Tender For Construction Of Feeder Tank For 1 Mld Water Treatment Plant Near Nila Building In Technopark Phase I C Us, Trivandrum
Tender Overview
Project Description
Tender for Construction Of Feeder Tank For 1 Mld Water Treatment Plant Near Nila Building In Technopark Phase I C Us, Trivandrum
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Oct-2026 | Date extension 1 | Date | 24-Oct-2026 |
| 2 | 26-Oct-2026 | Date extension 2 | Date | 31-Oct-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural sources : 10 graded stone aggregate 40 mm nominal size derived from natural sources). The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 3 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources). The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 4 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources). The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 6 | Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level. Thermo - Mechanically Treated bars of grade Fe-500D or more. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 7 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 8 | Centering and shuttering including strutting, etc. and removal of form for: Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. The rate inclusive of all material charge, Labour, Transportation, Scaffolding (If needed) Loading/ Unloading at the work space etc. complete as per the direction of engineer in charge. |
| 9 | Providing and applying waterproofing with P.U coating over existing mother slab of sloped roof after removal of existing damaged plastered surface/ repers including removal of concrete repers (removal of plastering to be paid separately) and chipped the cracked areas and cleaned with proper materials and applying required layer of approved P.U compound over the surface as per manufatures specification and direction of engineer in charge. The rate inclusive of all material charge, labour, transportation, Scaffolding (If needed) loading/unloading at the work space and removal of debris from Technopark campus etc. complete as per the direction of engineer in charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 4 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents