Tender For Providing Temporary Security Lighting Arrangements, Generator Sets And Public Address System In Car Parking Of Various Places On 14.11.2026 &15.11.26 In Connection With Kanda Sasti Festival Of Arulmigu Subramaniya Swamy Thirukoil, Tiruchen
Tender Overview
Project Description
Tender for Providing Temporary Security Lighting Arrangements, Generator Sets And Public Address System In Car Parking Of Various Places On 14.11.2026 &15.11.26 In Connection With Kanda Sasti Festival Of Arulmigu Subramaniya Swamy Thirukoil, Tiruchendur [Trial Day On 13.11.26, Function Day On 14.11.26&15.11.26 And Dismantling Day On 16.11.26]
BOQ
| Sl. No. | Item Description |
| 1 | Hire and Labour charges for supply, fixing and dismantling of 4'40W patty tube light/ Patty LED tube light with fitting with tube on existing supports (One trial day, one starting day & Last day dismantling) |
| 2 | Hire and Labour charges for maintaining the 4'40W patty tube light/ Patty LED tube light with fitting (Intermediate days) |
| 3 | Hire and Labour charges for supply, fixing and dismantling of 200W LED Flood Light fitting with suitable cross arm on existing support (One trial day, one starting day & last day dismantling) |
| 4 | Hire and Labour charges for maintaining the 200W LED Flood Light fitting (Intermediate days) |
| 5 | Hire and Labour charges for supply, fixing, maintenance and dismantling of 6 Mtrs height GI pole as support for fixing focus light fitting (One trial day, one starting day & last day dismantling) |
| 6 | Hire and Labour charges for maintaining 6 Mtrs height GI pole(Intermediate days) |
| 7 | Hire and labour charges for supply, fixing and dismantling of 3 nos 5A plug board(One trial day, one starting day & last day dismantling) |
| 8 | Hire and Labour charges for maintaining the 3 nos. 5A plug board.(Intermediate days) |
| 9 | Hire and Labour charges for supply, run off and dismantling of 2X3/20 PVC copper wire (One trial day, one starting day & last day dismantling) |
| 10 | Hire and Labour charges for maintaining the 2x3/20 PVC copper wire(Intermediate days) |
| 11 | Hire and Labour charges for supply, run off and dismantling of 2X7/20 PVC copper wire (One trial day, one starting day & last day dismantling) |
| 12 | Hire and Labour charges for maintaining the 2x7/20 PVC copper wire(Intermediate days) |
| 13 | Hire and Labour charges for supply, run off and dismantling of 4 X 7/20 PVC copper wires(One trial day, one starting day & last day dismantling) |
| 14 | Hire and Labour charges for maintaining the 4x7/20 sq.mm PVC copper wire(Intermediate days) |
| 15 | Hire and Labour charges for supply, run off and dismantling of 4 x 17/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 16 | Hire and Labour charges for maintaining the 4x17/16 sq.mm. copper cable(Intermediate days) |
| 17 | Hire and Labour charges for supply, run off and dismantling of 4 x 19/16 sqmm copper cable complete (One trial day, one starting day & last day dismantling) |
| 18 | Hire and Labour charges for maintaining the 4x19/16 sq.mm copper cable(Intermediate days) |
| 19 | Hire and Labour charges for supply, run off and dismantling of 3 core 2.5 sq.mmflexible copper cable complete (One trial day, one starting day & last day dismantling) |
| 20 | Hire and Labour charges for maintaining the 3 core 2.5 sq.mm flexible copper cable(Intermediate days) |
| 21 | Hire and Labour charges for supply, run off and dismantling of 4 core 2.5 sq.mm.flexible copper cable complete (One trial day, one starting day & last day dismantling) |
| 22 | Hire and Labour charges for maintaining the4 core 2.5 sq.mm.flexible copper cable(Intermediate days) |
| 23 | Hire and Labour charges for supply, run off and dismantling of1\\"/1 1/4\\" PVC rigid pipe for laying of wires (One trial day, one starting day & last day dismantling) |
| 24 | Hire and Labour charges for maintaining 1\\"/1 1/4\\" PVC rigid pipe (Intermediate days) |
| 25 | Hire and labour charges for supply, fixing operating and dismantling of 25 KVA/30 KVA Diesel Generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 26 | Hire and Labour charges for maintaining the 25 KVA/30 KVA diesel Generator set (Intermediate days) |
| 27 | Hire and labour charges for supply, fixing operating and dismantling of 62.5KVA Diesel Generator set Excluding Diesel and with Operator charges (One trial day, one starting day & last day dismantling) |
| 28 | Hire and Labour charges for maintaining the 62.5 KVA Diesel Generator (Intermediate days) |
| 29 | Hire and labour charges for supply, fixing operating and dismantling of 82.5KVA Diesel Generator set Excluding Diesel and with Operator charges (One trial day, one starting day & last day dismantling) |
| 30 | Hire and Labour charges for maintaining the 82.5 KVA Diesel Generator (Intermediate days) |
| 31 | Hire and labour charges for supply, fixing operating and dismantling of 125KVA Diesel generator set Excluding fuel and with operator charges (One trial day, one starting day & last day dismantling) |
| 32 | Hire and Labour charges for maintaining the 125 KVA Diesel Generator (Intermediate days) |
| 33 | Hire and Labour charges for supply, fixing, and dismantling of 63A TPN switch . (One trial day, one starting day & last day dismantling) |
| 34 | Hire and Labour charges for maintaining the 63A TPN switch(Intermediate days) |
| 35 | Hire and Labour charges for supply, installation and dismantling of 32A 12 way SPN Distribution board complete with 1No 40/32A isolator as incoming with 10Nos 6-32A MCB as out going with necessary connection (One trial day, one starting day & last day dismantling) |
| 36 | Hire and Labour charges for maintaining the 32A 12 Way SPN MCB Distribution board(Intermediate days) |
| 37 | Hire and Labour charges for supply, installation and dismantling of 63A 12 way Horizontal Distribution board complete with 1No 63A isolator as incoming with 12Nos 6-32A MCB as out going with necessary connection.(One trial day, one starting day & last day dismantling) |
| 38 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 39 | Hire and Labour charges for supply, installation and dismantling of 100A/125A 4 pole chengeover switch with necessary connection.(One trial day, one starting day & last day dismantling) |
| 40 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 41 | Hire and Labour charges for supply, installation and dismantling of 200A/250A 4 pole chengeover switch with necessary connection.(One trial day, one starting day & last day dismantling) |
| 42 | Hire and Labour charges for maintaining the above (Intermediate days) |
| 43 | Hire and Labour charges for supply, installation and dismantling of 100A/125A Panel Board incoming 100A/125A TPN Switch with various range of TP/DP/SP MCB with suitable angle ironframe work with necessary connection (One trial day, one starting day & last day dismantling) |
| 44 | Hire and Labour charges for maintaining the 100A MCB Panel board(Intermediate days) |
| 45 | Hire and Labour charges for supply, installation and dismantling of 200A/250A Panel Board incoming 200A/250A TPN Switch with various range of TP/DP/SP MCB with suitable angle ironframe work with necessary connection (One trial day, one starting day & last day dismantling) |
| 46 | Hire and Labour charges for maintaining the 200A/250A MCBPanel board (Intermediate days) |
| 47 | Hire and labour charges for supply, installation and dismantling of earth with GI piping earth wires and with watering etc., (One trial day, one starting day & last day dismantling) |
| 48 | Hire and Labour charges for maintaining the Earthing (Intermediate days) |
| 49 | Hire and labour charges for supply, fixing of and dismantling of public address system with necessary mic-1 No, Amplifier-1No, speaker - 2Nos etc.including wiring arrangements (One trial day, one starting day & last day dismantling) |
| 50 | Hire and Labour charges for maintaining the above PA system arrangments(Intermediate days) |
| 51 | GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column \\"BB\\" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender