Tender For Providing Temporary Lighting , Generators And Pa System Arrangments In Connection With Various Festival For The Pasali 1436 Year At Arulmigu Subramaniya Swamy Thirukoil, Tiruchendur & Sub Temple Of Subramaniya Swamy Thirukoil Tiruchendur.
Tender Overview
Project Description
Tender for Providing Temporary Lighting , Generators And Pa System Arrangments In Connection With Various Festival For The Pasali 1436 Year At Arulmigu Subramaniya Swamy Thirukoil, Tiruchendur & Sub Temple Of Subramaniya Swamy Thirukoil Tiruchendur.
BOQ
| Sl. No. | Item Description |
| 1 | Hire and Labour charges for supply, fixing and dismantling of 4'40W patty tube light/ Patty LED tube light with fitting with tube on existing supports (One trial day, one starting day & Last day dismantling) |
| 2 | Hire and Labour charges for maintaining the 4'40W patty tube light/ Patty LED tube light with fitting (Intermediate days) |
| 3 | Hire and Labour charges for supply, fixing and dismantling of 200W LED Flood Light fitting with suitable cross arm on existing support (One trial day, one starting day & last day dismantling) |
| 4 | Hire and Labour charges for maintaining the 200W LED Flood Light fitting (Intermediate days) |
| 5 | Hire and Labour charges for supply, fixing and dismantling of LED Par Can light on existing supports (One trial day, one starting day & Last day dismantling) |
| 6 | Hire and Labour charges for maintaining the LED Par Can Light (Intermediate days) |
| 7 | Hire and Labour charges for supply, fixing and dismantling of LED serial light ( 48 nos ± 3) including LED driver on existing supports (One trial day, one starting day & Last day dismantling) |
| 8 | Hire and Labour charges for maintaining the LED serial light (Intermediate days) |
| 9 | Hire and Labour charges for supply, fixing and dismantling of 15W Incandensent serial light at an inetrvel distance 10\\" ± 2\\" including LED driver on existing supports (One trial day, one starting day & Last day dismantling) |
| 10 | Hire and Labour charges for maintaining the 15W Incandescent serial light(Intermediate days) |
| 11 | Hire and Labour charges for supply, fixing, maintenance and dismantling of 6 Mtrs height GI pole as support for fixing focus light fitting (One trial day, one starting day & last day dismantling) |
| 12 | Hire and Labour charges for maintaining 6 Mtrs height GI pole(Intermediate days) |
| 13 | Hire and Labour charges for supply, fixing, and dismantling of Pedestal fan. (One trial day, one starting day & last day dismantling) |
| 14 | Hire and Labour charges for maintaining the Pedestal fan(Intermediate days) |
| 15 | Hire and Labour charges for supply, fixing, and dismantling of 48\\" AC ceiling fan including fan down rod as per site condition. (One trial day, one starting day & last day dismantling) |
| 16 | Hire and Labour charges for maintaining the 48\\" AC Ceiling fan (Intermediate days) |
| 17 | Hire and Labour charges for supply, fixing and dismantling of Aircooler with stand complete with all connections (One trial day, one starting day & last day dismantling) |
| 18 | Hire and Labour charges for maintaining the Aircooler(Intermediate days) |
| 19 | Hire and labour charges for supply, fixing and dismantling of 3 nos 5A plug board(One trial day, one starting day & last day dismantling) |
| 20 | Hire and Labour charges for maintaining the 3 nos. 5A plug board.(Intermediate days) |
| 21 | Hire and labour charges for supply, fixing and dismantling of 15A/ 5A plug board(One trial day, one starting day & last day dismantling) |
| 22 | Hire and Labour charges for maintaining the 15A/5A plug board (Intermediate days) |
| 23 | Hire and Labour charges for supply, run off and dismantling of 2X3/20 PVC copper wire (One trial day, one starting day & last day dismantling) |
| 24 | Hire and Labour charges for maintaining the 2x3/20 PVC copper wire(Intermediate days) |
| 25 | Hire and Labour charges for supply, run off and dismantling of 2X7/20 PVC copper wire (One trial day, one starting day & last day dismantling) |
| 26 | Hire and Labour charges for maintaining the 2x7/20 PVC copper wire(Intermediate days) |
| 27 | Hire and Labour charges for supply, run off and dismantling of 4 X 3/20 PVC copper wire (One trial day, one starting day & last day dismantling) |
| 28 | Hire and Labour charges for maintaining the 4x3/20 sq.mm PVC copper wire(Intermediate days) |
| 29 | Hire and Labour charges for supply, run off and dismantling of 4 X 7/20 PVC copper wires(One trial day, one starting day & last day dismantling) |
| 30 | Hire and Labour charges for maintaining the 4x7/20 sq.mm PVC copper wire(Intermediate days) |
| 31 | Hire and Labour charges for supply, run off and dismantling of 4 x 17/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 32 | Hire and Labour charges for maintaining the 4x17/16 sq.mm. copper cable(Intermediate days) |
| 33 | Hire and Labour charges for supply, run off and dismantling of 4 x 19/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 34 | Hire and Labour charges for maintaining the 4x19/16 sq.mm copper cable(Intermediate days) |
| 35 | Hire and Labour charges for supply, run off and dismantling of 3 core 2.5 sq.mmflexible copper cable complete (One trial day, one starting day & last day dismantling) |
| 36 | Hire and Labour charges for maintaining the 3 core 2.5 sq.mm flexible copper cable(Intermediate days) |
| 37 | Hire and Labour charges for supply, run off and dismantling of 4 core 2.5 sq.mmflexible copper cable complete (One trial day, one starting day & last day dismantling) (SOR H-0026) |
| 38 | Hire and Labour charges for maintaining the 4 core 2.5 sq.mm. flexible copper cable(Intermediate days) |
| 39 | Hire and Labour charges for supply, run off and dismantling of 4 core 6 sq.mm copper cable complete (One trial day, one starting day & last day dismantling) |
| 40 | Hire and Labour charges for maintaining the 4 core 6 sq.mm.flexible copper cable(Intermediate days) |
| 41 | Hire and Labour charges for supply, run off and dismantling of 4 core 10 sq.mm. flexible copper cable complete (One trial day, one starting day & last day dismantling) |
| 42 | Hire and Labour charges for maintaining the 4 core 10 sq.mm.flexible copper cable(Intermediate days) |
| 43 | Hire and Labour charges for supply, run off and dismantling of1\\"/1 1/4\\" PVC rigid pipe for laying of wires (One trial day, one starting day & last day dismantling) |
| 44 | Hire and Labour charges for maintaining 1\\"/1 1/4\\" PVC rigid pipe (Intermediate days) |
| 45 | Hire and Labour charges for supply, run off and dismantling of 3½ X 25 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling)) |
| 46 | Hire and Labour charges for maintaining the 3½ X 25 sqmm LTUG armoured cable(Intermediate days) |
| 47 | Hire and Labour charges for supply, run off and dismantling of 3½ X 35 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 48 | Hire and Labour charges for maintaining the 3½ X 35 sqmm LTUG armoured cable(Intermediate days) |
| 49 | Hire and Labour charges for supply, run off and dismantling of 3½ X 50 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 50 | Hire and Labour charges for maintaining the 3½ X 50 sqmm LTUG armoured cable(Intermediate days) |
| 51 | Hire and Labour charges for supply, run off and dismantling of 3½ X 70 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 52 | Hire and Labour charges for maintaining the 3½ X 70 sqmm LTUG armoured cable(Intermediate days) |
| 53 | Hire and Labour charges for supply, run off and dismantling of 3½ X 95 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 54 | Hire and Labour charges for maintaining the 3½ X 95 sqmm LTUG armoured cable(Intermediate days) |
| 55 | Hire and Labour charges for supply, run off and dismantling of 3½ X 120 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 56 | Hire and Labour charges for maintaining the 3½ X120 sqmm LTUG armoured cable(Intermediate days) |
| 57 | Hire and Labour charges for supply, run off and dismantling of 3½ X 180 sqmm LTUG armoured cable (One trial day, one starting day & last day dismantling) |
| 58 | Hire and Labour charges for maintaining the3½ X 180 sqmm LTUG armoured cable(Intermediate days) |
| 59 | Hire and Labour charges for supply, run off and dismantling of 50mm dia PVC pipe for laying of cable (One trial day, one starting day & last day dismantling) |
| 60 | Hire and Labour charges for maintaining the 50mm dia PVC pipe for laying of cable (Intermediate days) |
| 61 | Hire and Labour charges for supply, fixing, and dismantling of 32A TPN switch . (One trial day, one starting day & last day dismantling) |
| 62 | Hire and Labour charges for maintaining the 32A TPN switch(Intermediate days) |
| 63 | Hire and Labour charges for supply, fixing, and dismantling of 63A TPN switch . (One trial day, one starting day & last day dismantling) |
| 64 | Hire and Labour charges for maintaining the 63A TPN switch(Intermediate days) |
| 65 | Hire and Labour charges for supply, fixing, and dismantling of 100A/125A TPN switch . (One trial day, one starting day & last day dismantling) |
| 66 | Hire and Labour charges for maintaining the 100A TPN switch(Intermediate days) |
| 67 | Hire and Labour charges for supply, fixing, and dismantling of 200 TPN switch . (One trial day, one starting day & last day dismantling) |
| 68 | Hire and Labour charges for maintaining the 200A TPN switch(Intermediate days) |
| 69 | Hire and Labour charges for supply, installation and dismantling of 32A 12 way SPN Distribution board complete with 1No 40/32A isolator as incoming with 10Nos 6-32A MCB as out going with necessary connection (One trial day, one starting day & last day dismantling) |
| 70 | Hire and Labour charges for maintaining the 32A 12 Way SPN MCB Distribution board(Intermediate days) |
| 71 | Hire and Labour charges for supply, installation and dismantling of 63A 12 way Horizontal Distribution board complete with 1No 63A isolator as incoming with 12Nos 6-32A MCB as out going with necessary connection.(One trial day, one starting day & last day dismantling) |
| 72 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 73 | Hire and Labour charges for supply, installation and dismantling of 32A 2P RCCB with enclosure with necessary connection.(One trial day, one starting day & last day dismantling) |
| 74 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 75 | Hire and Labour charges for supply, installation and dismantling of 32A 4P -63A 4P RCCB with enclosure with necessary connection.(One trial day, one starting day & last day dismantling) |
| 76 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 77 | Hire and Labour charges for supply, installation and dismantling of 100A/125A 4 pole chengeover switch with necessary connection.(One trial day, one starting day & last day dismantling) |
| 78 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 79 | Hire and Labour charges for supply, installation and dismantling of 200A/250A 4 pole chengeover switch with necessary connection.(One trial day, one starting day & last day dismantling) |
| 80 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 81 | Hire and Labour charges for supply, installation and dismantling of 400A 4 pole chengeover switch with necessary connection.(One trial day, one starting day & last day dismantling) |
| 82 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 83 | Hire and Labour charges for supply, installation and dismantling of 100A Pedastal panel board complete with 1No 100A TPN switch with 5Nos 32A TPN switch with necessary connection (One trial day, one starting day & last day dismantling) |
| 84 | Hire and Labour charges for maintaining the 100A Panel board(Intermediate days) |
| 85 | Hire and Labour charges for supply, installation and dismantling of 250A Pedastal panel board complete with 1No 250A TPN switch with 7Nos 63A TPN switch with necessary connection (One trial day, one starting day & last day dismantling) |
| 86 | Hire and Labour charges for maintaining the 250A Panel board(Intermediate days) |
| 87 | Hire and Labour charges for supply, installation and dismantling of 100A/125A Panel Board incoming 100A/125A TPN Switch with various range of TP/DP/SP MCB with suitable angle ironframe work with necessary connection (One trial day, one starting day & last day dismantling) |
| 88 | Hire and Labour charges for maintaining the 100A MCB Panel board(Intermediate days) |
| 89 | Hire and Labour charges for supply, installation and dismantling of 200A/250A Panel Board incoming 200A/250A TPN Switch with various range of TP/DP/SP MCB with suitable angle ironframe work with necessary connection (One trial day, one starting day & last day dismantling) |
| 90 | Hire and Labour charges for maintaining the 200A/250A MCBPanel board (Intermediate days) |
| 91 | Hire and Labour charges for supply, installation and dismantling of 400A Panel Board incoming 400A TPN Switch with various range of TP/DP/SP MCB with suitable angle ironframe work with necessary connection (One trial day, one starting day & last day dismantling) |
| 92 | Hire and Labour charges for maintaining the 400A MCBPanel board(Intermediate days) |
| 93 | Hire and labour charges for supply, fixing operating and dismantling of 3KVA -5KVA Diesel Generator set including fuel and with operator charges and conveyance charges |
| 94 | Hire and labour charges for supply, fixing operating and dismantling of 3KVA-5 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 95 | Hire and Labour charges for maintaining the 3 KVA-5 KVA diesel Generator set (Intermediate days) |
| 96 | Hire and labour charges for supply, fixing operating and dismantling of 7.5KVA-10 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 97 | Hire and Labour charges for maintaining the 7.5 KVA-10 KVA diesel Generator set (Intermediate days) |
| 98 | Hire and labour charges for supply, fixing operating and dismantling of 12KVA-15 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 99 | Hire and Labour charges for maintaining the 12 KVA-15 KVA single Phase diesel Generator set(Intermediate days) |
| 100 | Hire and labour charges for supply, fixing operating and dismantling of 25 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 101 | Hire and Labour charges for maintaining the 25 KVA diesel Generator set (Intermediate days) |
| 102 | Hire and labour charges for supply, fixing operating and dismantling of 40 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 103 | Hire and Labour charges for maintaining the 40 KVA diesel Generator set (Intermediate days) |
| 104 | Hire and labour charges for supply, fixing operating and dismantling of 62.5KVA Diesel Generator set Excluding Diesel and with Operator charges (One trial day, one starting day & last day dismantling) |
| 105 | Hire and Labour charges for maintaining the 62.5 KVA Diesel Generator (Intermediate days) |
| 106 | Hire and labour charges for supply, fixing operating and dismantling of 125KVA Diesel generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 107 | Hire and Labour charges for maintaining the 125 KVA Diesel Generator (Intermediate days) |
| 108 | Hire and labour charges for supply, fixing operating and dismantling of 160KVA-250 KVA diesel generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 109 | Hire and Labour charges for maintaining the 160 KVA-250 KVA Diesel Generator (Intermediate days) |
| 110 | Charges for supply, filling of fuel to the Diesel Generator sets provided for all the days of use including transport , loading and unloading charges. |
| 111 | Hire and labour charges for supply, installation and dismantling of earth with GI piping earth wires and with watering etc., (One trial day, one starting day & last day dismantling) |
| 112 | Hire and Labour charges for maintaining the Earthing (Intermediate days) |
| 113 | Hire and labour charges for supply, fixing of and dismantling of public address system with necessary mic-1 No, Amplifier-1No, speaker - 2Nos etc.including wiring arrangements (One trial day, one starting day & last day dismantling) |
| 114 | Hire and Labour charges for maintaining the above PA system arrangments(Intermediate days) |
| 115 | Hire and labour charges for supply, fixing of and dismantling of public address system with necessary mic -5nos.,Amplifier-2No,Pre Amplifier -1 no, speaker - 6-Nos , Voltage stabilizer -1 no.etc., including wiring arrangements (One trial day, one starting day & last day dismantling) |
| 116 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 117 | Hire and labour charges for supply and assembling testing and dismantling of public address system for the following items 1.Stand mike-2, 2.Cordless mike-4, 3.Amplifier-4, 4. Speaker box-6 Nos , Mixer-1 no.etc., including wiring arrangments (One trial day, one starting day & last day dismantling) |
| 118 | Hire and Labour charges for maintaining the above PA system arrangments (Intermediate days) |
| 119 | Hire and labour charges for supply and assembling testing and dismantling of Horn speaker with necessary wiring (One trial day, one starting day & last day dismantling) |
| 120 | Hire and Labour charges for maintaining the above Horn speaker (Intermediate days) |
| 121 | Hire and labour charges for supply and assembling testing and dismantling of Cordless /wired mic (One trial day, one starting day & last day dismantling) |
| 122 | Hire and Labour charges for maintaining the above Horn speaker (Intermediate days) |
| 123 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light boad name such as SANGU board/ CHAKKARAM board/ NAMAM Boad/ SWASTIK board / STAR Board of size 2'x2' on existing supports (One trial day, one starting day & Last day dismantling) |
| 124 | Hire and Labour charges for maintaining the above LED light Board(Intermediate days) |
| 125 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light board name of minimum 180 lights such as Vinayakar/Amman/ Sivan of size 4'x3' on existing supports (One trial day, one starting day & Last day dismantling) |
| 126 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 127 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light design board of size 6'x6' on existing supports (One trial day, one starting day & Last day dismantling) |
| 128 | Hire and Labour charges for maintaining the above Ready made Design Board(Intermediate days) |
| 129 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light board name of minimum 600 lights such as Elephant picture of size 4'x4' on existing supports (One trial day, one starting day & Last day dismantling) |
| 130 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 131 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light Kuthuvizhaku board of minimum 100 lights of size 2'x4' on existing supports (One trial day, one starting day & Last day dismantling) |
| 132 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 133 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light Murugan Picture board of minimum 1200 lights of height 10 feet on existing supports (One trial day, one starting day & Last day dismantling) |
| 134 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 135 | Hire and Labour charges for supply, fixing and dismantling of ready made 50 nos. of 25 watts LED on cloth roll on existing supports (One trial day, one starting day & Last day dismantling) |
| 136 | Hire and Labour charges for maintaining the above readymade LED serial set(Intermediate days) |
| 137 | Hire and Labour charges for supply, fixing and dismantling of Ready made LED light board name of Tamil new year / chitrai one (Tamil fond) of size 15'x6' on existing supports (One trial day, one starting day & Last day dismantling) |
| 138 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 139 | Hire and Labour charges for supply, fixing and dismantling of mini LED light decoration on Silver Car as directed by the officer incluiding suitable capacity Disel Generator set with fuel and transporation charges (One trial day, one starting day & Last day dismantling) |
| 140 | Hire and Labour charges for maintaining the above readymade LED light board (Intermediate days) |
| 141 | Hire and Labour charges for supply, fixing and dismantling of 2 nos. 200W LED flood light with 3 KVA Diesel Generator set with fuel on tricycle for Sapparm decoration (One trial day, one starting day & Last day dismantling) |
| 142 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 143 | Hire and Labour charges for supply, fixing and dismantling of 5 nos. 200W LED flood light with 5 KVA Diesel Generator set with fuel on Mini Tata ACE vehicle for Sapparm decoration for Avani Thiruvizha and Maasi Thiruvizha festival |
| 144 | Charges for safety certificate for Temporary Electrical installion arragements for Kandha Sasti festivel at Arulmigu Subramiya Swamy Tirukovil Tiruchendur |
| 145 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 14 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender