Tender For Drinking Water Supply-24X7 To Internal Zone Of Banki Nac (Phase-I)
Tender Value
2.52 Crore
Estimated cost
Bid Submission
22 Oct 2026
15 days left
EMD
2.53 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Cuttack → Odisha
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Drinking Water Supply-24X7 To Internal Zone Of Banki Nac (Phase-I)
BOQ
| Sl. No. | Item Description |
| 1 | Automation of Intake Well |
| 2 | PLC panel for Raw water pump House with two Pumps: Design, manufacture,supply, installation, testing and commissioning of indoor type PLC panel of size approx. 1000 mm X 700 mm X 1500mm (LBH), fabricated out of min. 2 mm thick CRCA sheet powder coated to Siemens gray color.The Panel shall be provided with reputed make PLC with following accessories as well as input output configuration.The PLC shall be programmed with IEC 61131 standards for control,monitoring and communication of equipments & instruments at Raw water Pumphouse.PLC shall have Ethernet port & protocal for Modbus TCP communication with following IO.DI –16 num DO – 16 num AI –8 num AO – 4 num.10 inch color TFT HMI complete with programming shall be provided to interact with PLC. The panel shall include all the accessories (not limited to following) to achieve purpose of smooth & trouble free operation of pump house.MCB 10A DP – 1 num MCB 4A DP – 4 num ,24 VDC Power Supply 10A – 1 num, Push Buttons – 7 num Selector Switch - 2 num Control Contactor – 2 num, Annunciator with 6 Windows NO to NC Type,Electronic Hooter – 1 num Control Transformer – 1 num Emergency PB – 1 num Panel Cooling Fan – 1 num,Panel Light with Door Switch – 1 num Control Indication Lamp – 5 num ,Wiring + TB etc – 1 lot Hardware – 1 lot and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 3 | Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares.PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW, Rs232 &Rs485 port, 2 RJ45 ports,Keyboard, Optical Mouse, 32 inch color TFT Monitor, Latest Windows Pro OS,Microsoft Office & Antivirus & Internet Sequrity software for 5 years license and completed as per Ingineering-In-Charge. |
| 4 | Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system for 1hour backup including cables power plug, switch etc. all Complete Works and completed as per Ingineering-In-Charge. |
| 5 | Supply, Installation and commissioning of AC 1.5 Ton 5 Star and completed as per Engineering-In-Charge. |
| 6 | Supply, Installation of Control Desk -1 no., Table - 1 no. & Chairs - 2 nos. at SCADA room and completed as per Engineering-In-Charge. |
| 7 | Supply, Installation, Testing, Intgeration & Commissioning of 43\\" LCD monitor at Conf. Room for display of total water system (Online) complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 8 | Designing, Supplying, Installing, commissioning & testing of Raddar type Ultrasonic level transmitter CE marked with following technical parameters Interfacing with PLC panel including mounting arrangement.Output-4-20 mA / HART.Power supply - 24V DC ext.Display - 4\\" LEDRange- 0-10 mtr - 20 mtr.Accuracy - +/- 0.25% of FullScale or betterEnclosure- IP 68Mounting - On PLC panel all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 9 | Supplying,Installation & testing of 4G/5G Dual Sim LTE Router with 1 X LAN, 1 X WAN, RS485 on board with one at a time usage, WI-FI (802.11 b / g / n), 1 X Cellular Antenna, 1 X WIFI Antenna, Model- SW245 (RS485) Make- SWTPL and comlpeted as per Ingineering_In-Charge. |
| 10 | Providing, installation, testing and commissioning of Diaphragm Type Pressure Gauges Dial size 150 mm glycerin filled shatterproof glass, Over range protection: 125% of maximum pressure, Material of sensor and other wetted parts: SS type 316, Housing material: Die cast aluminum with linear scale and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 11 | Pressure Transmitter for raw& pure water pumping station:Designing, Supplying, Installing, commissioning & testing of pressure transmitter CE markd with following technical parameters at Raw Water Pump House and Interfacing with PLC panel including mounting arrangement.Output 4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.1 % of full scale or betterEnclosure- IP 68 and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 12 | Designing, Supplying, Installing, commissioning & testing with Terminating & Interfacing of 2 C x 1.5 sq.mm as per IS 694 twisted shielded copper armoured conductor on wall in GI tray or in ground suitable for supplied DC Voltage and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge (Make:- Finolex/L&T/Anchor/Havells/V-Guard/Equivalent Make with approval of the Authority) |
| 13 | Supplying and erecting armoured control cable with ISI mark stranded / solid copper conductor 1.1 kV grade complete erected on wall / panel or in provided trench in an approved manner. 4c X 2.5 sq mm Copper conductor PVC insulated, armoured control cable and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge (Make:- Finolex/L&T/Anchor/Havells/V-Guard/Equivalent Make with approval of the Authority) |
| 14 | Designing, Supplying, Installing, commissioning & testing with Terminating & Interfacing of 2 pair x 1.0 sq.mm. as per IS 694 copper shieled, twisted, multistraned armoured cable on wall in GI tray or on ground and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 15 | Supplying, Fitting,fixing & Commissioning,of The body PN-16 and cover will be ASTM A536 Ductile lion can be integrated w ith PLC panel for operation with a minimum pressure in upstream 0.2 kglcm2 to a maximum pressure of 8 kglcm2. The valve seat shall be a solid, one-piece SS-316 desian and shall have a minimum five-degree taper on the se ating surf ace for a positive , drip-tight shut off. The diaphragm assembly shall contain a self-cleaning S5-303 stainless steel stem of sufficient diameter to withstand high hydraulic pressure differentials and shallbe fully guided atits both ends by a bearing in the main valve cover and an integral bearing in the valve seat, in order to be pr actically in balance along its fullift for limiting encessive friction, thus incre asing its ability| to react when performing a correction. The diaphragm shall not be usedias the seating surface and it shall be fully |supported by machined surfaces of the valve body or cover in its closed or opened position. In operating position, its inactive surface shall be completely supported for securing its maximum longevity. The control willbe achieved by, operating 2 number Solenoid Valves mounted on the main Valve. The Connecting tubing on the Main Valve willbe SS with |SS fiting from reputed companies makes. The flexible tubing on Main valves will not be allowed. of the approved make:(Make- KROHNE MARSHALLIE& HIABBISIEMENS / Equivalent make with approval of authority) to control water supply, including cost of material with alltaxes transporatation to sitelstorage with insurance. |
| 16 | 200mm dia |
| 17 | Supply & installation of full-bore type electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS |
| 18 | 250mm dia |
| 19 | Supply, installation, testing & commissioning of Chemical earthing System with Backfill compound covered with earthpit and cover including transportation to site, unloading etc. all complete as per direction of Engineer-in-charge |
| 20 | Supplying all materials,labour,t&p and fixing of PLC Compatable ATV930-VFD, HEAVY DUTY 16AMP, WITH BREAKING UNIT VFD floor mounted with Control Panel made out of 2MM C.R Powder coated sheet & alluminium Bus Barinter connected with copper wire and lugsh having 50KA-125A MCCB including spreader link and extended ROM-1 No ,RY Bindicator-1set, digital ammeter-1No digital volt meter- 1No, 4A control all complete as per specification and the direction of Engineer-in-charge. |
| 21 | upto VFD-37 KW (1W+1S) |
| 22 | Automation of WTP |
| 23 | CABLETRENCH: Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.2metres or bellow towards Supply and Laying of 40MM dia HDPE pipe along water Pipeline including backfilling the trench, job complete in all respects, including all labour and materials complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 24 | Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. as per specification. all Complete Works Screened cable unarmoured and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 25 | Supply, Installation and commissioning of CAT-6 Dlink cable and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 26 | Supply & installation of Open channel flow meter (1 no.) to be installed at WTP open channel for monitoring water flow with following technical specifications:- Level, ultrasonic, contactless Application: liquids, solids.Sensor: PVDF Protection class IP68 NEMA6P Self cleaning effect of sensor membrane and completed as per specification and directions of Site Engineer / Engineer-in-Charge. Make- Reputed make with ISI standard like Forbes Marshall/ Techtrol/Siemens/ABB |
| 27 | Supply & installation of LOH ( Loss of Head) indicator with display unit - 4 sets at filter house for auto wash of filter bed with following technical specifications:-Housing : Cast Aluminium, Powder Coated. Mounting: Wall Mounting Power Supply : 230 V AC, 50 Hz Power Consumption : 4 VA (approximately) Adjustment Range : Span : Min 10%cof Electrode Length Alarm : A relay C/O rated 6 Amps 230 V, non-inductiveload adjustable throughout range Current output : 4-20mA DC non isolated, max. load resistance 600 Ohms, corresponding to differential level Accuracy : ±4% of Electrode Length Option : 1. Local as well as Control Room Display. 2. Loss of Head (LoH) can be supplied with Rate of Flow (RoF) in a common CA Housing with IP-68 Protection and completed as per specification and directions of Site Engineer / Engineer-in-Charge. Make-Reputed make like Siemens/Sapcon. |
| 28 | PLC panel for Filter bed: Design, manufacture, supply, installation, testing and commissioning of indoor type PLC panel of size approx. 1000 mm X 700 mm X 1500mm (LBH), fabricated out of min. 2 mm thick CRCA sheet powder coated to Siemens gray color.The Panel shall be provided with reputed make PLC with following accessories as well as input output configuration.The PLC shall be programmed with IEC 61131 standards for control, monitoring and communication of equipments & instruments at Raw water Pumphouse.PLC shall have Ethernet port & protocal for Modbus TCP communication with following IO.DI –16 num DO – 16 num AI –8 num AO – 4 num. 10 inch color TFT HMI complete with programming shall be provided to interact with PLC. The panel shall include all the accessories (not limited to following) to achieve purpose of smooth & trouble free operation of pump house.MCB 10A DP – 1 num MCB 4A DP – 4 num ,24 VDC Power Supply 10A – 1 num, Push Buttons – 7 num Selector Switch - 2 num Control Contactor – 2 num, Annunciator with 6 Windows NO to NC Type,Electronic Hooter – 1 num Control Transformer – 1 num Emergency PB – 1 num Panel Cooling Fan – 1 num,Panel Light with Door Switch – 1 num Control Indication Lamp – 5 num ,Wiring + TB etc – 1 lot Hardware – 1 lot and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 29 | Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares.PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW, Rs232 &Rs485 port, 2 RJ45 ports, Keyboard, Optical Mouse, 32 inch color TFT Monitor, Latest Windows Pro OS, Microsoft Office & Antivirus & Internet Sequrity software for 5 years license and completed as per Ingineering-In-Charge. |
| 30 | Supply & installation of Pressure Transmitter :Designing, Supplying, Installing, commissioning & testing of pressure transmitter CE markd with following technical parameters at Raw Water Pump House and Interfacing with PLC panel including mounting arrangement along with snubber and needle valve, 1.0 sq.mm 2 core copper braided screen cable Wire, screw, grip & clamp for DI / MS pipe fitting.Output 4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.1 % of full scaleor betterEnclosure- IP 68 and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 31 | Supply & installation of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete all labours, T&P etc. all complete as per the direction of Engineer-in-charge. |
| 32 | Supply & installation of Wash water tank Designing, Supplying, Installing, commissioning & testing of Ultrasonic level transmitter CE marked with following technical parameters Interfacing with PLC panel including mounting arrangement.Output-4-20 mA / HART Power supply - 24V DC ext.,Display - 4\\" LED ,Range- 0-10 mtr - 20 mtr.,Accuracy - +/- 0.25% of Full Scale or better ,Enclosure- IP 68 ,Mounting - On PLC panel and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 33 | Supply & installation of Ventilation requirements & Leak absorptio system:chlorinator room conforming to the Govt. of India safety rules, provisions of National Safety Council, IS:4379-1967, other relevant IS codes of practices and Manuals Governing the storage & use of chlorine gas. The forced ventilation system shall be capable to vent even traces of leaked chlorine gas to the atmosphere. The ventilation system shall be manually controlled from external switches outside the rooms at each doorway. Any damage to personnel, property etc. due to mis-handling/ inadequacies in handling facilities shall be the total responsibility of the contractor. The tenderer shall clearly outline/specify in their offer about the facilities provided by them for storage and handling of chlorine gas and chlorinators and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 34 | Supply and delivery of Actuator control sluice valve of PN 1.6 with Body and Bonnet of Ductile Iron GGG-40/SG-400/15 or GGG-50/SG-500/7 or Equivalent as per IS1865, IS:3896-2 and Wedge fully Rubber Lined with food grade quality grade W270 grade EPDM, Replaceable Spindle Nut without gland packing with 3-O ring protection system on the Shaft and Seals of NBR. The Valves should be Vacuum tight and 100% leak proof . Fitting and fixing of sluice valves with tail pieces, nesaceery rubber packing, SS 204 nut bolt including labour, T&P, transportation to site from store and fixing the surface boxes with electric actuator resistant to high pressure and robust design, torque 7-2000 Nm, motion range 0-360°, voltage 220V AC, applicable for actuating multi-turn valves, with Case Body, Opening Mete, Inlet Wire Lock, Rubber Cover of Handle Shaft, No-Bracket Installation, Gear Box Cover, Electric Cover, Wiring Cover, Handle Shaft Cover, Output Shaft & Adapter and completed as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 35 | 100 mm |
| 36 | 150 mm |
| 37 | 300 mm |
| 38 | providing Actuator oparated Gates (200X200) for inlet and bypass location as per specification and directions of Site Engineer / Engineer-in-Charge |
| 39 | Design, Supply, Installation,commissioning, testing of Turbidity Anayser as per ISO 7027 scattering light method atA.F. and Interfacing with PLC panel. Turbidity analyser shall comprises of 3 components i.e. sensors,signal distributor and transmitter with indicator. with 2Outputs, 1 to PLC & another to Local Display with mounting arrangement.Overall Range : 0 ‐ 2000 NTUAccuracy : +/‐ 0.02 NTUSupply Voltage : 230 V ac |
| 40 | Design, Supply, Installation, Testing of pH analyser as per IUPAC( International Union for Pure & Applied Chemistry)at A.F. and Interfacing with PLC panel including mounting arrangement.Range : 0 ‐14 ,pH Accuracy : Better than 0.1%of full scale ,Supply Voltage : 24V dc,Output : 4‐20 mA /HARTAs per IEC 61000-6-2 & IEC 61000-6-3 |
| 41 | Supply, installation, testing & commissioning of online Chlorine Analyser with following technical specification. i.e.Single Channel free Chlorine Analyser, FRC sensor with 10 feet cable (with manual PH compensetion), Complete system pre mounted on plate with FTC sensors, Power supply110-240VAC, Transmitter wall /Panel mount type, Range FRC-0-10 ppm, Complete plate mounted system, (The Analyzer must be pre wired on plate,we will provide only power supply & pipe connection system) and all complete as per the direction of Engineer-in-charge. make (Forbes Marshall/Tethys/Horiba/Hach) |
| 42 | Supply, installation, testing & commissioning of Chemical earthing System with Backfill compound covered with earthpit and cover including transportation to site, unloading etc. all complete as per direction of Engineer-in-charge |
| 43 | Designing, Supplying, Installing, commissioning & testing with Terminating & Interfacing of 2 C x 1.5 sq.mm as per IS 694 twisted shielded copper armoured conductor on wall in GI tray or in ground suitable for supplied DC Voltage and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 44 | Supplying and erecting armoured control cable with ISI mark stranded / solid copper conductor 1.1 kV grade complete erected on wall / panel or in provided trench in an approved manner. 4c X 2.5 sq mm Copper conductor PVC insulated, armoured control cable and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 45 | Designing, Supplying, Installing, commissioning & testing with Terminating & Interfacing of 2 pair x 1.0 sq.mm. as per IS 694 copper shieled, twisted, multistraned armoured cable on wall in GI tray or on ground and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 46 | Automation of CWR |
| 47 | Supplying, Fitting,fixing & Commissioning,of The body PN-16 and cover will be ASTM A536 Ductile lion can be integrated w ith PLC panel for operation with a minimum pressure in upstream 0.2 kglcm2 to a maximum pressure of 8 kglcm2. The valve seat shall be a solid, one-piece SS-316 desian and shall have a minimum five-degree taper on the se ating surf ace for a positive , drip-tight shut off. The diaphragm assembly shall contain a self-cleaning S5-303 stainless steel stem of sufficient diameter to withstand high hydraulic pressure differentials and shallbe fully guided atits both ends by a bearing in the main valve cover and an integral bearing in the valve seat, in order to be pr actically in balance along its fullift for limiting encessive friction, thus incre asing its ability| to react when performing a correction. The diaphragm shall not be usedias the seating surface and it shall be fully |supported by machined surfaces of the valve body or cover in its closed or opened position. In operating position, its inactive surface shall be completely supported for securing its maximum longevity. The control willbe achieved by, operating 2 number Solenoid Valves mounted on the main Valve. The Connecting tubing on the Main Valve willbe SS with |SS fiting from reputed companies makes. The flexible tubing on Main valves will not be allowed. of the approved make:(Make- KROHNE MARSHALLIE & HIABBISIEMENS/ Equivalent make with approval of authority) to control water supply, including cost of material with all taxes transporatation to sitel storage with insurance. |
| 48 | 200 mm |
| 49 | Pressure Transmitter :Designing, Supplying, Installing, commissioning & testing of pressure transmitter CE markd with following technical parameters at Raw Water Pump House and Interfacing with PLC panel including mounting arrangement along with snubber and needle valve, 1.0 sq.mm 2 core copper braided screen cable Wire, screw, grip & clamp for DI / MS pipe fitting.Output 4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.1 % of full scaleor betterEnclosure- IP 68 all complete as per the direction of Engineer-in-charge. |
| 50 | Provision of Glycerine filled Pressure Gauge with fittings & isolation ball valve with socket including cost of all materials, Transportation to site etc all complete all labours, T&P etc. all complete as per the direction of Engineer-in-charge. |
| 51 | Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. all Complete Works Screened cable unarmoured and all complete as per specification and the direction of Engineer-in-charge. |
| 52 | 1.5 sqmm 4 C CU AR Shielded Cable |
| 53 | 1.5 sqmm 2 CU AR Shielded Cable |
| 54 | Instrument Cable- 2 Pair 1.5 mm2 cable |
| 55 | HDPE PIPE: Supply and Laying of 40MM dia HDPE pipe (Make: Supreme/ equvalent) in cable trench or buried as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 56 | Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. as per specification. all Complete Works Screened cable unarmoured. |
| 57 | CAT-6 Dlink cable |
| 58 | Supplying all materials,labour,t&p and fixing of PLC Compatable ATV930-VFD, HEAVY DUTY 16AMP, WITH BREAKING UNIT VFD floor mounted with Control Panel made out of 2MM C.R Powder coated sheet & alluminium Bus Barinter connected with copper wire and lugsh having 50KA-125A MCCB including spreader link and extended ROM-1 No ,RY Bindicator-1set, digital ammeter-1No digital volt meter- 1No, 4A control all complete as per specification and the direction of Engineer-in-charge. |
| 59 | Upto VFD-37 KW (1W+1S) |
| 60 | CWR (Clear Water Reservoir) Designing, Supplying, Installing, commissioning & testing of Ultrasonic level transmitter CE marked with following technical parameters Interfacing with PLC panel including mounting arrangement.Output-4-20 mA / HART Power supply - 24V DC ext.,Display - 4\\" LED ,Range- 0-10 mtr - 20 mtr.,Accuracy - +/- 0.25% of Full Scale or better ,Enclosure- IP 68 ,Mounting - On PLC panel. |
| 61 | Supply & installation of full-bore type electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS |
| 62 | 250mm dia |
| 63 | Supply, installation, testing & commissioning of Chemical earthing System with Backfill compound covered with earthpit and cover including transportation to site, unloading etc. all complete as per direction of Engineer-in-charge |
| 64 | Automation of MCC Room and Civil Work |
| 65 | Design, manufacture, supply, installation, testing and commissioning of indoor type PLC panel of size approx. 1200 mm X 700 mm X 1500mm (LBH), fabricated out of min. 2 mm thick CRCA sheet powder coated to Siemens gray color.The Panel shall be provided with reputed make PLC with following accessories as well as input output configuration. The PLC shall be programmed with IEC 61131 standards for control, monitoring and communication of equipments & instruments at WTP Plant (raw water monitoring, alum dosing control,clariffaculator operation & control, recirculation & mud pump operation). PLC shall have Ethernet port & protocal for Modbus TCP communication with following IO DI –72 num ,DO – 40 num ,AI –12 num ,AO – 4 num 10 inch color TFT HMI complete with programming shall be provided to interact with PLC The panel shall include all the accessories (not limited to following) to achieve purpose of smooth & trouble free operation of WTP plant. MCB 16A DP – 3 num MCB 10A DP – 1 num MCB 4A DP – 4 num, 24 VDC Power Supply 10A – 1 num,Push Buttons – 30 num Selector Switch -16 num Control Contactor – 16 num Annunciator with 12 Windows NO to NC Type,Electronic Hooter – 1 num Control Transformer – 1 num Emergency PB – 1 num Panel Cooling Fan – 1 num,Panel Light with Door Switch – 1 num Control Indication Lamp – 16 num Wiring + TB etc – 1 lot,Hardware – 1 lot. complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 66 | Design, manufacture, supply, installation, testing and commissioning of SCADA System for WTP Plant, Sand Filter beds & pump house.Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares. PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW,Rs232 & Rs485 port, 2no RJ45 ports, Keyboard, Optical Mouse,32 inch color TFT Monitor, Latest Windows Pro OS, Microsoft Office & Antivirus & Internet Sequrity software for 5 years license.SCADA Software of reputed company with developer & runtime license with minimum 512 number of Tags with following features & functions.1. Supervise real-time data in the form of graphical presentation.2. Control WTP processes locally or through Remote locations.3. Dynamic process Graphic, It should resemble the process mimic. SCADA should have good library of symbols so that develop the mimic as per required. When operator sees the screen he should know what’s going in plant.4. Alarm summery & Alarm history, SCADA system must be able to detect, display, and log alarms and events. When there are problems the SCADA system must notify the operators to take corrective action.5. Acquire real-time data as well as logs data with Real time trend & Historical time trend.6. Web Connectivity, Real-time displays can be accessed on remotely attached PCs and notebooks using internet.SCADA Programming shall be done so as operator can visualize and control complete WTP operation from operator desk. All important alarms & events shall be logged. All the data from field instruments & equipments shall be logged. There shall be provision to take reports in required formats of real time & historical data, events & alarms. There shall be provision of broadcasting messages, emails of reporting information. There shall be provision of access security.An Industrial grade Din rail mounting ethernet switch with 5 ports shall be provided. An Industrial grade modem with 4G/5G LTE connectivity shall be provided complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 67 | Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system for 1hour backup including cables power plug, switch etc. all complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 68 | Supply, Installation and commissioning of Windows based PC with latest configuration & OS complete with necessory office & antivirus softwares.PC configuration shall not be less than Intel i5 10th Gen CPU, 16 GB Ram, 128 GB SDD, 500 GB HDD, DVD RW, Rs232 &Rs485 port, 2 RJ45 ports, Keyboard, Optical Mouse, 32 inch color TFT Monitor, Latest Windows Pro OS, Microsoft Office & Antivirus & Internet Sequrity software for 3 years license complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 69 | Supply, Installation, Testing, Intgeration & Commissioning of 43\\" LCD monitor at Conf. Room for display of total water system (Online) complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 70 | Supply of 1TB SSD (Solid State Device) for RAM and complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 71 | Supply, Installation and commissioning of OFC Splicing with pigtails and complete as per specification and directions of Site Engineer /Engineer-in-Charg |
| 72 | Supply the Fibre Pigtail/patch cord 1 mtr and complete as per specification and directions of Site Engineer /Engineer-in-Charg |
| 73 | Supplying,Installation & testing of network gateway(RTU), often including firewall, VPN, and traffic management features of (Firewall throughput 7000Mbps, Firewall IMIX - 2900Mbps, IPS throughput - 1355Mbps, Threat protection throughput - 330Mbps, Concurrent Connection - 1600000, New connection/sec - 44400, Xstream SSL/TLS Inspection - 420Mbps, Xstream SSL/TLS Concurrent connections - 81924G and comlpeted as per specification and Engineering_In-Charges. |
| 74 | Desiging, supplying, installing, commissioning & testing of CCTV IR water proof camera suitable for upto 100ft.with IR Dome camera, control key board, DVR, Hard Disk, cables, UPT transreceivers etc. complete. Make- Hikvision, CP Plus, Evision, Honeywell and complete as per specification and directions of Site Engineer /Engineer-in-Charge |
| 75 | Supply, installation, testing & commissioning of Chemical earthing System with Backfill compound covered with earthpit and cover including transportation to site, unloading etc. all complete as per direction of Engineer-in-charge |
| 76 | Supply, Installation of Control Desk -1 no., Table - 1 no. & Chairs - 2 nos. at Control Room and completed as per Engineering-In-Charge. |
| 77 | Supply, Installation and commissioning of AC 1.5 Ton 5 Star and completed as per Ingineering-In-Charge. |
| 78 | CABLE TRENCH: Excavation in unpaved areas of earth in work sites for conventional cable trenches for a depth upto 1.2metres or below towards laying of 40mm dia HDPE pipe along water Pipeline including backfilling the trench, job complete in all respects, including all labour and materials and complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 79 | Supply, Installation and commissioning of Hot Dip Galvanised Tees for Cable Tray and complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 80 | Supply, Installation and commissioning of Hot Dip Galvanized Bends for Cable Tray and complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 81 | Supply, Installation and commissioning of cable tray 80mm width to wall, celling with necessary bracket, for laying of power and data cable etc.and complete as per specification and directions of Site Engineer /Engineer-in-Charge.. |
| 82 | Supply Installation of Laserjet Colour Printer and complete as per specification and directions of Site Engineer /Engineer-in-Charge.. |
| 83 | Automation Room Civil Work |
| 84 | Design, Drawing and Construction of RCC frame structure with brickwork wall single store dbuilding(Control Center System Room, Electrical Sysstem Room, Toilet) for SCADA control room with Toilet block at Intake site, WTP site , complete as per the direction of Engineer-in-charge.(40sqm Intake and 60sqm (WTP and Zone-1 )). |
| 85 | 8M X 5M Control Room |
| 86 | 10 x 5 M Control Room |
| 87 | Supply of all material,labour, T&P for PH work and Electrification Work and chairtable, almera,etc of SCADA controlroom, completeas per the direction of Engineer-in-charge(10% of frame structure) |
| 88 | Automation of Distribution Network of Zone-1 |
| 89 | HDPE PIPE: Supply and Laying of 40MM dia HDPE pipe (Make: Supreme/ equvalent) in cable trench or buried as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 90 | Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints Screened cable unarmoured etc all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge. |
| 91 | CAT-6 Dlink cable |
| 92 | Supply and installation of MS pipe including required numbers of bends and flanges and dismentaling joint etc required for installation of DMA control units (i.e- Globe valve, flow meter, PG, PT etc.) and fiber cover over the arrangement fixing on CC(1:3:6) platform including cost of all materials, labour for fitting and fixing etc. all complete.as per site requirement and as per the direction of the engineer in charge.( excluding cost of Sluice valve, flow meter, PG, PT.) |
| 93 | 200 mm |
| 94 | 250 mm |
| 95 | Supply with fitting and fixing of of D.I. Mechanical Dismantling Joints for use to main uninterrupted water supply in the pipeline in case of repair of Flow meter as per specification and direction of Enginer - in - charge |
| 96 | 200 mm |
| 97 | 250 mm |
| 98 | CONTROL ROOM PLC for ESR/Hill Top OGR and Distribution system OPERATION: Supply all material, labour T&P for installation & testing commissioning of PLC System of appropriate capacity & sufficient provision of digital & analog input and output to rum the plant & machineries within the campus limit, with minimum 20% spare cards, being operated locally at ESR campus, with provision of PLC operation (On & Off) of feed pump with respective Chlorine analyzer with an architecture of maintaining water quality in distribution pipeline at identified location. Complete operation of the feed pump depends upon the water quality communicated via point to point(P2P) signal from the remote analyzer unit to main PLC. Provision should be there for LIVE data communication (by agency) between the PLC panels through FO Cable for the operation (on & off) of clear water Well Pumps as per the water requirement at MBR. Local data storing facility should be there and for monitoring and analysis as per the user needs and report generation. (The Cost is inclusive of cost of materials, installation & successful commissioning etc) The PLC & all necessaries shall be of high standard make all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge. (Schneider/Siemens/Rockwell). |
| 99 | Supply, Installation, Testing, Intgeration & Commissioning of 43\\" LCD monitor at Conf. Room for display of total water system (Online) complete as per specification and directions of Site Engineer /Engineer-in-Charge. |
| 100 | Supply,Installation & Commissioning of SCADA software (Make-Schiender/Simens/Rockwell) and cost for development of 24x7 distribution management system software, with Graphical processor visualisation Advanced alarm management, historical and Real time trending, Built-in-reporting, Stastical process control, Multithreaded citect VBA and Cicode programming language including installations of Desk top PC, Modem for receiving data etc all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 101 | Supplying,Installation & testing of 4G/5G Dual Sim LTE Router with 1 X LAN, 1 X WAN, RS485 on board with one at a time usage, WI-FI (802.11 b / g / n), 1 X Cellular Antenna, 1 X WIFI Antenna, Model- SW245 (RS485) Make- SWTPL and comlpeted as per Ingineering_In-Charge. |
| 102 | Supply, Installation and commissioning of single phase 1KVA online UPS with pure sine wave & float cum boost charging with battery rack and maintenance free battery system including cables power plug, switch having application in 24V lot DC Battery (drytype) charging to output continuous 3 hrs power backup all Complete Works and all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge |
| 103 | Supply, Installation and commissioning of Control cables to be inserted in conduit pipe in trenches, cables to be laid in racks, cleated on walls, cable lugs, cables glands, conduits, cablejoints etc. as per specification. all Complete Works Screened cable unarmoured and comlpeted as per Ingineering_In-Charge. (Make:- Finolex/L&T/Anchor/Havells/V-Guard/Equivalent Make with approval of the Authority) |
| 104 | 1.5 sqmm 4 C CU AR Shielded Cable |
| 105 | 1.5 sqmm 2 CU AR Shielded Cable |
| 106 | Instrument Cable- 2 Pair 1.5 mm2 cable |
| 107 | Supplying, Fitting,fixing & Commissioning,of The body PN-16 and cover will be ASTM A536 Ductile lion can be integrated w ith PLC panel for operation with a minimum pressure in upstream 0.2 kglcm2 to a maximum pressure of 8 kglcm2. The valve seat shall be a solid, one-piece SS-316 desian and shall have a minimum five-degree taper on the se ating surf ace for a positive , drip-tight shut off. The diaphragm assembly shall contain a self-cleaning S5-303 stainless steel stem of sufficient diameter to withstand high hydraulic pressure differentials and shallbe fully guided atits both ends by a bearing in the main valve cover and an integral bearing in the valve seat, in order to be pr actically in balance along its fullift for limiting encessive friction, thus incre asing its ability| to react when performing a correction. The diaphragm shall not be usedias the seating surface and it shall be fully |supported by machined surfaces of the valve body or cover in its closed or opened position. In operating position, its inactive surface shall be completely supported for securing its maximum longevity. The control willbe achieved by, operating 2 number Solenoid Valves mounted on the main Valve. The Connecting tubing on the Main Valve willbe SS with |SS fiting from reputed companies makes. The flexible tubing on Main valves will not be allowed. of the approved make:(Make- KROHNE MARSHALLIE & HIABBISIEMENS/Equivalent make with approval of authority) to control water supply, including cost of material with alltaxes transporatation to sitelstorage with insurance. |
| 108 | 200 mm |
| 109 | 250 mm |
| 110 | Providing, installation, testing and commissioning of Diaphragm Type Pressure Gauges Dial size 150 mm glycerin filled shatterproof glass, Over range protection: 125% of maximum pressure, Material of sensor and other wetted parts: SS type 316, Housing material: Die cast aluminum with linear scale and all complete as per the direction of Engineer-in-charge. |
| 111 | Pressure Transmitter :Designing, Supplying, Installing, commissioning & testing of pressure transmitter CE markd with following technical parameters at Raw Water Pump House and Interfacing with PLC panel including mounting arrangement along with snubber and needle valve, 1.0 sq.mm 2 core copper braided screen cable Wire, screw, grip & clamp for DI / MS pipe fitting.Output 4-20 mA / HARTPower supply - 24V DC ext.Display - 4\\" LEDAccuracy - +/- 0.1 % of full scaleor betterEnclosure- IP 68 and all complete as per the direction of Engineer-in-charge. |
| 112 | Supplying all materials Labour & T&P for Fixing of DI tamper proof Kinatic Air Valve P.N 1.0 for water works purposes conforming to IS specification for the following nominal diameters as per specification complete including cost of Air valve and isolation valve all complete and as per the direction of Engineer-in-charge. |
| 113 | 50 mm dia |
| 114 | Supply, installation, testing & commissioning of online Chlorine Analyser with following technical specification. i.e.Single Channel free Chlorine Analyser, FRC sensor with 10 feet cable (with manual PH compensetion), Complete system pre mounted on plate with FTC sensors, Power supply110-240VAC, Transmitter wall /Panel mount type, Range FRC-0-10 ppm, Complete plate mounted system, (The Analyzer must be pre wired on plate,we will provide only power supply & pipe connection system) and all complete as per the direction of Engineer-in-charge. make (Forbes Marshall/Tethys/Horiba/Hach) |
| 115 | Supplying all materials,labour and T&P and constructing brick masonry chamber as per P.H. specification and design all complete including RCC Cover Slab(chamber internal size:-[3.00x2.00x1.50mtr] for SCADA Instrumentation) and all complete as per the direction of Engineer-in-charge |
| 116 | Designing, Supplying, Installing, commissioning & testing of Ultrasonic level transmitter CE marked with following technical parameters Interfacing with PLC panel including mounting arrangement.Output-4-20 mA / HART Power supply - 24V DC ext.,Display - 4\\" LED ,Range- 0-10 mtr - 20 mtr.,Accuracy - +/- 0.25% of Full Scale or better ,Enclosure- IP 68 ,Mounting - On PLC panel at ESR/UGR and all complete as per the direction of Engineer-in-charge |
| 117 | Supply & installation of full-bore type electromagnetic water flow meter at various locations for monitoring volume of water flow, with following technical specification: Drinking Water Application, Liner:- Hard rubber, Process Connection:- PN10, St37-2/FE 410W B, flange EN1092, Electrodes:- 1.4435/3161, Calibration: 0.5%, Approval: Nonhazardous area Housing Field Alu, Sensor IP68 NEMA6P, Cable, Remote Version: 20 m coll and signal cable, Power Supply: 20-28VDC /11-40VDC Display: 2-line, push buttons, all Complete Works as per specification and directions of Site Engineer / Engineer-in-Charge Make- KROHNE MARSHALL, E&H, ADEPT, ABB, SIEMENS |
| 118 | 200 mm dia |
| 119 | 250mm dia |
| 120 | Supply, Installation, Testing and commissioning of Chlorine Dosing machine incluiding laying of pvc pipe interconnection with main waterline, Chemical storage and handling equipment etc. 0-500 Lph Zeroleakge pneumatic diapharm dosing pump - 2nos, one primary and one standby mode, pressure upto-10bar, 1000 Ltr Chemical tank capacity. Agitator motor - 1nos, strainer, NRV on Pump Outlet, Electrically actute Flow control Valve with PLC compatible VFD Panel for dosing pump and agitator etc. transportation & packaging including cost of materials, all labours, T&P etc. all complete as per the direction of Engineer-in-charge. |
| 121 | Earthing: Providing Electrical system system's earthing as per latest IS 3043, and the work shall include the following: Earthing electrodes comprising of GI pipe 40mm dia 2.9 mm thick 2.5 mtrs long with mesh covered funnel. Digging 300mm dia earthing pits to suitable depth for buring the main electrodes in the pit. The pit shall be filled with alternate layers of salt and charcoal 150mm thick around the pipe to the entire depth. An inspection chamber of 300x300x300mm size shall be constructed with CC 1:3:6 prop. The chamber shall be provided with CI/MS cover hinged to the frame. The Electrical Metering & switching , encloser electrical equipment shall be connected to the earth pit through 4 Sqmm Cu (green) for equipment/PLC earthiing. |
| 122 | Supplying all materials,labour,t&p and fixing of PLC Compatable ATV930-VFD, HEAVY DUTY 16AMP, WITH BREAKING UNIT VFD floor mounted with Control Panel made out of 2MM C.R Powder coated sheet & alluminium Bus Barinter connected with copper wire and lugsh having 50KA-125A MCCB including spreader link and extended ROM-1 No ,RY Bindicator-1set, digital ammeter-1No digital volt meter- 1No, 4A control all complete as per specification and the direction of Engineer-in-charge. |
| 123 | VFD-Upto-37 KW (1W+1S) |
| 124 | Cutting of C.I /DI pipe by eletric arc welding,at site including cost of materials,labour,T & P etc all complete as directed by Engineer In-charge.(for DMA Creation in Distribution Network) |
| 125 | Supply installation testing & commissioning of Float Control valve to the fixed in UGR/OGR to shutup the incoming flow after filled up the reservoir & open automatically when water receeds in a particular level etc. complete as per direction of Engineer in charge.(At Zone-1,2&3 UGR/OGR) |
| 126 | OPERATION & MAINTANANCE FOR FIVE YEARS INCLUDING 18% GST & CONTIGENCY Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Oct 03, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedOct 22, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysOct 23, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 16 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender