Tender For Erection Of 40Mtr Ground Based Tower Including Construction Of Foundation, Painting, Earthing And Fencing At Maranchery (Rp Id 00620) Under Malappuram Ba

Issued by Government Departments · Malappuram, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
13 Oct 2026
8 days left
EMD
35107
Bank guarantee accepted
Document Fee
590
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Malappuram → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Erection Of 40Mtr Ground Based Tower Including Construction Of Foundation, Painting, Earthing And Fencing At Maranchery (Rp Id 00620) Under Malappuram Ba

BOQ

Name of Work:- Erection of 40mtr Ground Based Tower including construction of foundation, painting, earthing and fencing at MARANCHERY (RP ID 00620) under Malappuram BA
Sl. No. Item Description
1Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.
2All kinds of soil
3Ordinary rock
4Extra for every additional lift of 1.5 m or part thereof in excavation / banking excavated or stacked materials.
5All kinds of soil
6Ordinary or hard rock
7Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 metre and lift up to 1.5 metre.
8Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work up to plinth level :
91:4:8 (1 cement : 4 M sand : 8 graded stone aggregate 40mm nominal size)
10Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centring, shuttering, finishing and reinforcement - All work up to plinth level :
111:1.5:3 (1 cement:1.5 M sand:3 graded stone aggregate 20mm nominal size)
12Centring and shuttering including strutting, propping etc. and removal of form for:
13Foundation, footings, bases of columns etc. for mass concrete
14Lintels, beams, plinth beams, girders, bressummers and cantilevers.
15Columns, Pillars, Piers, Abutments, Posts and Struts
16Reinforcement for reinforced cement concrete works including straightening, cutting, bending, binding and placing in position all complete.
17Thermo Mechanically Treated Bars
18Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 M sand)
19Providing and laying factory made Precast concrete solid blocks of 200 mm thickness of grade M10 made of C&D waste from approved manufacturer in superstructure above plinth level up to floor V level (a) Cement mortar 1:6 (1 cement : 6 coarse sand)
2012 mm cement plaster of mix : (a) 1:6 (1 cement: 6 M sand)
21Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level with :
22Cement mortar 1:6 (1 cement : 6 coarse sand).
23Pointing on stone work with cement mortar 1:3 (1 cement: 3 fine sand) :
24Flush/ Ruled pointing
25Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
26In cement mortar
27Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.
28In cement mortar
29Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of
30Asbestos Cement Sheet
31Supplying new Galvanized iron bolts, nuts and washers for fastening the 40 M narrow based tower (for missing bolts, nuts etc.)
32Erection of four legged ground based ( light weight) 40 m high communication tower after segregation/sorting of the tower materials as per erection drawing.
33Re-Painting the 40 metre ground based tower, including ladder, cable tray, working platforms, etc. ,after scrapping the old paint surface by sand papering, with Luxol or equivalent high gloss synthetic enamel paint in two or more coats of required colour of deep orange and white in alternate bands to give an even shade over One coat of Etch primer and Zinc chromate yellow primer as per aviation standards for tower as directed by Engineer-in-charge.
34Providing and fixing in position structural steel work with galvanized steel sections - tees, angles, flats, channels including bolts, nuts of specified grade etc. welded in built up sections/frames etc. including cutting, making holes, hoisting, fixing in position etc. all complete.
35Providing G I strips of size 50x3 mm one end connected to the tower leg with G I bolts and nuts [with lead sheath in between] including providing and connecting the legs at the bottom of tower and the other end shall be connected to the G I plate earth/ring earth with G I bolts and nuts [with lead sheath in between] including clamping the down lead flat to walls/stems without any sharp bends using necessary clamps and screws as directed by the Engineer-in-Charge. (All joints should be covered by Shalimar or equivalent water proof tape and made air tight)
36Providing GI plate earth including excavation of pit of size 1500x1500x 3000mm depth in all kinds of soil and placing four numbers of GI plates of size 600x600x6 mm thick vertically at diagonally opposite ends in the excavated pit and inter connect the plates with 50x3 mm GI strips with 2 no.s of GI bolts and nuts of 10mm dia at each connection and placing galvanized iron pipe of 50mm dia and 3000mm length at the centre of the GI plate grid and interconnect the pipe at minimum two sides with connecting flat of the GI plates with GI flat of size 50x3mm with GI bolts and nuts and fill the pit up to a depth of 650mm with charcoal of 20mm nominal size and the remaining portion of pit shall be filled with loose soil free from stones and wet the entire soil with water and providing precast RCC rings 300mm dia 450mm height and 50mm thick with reinforcements and cover slab of 300mm dia 50mm thick for earth chamber etc. and levelling the surplus excavated earth as directed by the Engineer in Charge.
37Providing and fixing copper lightning conductor of 1500mm length, 25mm dia hollow tube of wall thickness not less than 1.6mm including tinning the bottom portion of the spike for a length not less than 150mm (lightning conductor to be fixed at the top of the tower) and connecting the copper bus bar to the lightening arrester using 2 Nos.10mm dia brass bolts and nuts all complete as directed by the Engineer-in-charge.
38Providing GI bus bar of 50 x 3 mm connected to the tinned bottom portion of lightning conductor and to the ring earth/plate earth with 2 no.s of 10 mm dia GI nuts & bolts [with lead sheath in between] at each connection. The bus bar shall be drawn through heat shrink sleeve and shall be shrunk properly. The bus bar shall be clamped to the tower/ building walls at uniform interval of 1.5 Mt.. using proper GI clamps and ceramic insulators such that the bus bar shall be well insulated from the tower building walls all complete as directed by the Engineer-in-charge. (All joints should be covered by Shalimar or equivalent water proof tape and made air tight)
39Supplying and Fixing Mild Steel Anchor Bolts of Required Diameter and Length ( Diameter Varying from 16mm to 32mm) for Tower Foundation including Making Steel Templates with Necessary Holes to suit the Diameter of the Anchor Bolts including Mechanical threading to the top 15 centimetre length of Bolts, welding with necessary MS Plates at the bottom of independent anchor bolts ,etc. complete .The Anchor Bolts and Template shall be fixed to line and Level keeping the Centre to Centre Distance in tact ,inside the Centring and shuttering of the Tower Beams Before doing concreting of Tower Foundation. (The Rate includes the cost of all Labour involved in the above process of operation inclusive Materials, Transportation and Fixing Charges and Nothing Extra shall be Paid)
40Providing ring earth by excavating trench of width 500 mm and depth 1200 mm and using GI flats of size 50x3 mm and joining this with plate earth at the corners with 2 nos. of 10 mm dia GI bolts and nuts with necessary spring, washers including 1 to 3 mm thick lead in between the joining members, refilling the trenches with excavated soil free from stones and disposal of surplus soil within 5 km lead etc. all complete as directed by the Engineer -in -charge
41Steel work for making template of tower base for future installation with MS plate and angle sections including making necessary holes providing with nuts and bolts etc. complete as per the direction of Engineer in charge.
42Disposal of debris / building rubbish etc. through mechanical transport to the Municipality/Panchayath approved dumping yards including loading, unloading and levelling the site etc. complete.
43Credit for unserviceable scrap steel reinforcement, angles, GI flats, M.S. pipes etc. recovered from the dismantling etc. complete
44Credit for the recovered usable RR stones ( assuming 60 % of total volume can be reused) Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade: Two or more coats on new work over an under coat of suitable shade with ordinary paint of approved brand and manufacture. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57859156
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 13-10-2026
Authority
Authority Name Bharat Sanchar Nigam Limited
Work Description Tender for Erection Of 40Mtr Ground Based Tower Including Construction Of Foundation, Painting, Earthing And Fencing At Maranchery (Rp Id 00620) Under Malappuram Ba
Basic Detail
Tender No 12/EE/BSNL/CLT/26-27
Bidding Type Tender
Location
City Malappuram
State Kerala
Key Dates
Publish Date 05 Oct 2026
Submission Date 13 Oct 2026
Open Date 15 Oct 2026
Finance
Tender Value Ref. Documents
Tender Fee 590
EMD 35107
Exemption Not Available
Document List
39077449-a762-40ce-bb11-3553b1bd861a.html
BOQ_341883.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Oct 05, 2026
11:30 IST

Tender Published

Tender notice published.

Today
Oct 13, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 8 days
Oct 15, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
html

39077449-a762-40ce-bb11-3553b1bd861a.html

xls

BOQ_341883.xls

pdf

Tendernotice_1.pdf