Tender For Tubewell Drilling, Restoration & Execution Of Civil Works For Energisation At Sal Ur - Ii T.W. L.I.Project Under Sora Block In Baleshwar District.
Tender Value
17.33 Lakhs
Estimated cost
Bid Submission
16 Oct 2026
9 days left
EMD
17337
Bank guarantee accepted
Document Fee
7080
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Baleshwar → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Tubewell Drilling, Restoration & Execution Of Civil Works For Energisation At Sal Ur - Ii T.W. L.I.Project Under Sora Block In Baleshwar District.
BOQ
| Sl. No. | Item Description |
| 1 | Earthwork in excavation of foundation & plinth in hard soil including rough dressing levelling the bed and depositing the excavated soil within initial lead of 50 mtr & lift of 1.5mtr etc as per direction of E-I-C |
| 2 | Labour Charges for excavation of bore holed single under reamed Pile foundation 250mm dia of 2.5m depth |
| 3 | Filling foundation and plinth with sand excavated material including watered and rammed |
| 4 | Cement concrete (1:4:8) using 4cm HGCB metal including cost, carriage, royality & curing etc. complete |
| 5 | Cement concrete (1:2:4) using 12mm HGCB metal including cost, carriage, royality & curing etc. complete |
| 6 | FLY ASH brick masonaryin CM (1:6) in F & P including cost, carriage, royality & curing etc. complete |
| 7 | FLY ASH brick masonaryin CM (1:6) in Superstructure including cost, carriage, royality & curing etc. complete |
| 8 | 2.5 cm artificial stone flooring with Cement concrete (1:2:4) including cost, carriage, royality & curing etc. complete |
| 9 | Centering & Shuttering for RCC Work(a)Grade beam/plinth band |
| 10 | (b)Lintel |
| 11 | (c )Chhaja/Slab/Supp. Pillar |
| 12 | Supplying, fitting and placing of uncoated HYSD bar (M.S. Rod) including carriage, cutting, binding & tying the grills and placing in position including cost of binding wire 18 to 20 gauge etc. complete |
| 13 | Dry Brick khoa well watered & rammed to 10 cm receive A.S.flooring per sqm. |
| 14 | 2.5cm Damp Proof Course with c.c.(1:2:4) using 12mm size hard broken granite chips including cost, carriage, royality & curing etc. complete |
| 15 | 12mm thick cement plaster in CM (1:6) Over brick masonary including cost, carriage, royality & curing etc. complete |
| 16 | 2.5CM thick Grading concrete plastering in CC (1:2:2) using 4.7mm size HGCB chips |
| 17 | Cement punning over plastering |
| 18 | Finishing walls with water proofing cement paint of approved shade on new work (2 coats) to give an even shade including cost of cement paint labour etc complete. |
| 19 | Distempering two coats to walls with distermper of approved shade on new work to give an even shade including cost of distemper labour etc. complete. |
| 20 | Priming with red oxide primer two coats with approved primer |
| 21 | Painting two coats with approved Enamel paint over a coat of primer |
| 22 | Filling foundation and plinth with excavated materials |
| 23 | Fitting of un plasticised 160 mm dia PVC Pipe for following inside dia mtr. for all classes of pipe including jointing the pipe with solvent cement by non-heat application method including fitting fixing of required nos. of PVC Teee for outlet PVC shaddle PVC raiser, nipple for fitting of air valve, equal Tee etc. complete including conveyance of pipe from factory to work site testing of pipe line etc complete as per direction of Engineer - in-charge. |
| 24 | Installation of 7.5HP S/S Pumpset by lowering inside the T.W. & fitting with the 100mm dia G.I. pipe length 36 mtr including cutting,threading, of pipes & clamping over the support pillars by T.W. Clamp & connecting with the distribution pipe line laid in underground including fitting of bends,flanges, sockets, valves, & special joints as required with Nuts, Bolts, Rubber insertion etc. including transportation of materials, complete as per the direction of the site Engineer in charge |
| 25 | Cost,supplyinng, fixing, itting of M.S Door/ M.S window including frame in Pump Chamber including all Taxes excluding cost of GST complete as per the Engineer-incharge. |
| 26 | Labour charges for writting of required information and data on both side of the transperancy pillar including supplying of approved paints and required material for writing etc. complete as per the direction of the Engineer-incharge. |
| 27 | Earthwork in excavation in hard soil including dressing and breaking clods laying in layer not exceeding 0.30 mtr depth |
| 28 | M.S. TW Clamp for clamping 100 mm dia G.I. Pipe made out of MS Flat of size 10mm x 75mm of length 58cm of each with both side limbs of 20cm length having 2 Nos 5/8\\" dia holes in each limb at both side. |
| 29 | 100mm dia nominal bore G.I. Pipe having wall thickness 4.5mm electrical resistance welded of medium class confirming to IS - 1239 (PART-I/2004) with latest Amendments, screwed at both ends as per IS:1239 (PART-II) with latest Amendment with in random length of 4 to 7 mtrs. should bear ISI Certificationb and manufacturers name/trademark |
| 30 | 100mm dia G.I. Bend confirming to IS No. 1239(pt-II/1992) |
| 31 | 100mm dia G.I. Socket confirming to IS No. 1239(pt-II/1992) |
| 32 | 100mm dia screw boss flange confirming to IS No. 6392/1971 |
| 33 | 100mm dia C.I. Sluice valve confirming to IS-14846/2000, part-1 with ISI mark, hand wheel, G M Fitting, brass spindle s/s 410 Spindle |
| 34 | 100 mm dia N.R Valve |
| 35 | 50 mm C.I. Air release valve with shaddle & fitting materials |
| 36 | Cost, supplying of M.S Nuts and Bolts (1/2\\" to 5/8\\") including all Taxes excluding cost of GST |
| 37 | 3mm (1/8\\") thick Rubber insertion |
| 38 | 160mm dia PVC Tail piece |
| 39 | Supply of 160 mm dia unplasticised riged UPVCpipe ivory in colour having specific gravity of 1.40 to1.46 gms/cc of straight length of 6(six) meter for portable water supplies conforming to IS-4985/2000 of BIS-Amendment-2 read with Table-1 of IS-specification bearingISImarks for working pressure CI-I UPVC pipe to withstand pressure of 2.5kgf/sqcm the specification and manufacture name should be prominently marked on body of each pipe as per the latest Amendment of IS-4985. It includes the cost of sockets in case of plain ended pipe. PDI test are to be condcuted and should be marked on body of each pipe and report is to be obtained from CIPET, Bhubaneswar necessary approval of authority including transporation to work site in complete shape and handed over to Pani Panchayat Chairman of Secretary. |
| 40 | 160mm PVC End cap |
| 41 | 160mm PVC Coupler |
| 42 | Cost of 160 mm x 160mm x 110mm PVC Riser Tee with Accessories |
| 43 | 160mm x 110mm dia PVC reducing socket |
| 44 | cost of 110mm PVC FTA |
| 45 | Cost of 160 x160 x160 PVC Tee with ISI mark of reputed brand including all Taxes excluding cost of GST |
| 46 | cost of 200mm x 100mm dia TW cap |
| 47 | Cost of TW Safeguard including labour charges |
| 48 | Labour for drilling a perfectly vertical bore hole of specified dia for a specified depth below ground level in allivial soil strata by mud Rotary Rig drilling as required to suit the site condition as per the direction of Engineer in charge including use of ownRigs with its accessories,tools and plants and all consumables (like coir rope,cotton waste and bentonite powder etc. complete) etc. for lowering of finished bore suitable for lowering (minimum 400 mm dia.) of 200mm dia ASTM-PVC pipe for housing fitted with sockets and with or without well screen as per the necessity for the soft medium, hard and boulder formations.(GI/PVC casing pipes if required by the contractor to prevent collapse of over burden portion) including lower and withdrawing of casing pipes after drilling 200mm to 450mm dia in over burden portion with filling of mud-pit |
| 49 | Cost of 200mm dia PVC Casing pipe ASTM confirming to ISI (Sch 80) |
| 50 | Labour charges for cutting Transverse slot on 200 mm dia PVC ASTM pipe with slot size 1.5mm as per specification |
| 51 | Cost of 200mm dia PVC Well cap |
| 52 | Cost of 200mm dia PVC Cone |
| 53 | Cost of 200mm dia PVC Nipple |
| 54 | Supply of all Labour & T&P for lowering the 200mm dia (Sch.80) ASTM PVC Pipes as per the necessity from ground level & fitted & fixed up in perfectly verticaly position including cutting & threading of soltted pipe and fixing all jointing materials etc. complete and keeping the top of the casing pipe threaded including plugging tube wells to prevent entry of foreign materials from above excluding cost of fitting & joining materials. |
| 55 | Cleaning and developing the production well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including supply and use of all necessary equipments and labour as per the direction of Engineer-in-charge. |
| 56 | Supplying all materials, Labour T & P for packing the bore with washed gravel size (P-6) arround the well screen and pipes in good quality including cost of gravel, conveyance,royality,etc complete as per direction Engineer-in-charge. |
| 57 | Fitting of starter, mainswitch, Kitkat, Rotary switch in the panel box and fixing the panel box and the panel foundation connecting tropodure cable with main supply line and S/S cable with S/S Pumpset including transportation of materials to the work site etc.complete including Pump Chamber Wiring. |
| 58 | Making earthing with required earthing materials like Charcoal, Common salt, Conduit pipe, Soft solder, Alcape, Nuts & Bolts, Cable sockets etc. including excavation of earth pits of size (1.20m x1.20m x3.0m) for fixing of earthing pipes of size 37.5mm dia x 3.00M length with required slottings in pipe and fitting with 37.5mm dia G.I Flange including excavation of earthing trench for laying of earthing G.I Wire and filling the trench & pit after fixing of pipes on completion of earthing works including supply of all the materials, including transportation etc. complete as per the direction of the site Engineer in charge. |
| 59 | 10 HP/7.5K.W. Submersible Pump set coupled with totally enclosed Water cooled squirrel cage induction motor with delivery discharge 900 LPM at 25mtrs. Head with cable, cable clip, support clamp etc. suitable for operation at 415+6%, -15% volt, 3 phase, 50Hz, AC power supply as per the particular mentioned in \\"Annexure- \\"A\\" enclosed with ISI mark. |
| 60 | Control panel board with Auto star-delta starter of sheet steel enclosure suitable for operation of squirel cage induction motors upto 15HP with 16 Amp (AC-3) duty contractor at 415 V+ 6%- 15%, 3 phase, 50Hz, AC supply with over load relay range 8.9 to 13.5 Amp and No Volt coil suitable for operation at voltage range of 350-440V and to provide dependable protection during overload and single phasing as per particulars mentioned in Annexure-\\"B\\" with ISI mark. |
| 61 | 3 core X10mm PVC insulated (HD) armoured Electric Cable with Aluminium conductor for use in 3 phase power system of working voltage upto and including 1100 Volts at 50Hz confirming to IS 1554 (Pt-5)/1988 with ISI mark. |
| 62 | Tool Box |
| 63 | 4mm PVC insulated Copper wire ISI mark |
| 64 | 63 Amp Porceline Kit kat Fuse 415 Volt with ISI mark |
| 65 | 63 Amp 415 Volt T.P.Main Switch confirming to IS 4064 (pt-I & pt-II) with utilisation category AC-22 with ISI mark and as approved by TPNODL |
| 66 | 2.5MM dia 3 core submersible flat cable of ISI mark |
| 67 | M.S Wall base frame with steel cover plate |
| 68 | Construction of 3 phase 11 KV HT line as per REC standard confirming to IE Rules 1956 with 300 kg 9 M long PSC Pole with 80 Sqmm AAA Conductor average span 40mtr , 11 KV \\"V\\" Cross arm required No.of 11 KV T & C Disc. polymer Insulators in tension point & 11 KV Pin Polymer insulators, Couping & Padding of Poles with all G.I.Channels. Danger Board at each Pole, Anti Climbing Devices, Stay Set at Bending point & double stay at end point with 18 mm G.I.H.T.Stay, concreting of Stay with Anchor plate, guarding at Road crossings etc if required. including cost of all materials, labour transportation,inspection & commissioning etc. complete. |
| 69 | Construction of Interposing Pole with as per REC standard confirming to IE Rules 1956 with 300 kg 9 M long PSC Pole with required No.of 11 KV T & C Disc. polymer Insulators in tension point ,& 11 KV Pin Polymer insulators, Couping & Padding of Poles with all G.I.Channels. Danger, Anti Climbing Devices, including cost of all materials, labour transportation,inspection & commissioning etc. complete. |
| 70 | Construction and erection of 11 /0.4 KV , 25 KVA Double Pole mounted Substation with 5mtrx3mtrx1.5mtr height mesonary toe wall /G.I. Flat fencing boundary wall with Flat with Polymer insulator ,L.T Dist Box with MCCB , Aluminim bus bar of single bay with kitkat fuse , sand filling and metal spearding with M.S.Grill gate ,all Channel matrials should be G.I , 7 Nos earthing with chamber with 3mtr G.I pipe of 40mm dia with connecting of 25mmx 5mm G.I flat to all earthing including 25KVA BIS Leble-II Star rated Transformer confirming to RE Rules 1956, mounted on 2.44 Mtr. Long structure, supported in 300 kg 9 mtr long PSC pole,transformer hard channel & top channel made of 2.8 M long 100 X 50 X 6 mm G.I.Channel, Transformer belting on 2.80 M long 50mm X 50mm X 5 mm G.I.Angle, (all REC SPN Std.F-3) with all accessories like 3 pole 11 KV HG Fuse(F-5)& A.B.Switches(F-9) both mounted on 2.8 M long 75mm X 40mm X 6 mm G.I.Channel and supported by 1.0 M long 50 X 50 X 5 mm G.I.Angle, with 3 No. 11 KV Lightening Arrestors and Danger board at each Pole, Anti climbing Devices & all other necessary fittings i.e required size Nuts & Bolts, Brackets, Cable, Cable Sockets as per TPNODL specification etc. including cost of all materials, labour , transportation complete with liasioning for testing inspection & commissioning as per specification of TPNODL etc complete. |
| 71 | Construction of 11 KV Line 90o / 180oCut Point as per REC standard confirming to IE Rules 1956 with 300 kg 9 M long PSC Pole with required No.of 11 KV T & C Disc. polymer Insulators in tension point & 11 KV Pin Polymer insulators, Couping & Padding of Poles with all G.I.Channels. Danger Board at each Pole, Anti Climbing Devices, Stay Set at Bending point & double stay at end point with 18 mm G.I.H.T.Stay, concreting of Stay with Anchor plate, guarding at Road crossings etc if required. including cost of all materials, labour transportation,inspection & commissioning etc. complete. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 05, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 16, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysOct 22, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 15 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender