexcavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
7Random rubble masonry with hard stone in foundation and plinthincluding levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up toplinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
8Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 finesand):Flush/ Ruled pointing
9Filling available excavated earth (excludingrock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.Filling available excavated earth(excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer byramming and watering, lead up to 50 m and lift up to 1.5 m.
10Filling with contractor own earth (excluding rock) in open areas in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5m as per direction of site Engineer-incharge
11Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
12Centering and shuttering including strutting, etc. and removal of formfor: Foundations, footings, bases of columns, etc for mass concrete
13Earth work in excavation by mechanical means (Hydraulic excavator)/manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
14Excavation work by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil anddisposal of surplus excavated soils as directed, within a lead of 50 m.Ordinary rock
15Extra for every additional lift 1.5 m or part there of in excavation /banking excavated or stacked materials.All kinds of soil
16Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatlydressed.Ordinary rock
17Extra for every additional lift 1.5 m or part there of in excavation /banking excavated or stacked materials.Ordinary or hard rock
18Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth,lead up to 50 m and lift up to 1.5 m, disposed earth to belevelled and neatly dressed.Hard rock (requiring blasting)
19Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatlydressed.Hard rock (blasting prohibited
20Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
21Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement :3 coarse sand : 6 graded stone aggregate 20 mmnominal size)
22Centering and shuttering including strutting, propping etc. and removal of form work for:Foundations, footings, bases for columns
23Stub setting (using template/probe) for 110 kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curing of Cement concrete,movement of template from one location to another complete, as directed by Board staff. - general area (For110 kV DC Tower)
24Steel reinforcement for R.C.C work including straightening, cutting,bending, placing in position and binding all complete upto plinth level Thermo- Mechanically Treated bars of grade Fe-500D or more
25Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using cement content as per approved design mix, manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering finishing and reinforcement including cost of admixtures in recommended proportions as per IS: 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in -charge.Note:- Cement content considered in this item is @330 kg/cum. Excess /less cement used as per design mix is payable/recoverable separately.All work upto plinth level.
26Add for using extra cement in the items of design mix over and above the specified cement content therein.
2715 mm cement plaster on the rough side of single or half brick wall of mix:1:4 (1 cement :4 fine sand)
28Supplying and providing MS dowel bars of size 20 mm dia,1.5m long (1m in rock and 0.5 m in concrete ) including drilling holes of 25mm dia and filling the gap with cement grout ( 0.25kg/each) etc complete
29Stub setting (using template/probe) for 110 kV towers. Erection of stub, stub template, fixing of jack for supporting template, allignment and leveling for exact location of stubs of stub setting template, dismantling of template after completion of initial curingof Cement concrete, movement of template from one location to another complete, as directed by Board staff. - general area (For 220 kV DC Towers (Genral) Wt of 220 kV/ Wtof 110 kV DC(.817/.533)xa1)
30Driving down coconut pile to lines and levels through variuos strata including all hire charges and labour for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end.
31Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered):Depth exceeding 1.5 m but not exceeding 3 m
32Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered):Depthexceeding 3 m but not exceeding 4.5 m.
33Dewatering Manual
34Bailing out water Using 5HP Pump- Bailing out water with 5HP engine and pump set including conveyance to site and erection,cost of fuel, lubrication oil and otherstores, pay of staff etc complete.
35Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):Depth notexceeding 1.5 m
36Close timbering over areas including strutting, shoring and packing cavities (wherever required) etc. complete ( Measurements to be taken of the face area timbered):Depth exceeding 1.5 m but exceeding 3 m.
37Close timbering over areas including strutting, shoring and packing cavities(wherever required) etc. complete ( Measurements to be taken of the face areatimbered):Depth exceeding 3 m but not exceeding 4.5 m
38Open timbering in case of shafts, wells, cesspits, manholes and the like including strutting and shoring complete (Measurements to be taken of the face area timbered):Depthnot exceeding 1.5 m
39Coconut Pile -Supplying and stacking well matured straight coconut post for driving down through various strata bellow bed level including cost coveyance labour charges etccomplete
40Filling with Quarry Muck. Filling up low lying and water logged areas with localmaterial/ quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of sub grade
41Cutting of steel angles
42Erection of tower super structure above ground level including erection of normaland special hill side extension members wherever necessary, providing toweraccessories like phase, danger and number plates, bird guards, anti climbing devices, including tighting ,punching and tack welding upto bottom cross arm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (For 110 kV DC Tower - Average height is 22 mtrs) general area
43Drilling of holes
44Filing of holes
45Erection of tower super structure above ground level including erection of normaland special hill side extension members wherever necessary, providing tower accessories like phase, danger and number plates, bird guards, anti climbing devices, including tighting,punching and tack welding upto bottom cross arm in the bolt and nut after punching and applying zink rich primer wherever necessary etc. complete, as directed by Board staff (220 kV DC Tower ((a1) x 1.51) Average height 33.2m s) general area
46Paving out, stringing and tensioning OF POWER CONDUCTORS including attaching insulator strings with arcing horns or rings on to the tower cross arms, clamping the conductor tothe insulator strings using suspension clamps with armour rods and tensionclamps, jumpering the conductors at tension points, jointing the conductors and pilot wire wherever necessary, installation of vibration dampers hire charges of tractor and stringing tools, etc. Complete. ( 6 Line wolf Double circuit ( Rate for 6 panther x.7274 Kg/M /0.976 Kg/M)
47Re-Tensioning one span 11kV line including replacing pin insulators, pin binding, jumpering, replacing insulators cross arms disc, tightening stay, cutting treebranches etc. wherever necessary, including conveyance of all materials complete.
48Disconnecting and lowering down the three phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
49Re-joining one snapped LT conductor after removing damaged portion including Reshackling and conveyance of all materials complete.
50Re-joining one snapped HT conductor after removing damaged portion including retensioning and conveyance of all materials complete.
51Rewinding of \\"WOLF A C S R\\" from dilapidated conductor drums unsuitable for transporting/paving out on to serviceable conductor drums issued departmentally including all hire charges for tools & plants necessary for rewinding.
52Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material anddisposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth
53Providing special type trussels For NH/SH road crossing, railway crossings
54Fitting one Additional 75x40mm, 1.8m Channel cross arm in existing single pole including conveyance of materials.
55Dismanling 3 Line wolf from the tower detaching the clamps,connectors and line accessories from the conductor,winding and stacking the same at site.Take 50% of thestringing rate vide item no 65
56Dismanling 6 Line wolf Double circuit from the tower detaching the clamps,connectors and line accessories from the conductor,winding and stacking the same at site. Take 50% of the stringing rate vide item no 64
57Providing derrick support and temporary stay arrangement for a tower
58Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material anddisposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth
59Dismantling of tower super structure above ground level including normal and specialhill side extension members,detaching tower accessories,Nut and bolts (where ever necessary) from the tower angles and stacking the same at site For ,110 kV DC Tower
60Fabrication of structures for erecting equipments. The GI & MS angles will be supplieddepartmentally
61Reshackling one span LT three phase 4 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc.wherever necessary including conveyance of all materials.
62Reshackling one span LT single phase 2 wire OH line including pin binding, jumpering, replacing insulators/cross arms/shackle, tightening stay, cutting tree branches etc.wherever necessary including conveyance of all materials.
63Disconnecting and lowering down the single phase WP service connection with guy wire from the OH line and reconnecting the same after completing the line work.
64Transportation of materials issued departmentally for the work from departmentalstores and distribution to locations for erection including storage if necessary, loading andunloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - Manual labour for 1km for transporting Line and Earth Conductor
65Transportation of materials issued departmentally for the work from departmentalstores and distribution to locations for erection including storage if necessary, loading andunloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - Manual labour for 1km for Insulators and accessories, power conductor accessories and earth conductor accessories etc
66Transportation of materials issued departmentally for the work from departmentalstores and distribution to locations for erection including storage if necessary, loading and unloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - By lorry over 9km and upto 10km for Line and Earth Conductor
67Transportation of materials issued departmentally for the work from departmentalstores and distribution to locations for erection - By lorry for every additional kmor part thereof above 10km, for Line and Earth Conductor
68Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading andunloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - By lorry over 9km and upto 10km for Insulators and accessories, power conductoraccessories and earth conductor accessories etc
69Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By lorry for every additional km or part there of over 10km, for Insulators and accessories, power conductor accessories and earthconductor accessories etc
70Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading andunloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - Manual labour for 1km for Tower extensions and other structures and all othermaterials including earthing materials
71Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection including storage if necessary, loading andunloading charges with lead of 50 m by head load and initial lift of 1.5m at each endetc. - By lorry over 9km and upto 10km for Tower extensions and other structures and all other materials including earthing materials
72Transportation of materials issued departmentally for the work from departmental stores and distribution to locations for erection - By lorry for every additional km or part thereof over 10km for Tower extensions and other structures and all other materials including earthing materials
73Providing one Earth using GI earth pipe of size 38.1mm dia, 2.5m length includingdigging separate pit (0.45x0.45x2.5m) at standard distance (1.5m) away from the pole/structure in ordinary soil & backfilling the pit with 15cm alternate layer of charcoal, salt and sand up to 90cm from the bottom. including the cost of 20kg salt, 25kg charcoal,excluding supply of earth pipe.
74Additional rate for excavation of one Earth Pit (2.5m depth) in Soft Rock.
75Additional rate for excavation of one Earth Pit (2.5m depth) in Hard Laterite.
76Providing earthing in terminal tower as per standard specification by providing 150mm dia bore hole for a depth of 3.6m and placing of GI pipes 50 mm dia GI \\"C\\" class 3m long intothe bore including cost of 600 mm dia RCC collar placing over the earth pipe and connecting the earth pipe and tower leg using 7/3.66 mm GI earth wire with lugs connecting to the pipe and fixing necessary GI clamp etc., including drilling of bore cost of all lead and liftsetc., complete.
77Dismantling of existing 7/10 or 7/3.15mm Earth conductor from the tower detaching theclamps,connectors and line accessories from the conductor,winding and stacking the same at site
78Paving out, stringing and tensioning as per standard of one 7/10 OR 7/3.15strandedsteel earth wire including fixing the conductors on to the tower top using tensionclamps and suspension clamps, jumpering the conductors at tension points, jointing the conductor wherever necessary, erection of earth bonds, hire charges of tractor and stringing tools, etc. Complete. ((.46/.59)* rate for 7/3.66)
79Supply of PLB HDPE Pipe Suitable for 24 /48 Fibre OFC, Including All Accessories for UG OFC.Supply of Permanently Lubricated (PLB) HDPE pipe suitable for laying ofunderground Optical Fibre Cable (OFC), conforming to relevant IS/TEC specifications.
80Installation, testing, and commissioning of 48 Fibre Optical Distribution Panel (FODP), including proper dressing and termination of underground optical fiber cable, ensuring secure connections, labeling, and satisfactory performance through necessary testing andcommissioning procedures.
81Paving out, stringing and tensioning as per standard one OPGW including fixing the conductors on to the tower tops using tension clamps and suspension clamps , jumpering the conductor at tension points , jointing of conductor whereever necessary, erection ofearth bonds, hire charges d for pulling machines, tractors and stringing tools, all hireand labour for protective trestles and providing suitable back strings at the time of stringing etc complete.
82Supply of FODP -48 Fibre Indoor Type- with FC-PC Coupling and Pigtails. (5 meter each)
83Driving down the ground electrode into the already taken earth pit, after filling the bore hole with bentonite
84Drilling bore holes of sizes 150mm or nearest in all classes of soil including hire charges of plant and machinery, cost of oil, fuel, tool etc. and taking all necessary precautions forsafety to the substation equipments etc. as per the direction of departmental officers at site.
85Welding one end of the GI strip 50x6mm with the structure with a welding length of 50mm & 6mm thickness on both sides & end of the strip and connecting other end with bolts & nuts if required including hire charges of DC arc welding set, current charges, cost of low hydrogen DC arc welding electrodes (No.E7018) cost of anti corrosive paint etc. complete.
86Providing counter poise type earthing wherever necessary for tower location includingextra excavation in foundation pits of towers for fixing wih G.I wire on both terminals for connection the GI pipe with tower leg fefilling with excavated earth mixed with salt and charcoal as per standard specification including cost of S fabrication of legs for connection arrangement all other materials, transport all labour leads and lifts, etc., complete.
87Supplying of Bolt & Nut GI M 16 x 45 (13/4\\"x 5/8\\")
88Supplying of Barbed Wire GI 12 SWG
89Supplying of Earth Chamber (PVC) WithRCC Covering Slab
90Supplying of Bolt& Nut GI M 12 x 180(7\\"x1/2\\")
91Supply of OPGW Joint Box (SpliceBox) -48 Fiber
92Supply of 48F OPGW Cable
93Supply of S/S CLAMP FOR OPGW
94Supply of S/T CLAMP FOR OPGWfor joint box location
95Supply of S/T CLAMP FOR OPGWfor pass through location
96Supply of Earth bond for OPGW
97Supply of Vibration damper withArmour Rod for OPGW
98Supply of Down Lead Clamp Assemblyfor OPGW
99Supply of Tension Assembly -DeadEnd for OPGW 750mm
100Supply of Down lead clamp for OPGW
101Supply of Bentonite
102Labour
103Supply Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57876886
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE 6.14 Crore
LAST DATE 05-11-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Construction Of 8 Km 110Kv Double Circuit Lilo Line From 110Kv Kizhissery Malappuram Feeder (1Kiml-1) To The Proposed 110Kv Substation Vengara. - Labour Part.
Basic Detail
Tender No TRCM/04/2026-27/05.10.2026
Bidding Type Tender
Location
City Malappuram
State Kerala
Key Dates
Publish Date 26 Oct 2026
Submission Date 05 Nov 2026
Open Date 07 Nov 2026
Finance
Tender Value 6.14 Crore
Tender Fee 11800
EMD 2 Lakhs
Exemption Not Available
Document List
BOQ_1488957.xls
d93f0758-e88c-4f2b-9628-51f8536f69ea.html
PQBidVengaraline.pdf
Techspech.pdf
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 26, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Nov 05, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 4 days
Nov 05, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days
Nov 07, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1488957.xls

html

d93f0758-e88c-4f2b-9628-51f8536f69ea.html

pdf

PQBidVengaraline.pdf

pdf

Techspech.pdf

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender