Tender For Survey, Supply, Installation Testing And Commissioning (Sitc) Of Grid Connected Solar Pv Power Plant (210 Kw ) On Rooftop / On Ground Or Suitable Location In The Premises Of Different Stages Of Akri Barjula Pumping W/S Scheme Including All
Tender Overview
Project Description
Tender for Survey, Supply, Installation Testing And Commissioning (Sitc) Of Grid Connected Solar Pv Power Plant (210 Kw ) On Rooftop / On Ground Or Suitable Location In The Premises Of Different Stages Of Akri Barjula Pumping W/S Scheme Including All Associated Electrical, Civil And Mechanical Works In District Tehri
BOQ
| Sl. No. | Item Description |
| 1 | SITC OF SOLAR POWER PLANT AT INTAKEWELL(10 kw) :- |
| 2 | Solar Monocrystalline PV module minimum 545 /550/570Wp for 10KWp to ensure the output |
| 3 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnostic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short circuit , lightening, islanding and surge voltage compatible mean in each and every sense to synchronize with UPCL grid. |
| 4 | Hot dipped Galvanized structure including SS nut bolts on the ground level of pump house (minimum 8 feet height above roof) complete with grouting by block made by cement concrete etc. including complete fencing around the ground mounted solar PV array, including GI/ HDG steel angle / MS posts, chain –link wire mesh, necessary RCC/ PCC foundation, clamps and all other required accessories, complete in all respect as per site requirement. |
| 5 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete |
| 6 | ACDB box with protective devices for overload and short circuit in between invertor and AC side |
| 7 | Copper bonded Lightening arrestor &surge protection |
| 8 | 03 Nos .Chemical earthing complete with earth wire PVC pits etc as per IE rule |
| 9 | Cabling work by copper two/four core(suitable size) AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor |
| 10 | Miscellaneous work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable, Fire safety system etc |
| 11 | SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor status, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS(Master Control System) |
| 12 | 11KV bidirectional net metering complete as per UPCL guideline |
| 13 | SITC OF 50 KW SOLAR POWER PLANT AT MPS |
| 14 | Solar Monocrystalline PV module minimum 545 /550/570Wp for 50KWp to ensure the output |
| 15 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnostic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short circuit , lightening, islanding and surge voltage compatible mean in each and every sense to synchronize with UPCL grid. |
| 16 | Hot dipped Galvanized structure including SS nut bolts on the ground level of pump house (minimum 8 feet height above roof) complete with grouting by block made by cement concrete etc. including complete fencing around the ground mounted solar PV array, including GI/ HDG steel angle / MS posts, chain –link wire mesh, necessary RCC/ PCC foundation, clamps and all other required accessories, complete in all respect as per site requirement. |
| 17 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete |
| 18 | ACDB box with protective devices for overload and short circuit in between invertor and AC side |
| 19 | Copper bonded Lightening arrestor &surge protection |
| 20 | 03 Nos .Chemical earthing complete with earth wire PVC pits etc as per IE rule |
| 21 | Cabling work by copper two/four core(suitable size) AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor |
| 22 | Miscellaneous work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable, Fire safety system etc |
| 23 | SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor status, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS(Master Control System) |
| 24 | 11KV bidirectional net metering complete as per UPCL guideline |
| 25 | SITC OF 50 KW SOLAR POWER PLANT AT IPS-I |
| 26 | Solar Monocrystalline PV module minimum 545 /550/570Wp for 50KWp to ensure the output |
| 27 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnostic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short circuit , lightening, islanding and surge voltage compatible mean in each and every sense to synchronize with UPCL grid. |
| 28 | Hot dipped Galvanized structure including SS nut bolts on the ground level of pump house (minimum 8 feet height above roof) complete with grouting by block made by cement concrete etc. including complete fencing around the ground mounted solar PV array, including GI/ HDG steel angle / MS posts, chain –link wire mesh, necessary RCC/ PCC foundation, clamps and all other required accessories, complete in all respect as per site requirement. |
| 29 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete |
| 30 | ACDB box with protective devices for overload and short circuit in between invertor and AC side |
| 31 | Copper bonded Lightening arrestor &surge protection |
| 32 | 03 Nos .Chemical earthing complete with earth wire PVC pits etc as per IE rule |
| 33 | Cabling work by copper two/four core(suitable size) AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor |
| 34 | Miscellaneous work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable, Fire safety system etc |
| 35 | SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor status, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS(Master Control System) |
| 36 | 11KV bidirectional net metering complete as per UPCL guideline |
| 37 | SITC OF 50 KW SOLAR POWER PLANT AT IPS-II |
| 38 | Solar Monocrystalline PV module minimum 545 /550/570Wp for 50KWp to ensure the output |
| 39 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnostic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short circuit , lightening, islanding and surge voltage compatible mean in each and every sense to synchronize with UPCL grid. |
| 40 | Hot dipped Galvanized structure including SS nut bolts on the ground level of pump house (minimum 8 feet height above roof) complete with grouting by block made by cement concrete etc. including complete fencing around the ground mounted solar PV array, including GI/ HDG steel angle / MS posts, chain –link wire mesh, necessary RCC/ PCC foundation, clamps and all other required accessories, complete in all respect as per site requirement. |
| 41 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete |
| 42 | ACDB box with protective devices for overload and short circuit in between invertor and AC side |
| 43 | Copper bonded Lightening arrestor &surge protection |
| 44 | 03 Nos .Chemical earthing complete with earth wire PVC pits etc as per IE rule |
| 45 | Cabling work by copper two/four core(suitable size) AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor |
| 46 | Miscellaneous work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable, Fire safety system etc |
| 47 | SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor status, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS(Master Control System) |
| 48 | 11KV bidirectional net metering complete as per UPCL guideline |
| 49 | SITC OF 50 KW SOLAR POWER PLANT AT IPS-III |
| 50 | Solar Monocrystalline PV module minimum 545 /550/570Wp for 50KWp to ensure the output |
| 51 | String invertor with power exporting facility to the grid having out put shall be 415 V AC, 50 H3, 3 Phase degree of protection IP-65 with self protective and self diagnostic features such as over voltage over current (both input and output) over/ under grid frequency, over temperature short circuit , lightening, islanding and surge voltage compatible mean in each and every sense to synchronize with UPCL grid. |
| 52 | Hot dipped Galvanized structure including SS nut bolts on the ground level of pump house (minimum 8 feet height above roof) complete with grouting by block made by cement concrete etc. including complete fencing around the ground mounted solar PV array, including GI/ HDG steel angle / MS posts, chain –link wire mesh, necessary RCC/ PCC foundation, clamps and all other required accessories, complete in all respect as per site requirement. |
| 53 | DCDB box between solar panels and the invertor containing DC SPD and DC MCB with fuse set complete |
| 54 | ACDB box with protective devices for overload and short circuit in between invertor and AC side |
| 55 | Copper bonded Lightening arrestor &surge protection |
| 56 | 03 Nos .Chemical earthing complete with earth wire PVC pits etc as per IE rule |
| 57 | Cabling work by copper two/four core(suitable size) AC cable and One core DC cable including HDPE conduit pipe for carrying the copper conductor |
| 58 | Miscellaneous work i.e. meter testing and commissioning of transformer with fixing of 1.1 KV power cable, Fire safety system etc |
| 59 | SITC of Data logging system (Hard ware and software) for measuring solar irradiance, temperature, AC voltage AC output current output power, energy DC input voltage DC input Current, Temperature invertor status, module temperature string voltage & current through GSM modem / wifi with storage of data along with display port MCS(Master Control System) |
| 60 | 11KV bidirectional net metering complete as per UPCL guideline Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date
Technical bids will be opened and evaluated.